Home > NRC Library > ADAMS Public Documents
FOIA/PA-2013-0030 - Resp 1 - Partial.
Accession Number: ML131280144
Date Released: Thursday, May 2, 2013
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML12220A536 - IR 05000391-12-605, on 06/30/2012, Watts Bar Nuclear Plant, Unit 2 Construction - NRC Integrated Inspection. (44 page(s), 8/7/2012)
- ML12167A212 - IR 05000391-12-604, on 04/01/2012 - 05/19/2012, Watts Bar Nuclear Plant, Unit 2, Construction - NRC Integrated Inspection Report. (44 page(s), 6/14/2012)
- ML12034A202 - IR 05000391-11-610, on 12/31/2011, Watts Bar Nuclear Plant, Unit 2, Construction-NRC Integrated Inspection. (40 page(s), 2/3/2012)
- ML120050183 - Watts Bar Nuclear Plant, Unit 2 - Request for Relief Regarding Use of American Society of Mechanical Engineers Boiler & Pressure Vessel Code Cases N-801 & N-802 (TAC No. ME7063). (10 page(s), 1/19/2012)
- ML11279A218 - Memo - Task Interface Agreement - Evaluation Of Compliance With Code For Examination Of Flange Stud Holes On The Replacement Vessel Head At The Davis-Besse Nuclear Power Station (TIA 2011-015). (5 page(s), 10/6/2011)
- ML112201418 - IR 05000391-11-605, on 07/02/11, Watts Bar Nuclear Plant, Unit 2. (68 page(s), 8/5/2011)
- ML110800483 - IR 05000391-11-602, on 01/01 - 02/19/2011, Watts Bar, Unit 2 Construction. (57 page(s), 3/18/2011)
- ML110410680 - IR 05000391-10-605, on 10/01/10 - 12/31/10, Tennessee Valley Authority. (107 page(s), 2/9/2011)
- ML102170465 - IR 05000391-10-603; 04/01/2010 - 06/30/2010; Tennessee Valley Authority; Watts Bar Nuclear Plant, Unit 2, NRC Integrated Inspection Report. (82 page(s), 8/5/2010)
- ML090291033 - IR 05000391-08-001, on 10/01/2008 - 12/31/2008; Tennessee Valley Authority; Watts Bar Nuclear Plant, Unit 2, Integrated Inspection Report. (30 page(s), 1/29/2009)
- ML083050404 - IR 05000391-08-009, on 07/01 -09/30/2008, Watts Bar Nuclear Plant Unit 2 Construction - NRC Integrated. (26 page(s), 10/30/2008)
- ML083090046 - Watts Bar, Unit 2, Preservice Inspection Program Plan and Request for Relief No. WBN-2/PDI-4. (77 page(s), 10/30/2008)
- ML082560373 - Watts Bar Nuclear Plant, Unit 2 - Request For Relief Regarding Alternative Rules For Renewal of Active or Expired N-Type Certificates (TAC MD8314). (8 page(s), 10/2/2008)
- ML12172A001 - Comparison of Non-Destructive and Destructive Examination Findings for a Leak Path Assessment of a Pressurized Water Reactor Control Rod Drive Nozzle. (17 page(s), 7/19/2012)
- ML12241A160 - NUREG/CR-7142 " Ultrasonic Phased Array Assessment of the Interference Fit and Leak Path of the North Anna Unit 2 Control Rod Drive Mechanism Nozzle 63 with Destructive Validation." (137 page(s), 8/31/2012)
- ML121350004 - Comparison of an Ultrasonic Phased Array Evaluation with Destructive Analysis of a Documented Leak Path in a Nozzle Removed from Service. (10 page(s), 5/14/2012)
- ML120800002 - Ultrasonic Phased Array Evaluation of Control Rod Drive Mechanism Nozzle Interference Fit and Weld Region - NDE Results and Destructive Analysis. (14 page(s), 3/20/2012)
- ML122990315 - Vermont Yankee Nuclear Power Station - 8/22/12 E-mail from J. Devincentis to R. Guzman re: Draft Steam Dryer RAI Response. (1 page(s), 8/22/2012)
- ML122990318 - Vermont Yankee Nuclear Power Station - 9/17/12 E-mail from P. Couture to R. Guzman re: Steam Dryer Call and Draft Steam Dryer RAI Response. (1 page(s), 9/17/2012)
- ML121520304 - Vermont Yankee - E-mail from R.Guzman to J. Devincentis - Request for Additional Information re: License Amendment to Revise OL Condition 3.S Regarding Steam Dryer Inspections (TAC No. ME7733). (2 page(s), 5/31/2012)
- ML12284A478 - Vermont Yankee, Technical Specifications Proposed Change 296, Supplement 1, Response to Request for Additional Information. (14 page(s), 10/3/2012)
- ML12046A849 - Surry Power Station, Unit 1, Review of the Steam Generator Tube Inservice Inspection Report for the Refueling Outage in 2010 (TAC No. ME6375). (4 page(s), 2/27/2012)
- ML12048A676 - Surry Power Station, Units 1 & 2 - Response to Request for Additional Information Related to License Amendment Request for Permanent Alternate Repair Criteria for Steam Generator Tube Inspection and Repair. (73 page(s), 2/14/2012)
- ML12054A679 - Issuance of Order to Modify Licenses With Regard to Reliable Spent Fuel Pool Instrumentation. (40 page(s), 3/12/2012)
- ML12056A044 - Order Modifying Licenses With Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) - To All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status. (36 page(s), 3/12/2012)
- ML120730304 - Surry Power Station, Unit Nos. 1 and 2 - Issuance of Amendments Regarding Virginia Electric and Power Company License Amendment Request for Permanent Alternate Repair Criteria for Steam Generator Tube Inspection and Repair (TAC NOS. ME6803 and ME6804). (31 page(s), 4/17/2012)
- ML12076A158 - Surry 2012 Request for Information Letter Rev. 1. (11 page(s), 3/14/2012)
- ML12087A350 - Surrey Power Station, Units 1 and 2 - Safety Evaluation Regarding License Amendment Request - Permanent Alternate Repair Criteria for Steam Generator Tube Inspection and Repair (TAC Nos. ME6803 and ME6804). (26 page(s), 3/27/2012)
- ML12089A274 - Mtg Ann -Surry Regulatory Conference - 2012. (6 page(s), 3/29/2012)
- ML12102A235 - Surry Nuclear Power Station Unit 1 - Notification of Inspection and Request for Information. (12 page(s), 4/11/2012)
- ML12109A270 - Surry Power Station, Unit Nos. 1 and 2 - Issuance of Amendments Regarding Virginia Electric and Power Company License Amendment Request for Permanent Alternate Repair Criteria for Steam Generator Tube Inspection and Repair (TAC Nos. ME6803 and ME6804). (39 page(s), 4/17/2012)
- ML12118A471 - Dominion's Answer Opposing Requests for Heariing. (10 page(s), 4/27/2012)
- ML12053A340 - Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights From the Fukushima Dai-Ichi Accident. (81 page(s), 3/12/2012)
- ML121910339 - Kewaunee, Millstone, Units 2 & 3, North Anna, Units 1 & 2, Surry, Units 1 & 2, 2011 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46. (29 page(s), 6/28/2012)
- ML12222A340 - Surry, Units 1 and 2, Proposed Technical Specifications to Adopt TSTF-510, "Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection," Using the Consolidated Line Item Improvement Process. (35 page(s), 7/31/2012)
- ML12279A308 - IR 05000280-12-011 & 05000281-12-011; Virginia Electric and Power Company; 07/30/2012 - 08/03/2012; Surry Power Station, NRC Triennial Fire Protection Inspection Report. (31 page(s), 10/4/2012)
- ML12056A050 - Enclosure 4 - Recommendation 2.3: Flooding. (9 page(s), 3/12/2012)
- ML12187A165 - Surry Power Station, Unit 2 - Response to Request for Additional Information 2011 Steam Generator Inservice Inspection Report. (7 page(s), 6/22/2012)
- ML12283A306 - Surry Nuclear Plant, Unit 2 - Notification of Inspection and Request for Information. (12 page(s), 10/4/2012)
- ML12122A885 - IR 05000327-12-002, 05000328-12-002, on 1/1/2012 - 3/31/2012 Sequoyah Nuclear Plant, Units 1 & 2, Adverse Weather Protection, Fire Protection, Flood Protection Measures, Evaluation of Changes, Tests, or Experiments, & Permanent Plant Modifications,..... (54 page(s), 4/30/2012)
- ML12216A259 - IR 05000327-12-003 & 05000328-12-003; Tennessee Valley Authority; 04/01/2012 - 06/30/2012; Sequoyah Nuclear Plant, Unit 1 and 2, Integrated Inspection Report 2012003. (29 page(s), 8/1/2012)
- ML120370286 - Fermi 2 - Evaluation of Applicable Ten Year Interval Inservice Inspection Relief Request - Use of Boiling Water Reactor Vessel and Internals Project (BWRVIP) Guidelines in Lieu of Specific ASME Code Requirements. (11 page(s), 2/17/2012)
- ML12128A426 - North Anna Power Station, Unit 1, Relief Request N1-14-NDE-007, Approval to Extend the Fourth Interval First Period for Reactor Vessel Interior VT-3 Visual Examination (B-N-1). (8 page(s), 4/26/2012)
- ML12207A062 - North Anna Power Station, Units 1 and 2 - Relief Request N1-14-NDE-007 to Extend the fourth 10-Year first Period for the Reactor Vessel Interior VT-3 Visual Examination (TAC NO. ME8493). (8 page(s), 7/27/2012)
- ML12228A723 - Catawba Nuclear Station, Units 1 and 2 - Proposed Relief Request 11-CN-001 for the Third Ten-Year Inservice Inspection Interval (TAC Nos. ME7277-ME7283). (31 page(s), 8/20/2012)
- ML12131A564 - IR 05000280-12-002, 05000281-12-002, on 03/31/2012, Surry Power Station, Units 1 and 2; Identification and Resolution of Problems. (29 page(s), 5/10/2012)
- ML12213A543 - IR 05000280-12-003 & 05000281-12-003; Virginia Electric and Power Company; 04/01/2012 - 06/30/2012; Surry Power Station, NRC Integrated Inspection Report. (39 page(s), 7/31/2012)
- ML12242A347 - Surry, Unit 1, Inservice Inspection Owner's Activity Report (OAR). (11 page(s), 8/16/2012)
- ML120260681 - NUREG/CR-7110 Vol 2 "State-of-the-Art Reactor Consequence Analyses Project: Surry Integrated Analysis". (559 page(s), 1/31/2012)
- ML120330272 - NRC Information Notice 2012-11: Age Related Capacitor Degradation. (5 page(s), 7/23/2012)
- ML12108A026 - Quad Cities, Unit 2, Response to Request for Additional Information Regarding Relief Request 14R-19 and Additional Followup Question on the Flaw Evaluation. (39 page(s), 4/14/2012)
- ML13127A429 - FOIA/PA-2013-0030 - Resp 1 - Partial. (17 page(s), 4/24/2013)
- ML13127A279 - Draft Memo from M. Mitchell, NRR to R. Pascarelli, NRR on Request for Additional Information Related to Request for Relief for Fermi, Unit 2 Reactor Vessel Internal Components. (4 page(s), 4/24/2012)
- ML13127A280 - Draft - Thermo-Mechanical Analysis of Pressure Vessels. (9 page(s), 4/24/2013)
- ML13127A281 - Quality Assurance of Chapter 9: Definition of the Beltline. (5 page(s), 4/24/2013)
- ML13127A283 - Quality Assurance of Chapter 9: Definition of the Beltline. (11 page(s), 4/24/2013)
- ML13127A284 - Quality Assurance of Chapter 10: Requirements for Nozzles. (3 page(s), 4/24/2013)
- ML13127A285 - Quality Assurance of Chapter 11: Requirements on Upper Shelf Energy. (15 page(s), 4/24/2013)
- ML13127A287 - Flowchart for Creating PWR Cooldown P-T Curves. (12 page(s), 4/24/2013)
- ML13127A288 - Allowable Pressure for Benson Transient Number 1 Calculated per ASME Code Versus Actual P. (4 page(s), 4/24/2013)
- ML13127A306 - Originator: G. Stevens, Objectives List. (2 page(s), 4/24/2013)
- ML13127A310 - Email from G. Oberson to J. Collins, Subject: Leak Path Assessment Work. (1 page(s), 1/3/2012)
- ML13127A311 - Email from B. Hanson to G. Oberson, Subject: N6783 Work. (2 page(s), 1/3/2012)
- ML13127A312 - Email from B. Hanson to G. Oberson, Subject: RE: MRP Abstract. (1 page(s), 1/4/2012)
- ML13127A313 - E-mail from J. Poehler to G. Cheruvenki, RE: Core plate components - Fermi. (1 page(s), 1/9/2012)
- ML13127A314 - Email from S. Freeman to D. Failla, FW: Meeting With Westinghouse/PCI to Discuss Site Activities. (2 page(s), 1/17/2012)
- ML13127A315 - Email from R. Haag to T. Nazario, RE: Mockup for RPV Stud Hole Sleeving. (1 page(s), 1/26/2012)
- ML13127A316 - Email from G. Cheruvenki to A. Hon, et al., FW: Acceptance Review - Vermont Yankee steam dryer inspections. (1 page(s), 2/1/2012)
- ML13127A317 - Email from T. Scarbrough, NRO to J. Kim, NRR et al. RE: Acceptance Review - Vermont Yankee steam dryer inspections. (2 page(s), 2/7/2012)
- ML13127A318 - Draft Regulatory Evaluation, 2.0. (9 page(s), 2/7/2012)
- ML13127A329 - Email from R. Lewis to R. Monk, RE: I forgot and left the SR you handed me on your desk, if you can send me the #. Also... (1 page(s), 2/7/2012)
- ML13127A382 - NUREG/CR-XXXX PNNL-XXXXX Ultrasonic Phased Array Assessment of the Interference Fit and Leak Path of the North Anna Unit 2 Control Rod Drive Mechanism Nozzle 63 with Destructive Validation, Cover through 5-14. (74 page(s), 1/31/2012)
- ML13127A331 - NUREG/CR-XXXX PNNL-XXXXX Ultrasonic Phased Array Assessment of the Interference Fit and Leak Path of the North Anna Unit 2 Control Rod Drive Mechanism Nozzle 63 with Destructive Validation, 5.4 through End. (52 page(s), 1/31/2012)
- ML13127A339 - Email from J. Poehler to C. Basavaraju, FW: Peer Review of SE Input for Vermont Yankee Core Plate Bolt Analysis. (2 page(s), 2/14/2012)
- ML13127A340 - Email from J. Poehler to G. Cheruvenki, FW: Peer Review of SE Input for Vermont Yankee Core Plate Bolt Analysis. (1 page(s), 2/14/2012)
- ML13127A332 - Email from J. Poehler to P Purtscher, RE: Peer Review of SE Input for Vermont Yankee Core Plate Bolt Analysis. (2 page(s), 2/14/2012)
- ML13127A333 - Email from J. Poehler to G. Cheruvenki, RE: Peer Review of SE Input for Vermont Yankee Core Plate Bolt Analysis. (2 page(s), 2/14/2012)
- ML13127A334 - Regulatory Evaluation, 2.0. (9 page(s), 2/15/2012)
- ML13127A335 - Email from J. Poehler to C. Basavaraju re: Peer Review of SE Input for Vermont Yankee Core Plate Bolt Analysis. (2 page(s), 2/15/2012)
- ML13127A336 - Email from J. Poehler to P. Purtscher, RE: Peer Review of SE Input for Vermont Yankee Core Plate Bolt Analysis. (2 page(s), 2/15/2012)
- ML13127A337 - Email from J. Poehler to C. Basavaraju, RE: Peer Review of SE Input for Vermont Yankee Core Plate Bolt Analysis. (2 page(s), 2/22/2012)
- ML13127A363 - Email from G. Cheruvenki to J. Kim, RE: Inspections - Steam Dryer - Todays Meeting at 1:00 P.M. (2 page(s), 2/23/2012)
- ML13127A364 - Email from G. Cheruvenki to J. Kim, RE: Inspections Steam Dryer - Todays Meeting at 1:00 P.M. (1 page(s), 2/24/2012)
- ML13127A365 - Email from T. Scarbrough to K. Kim et al, RE: VY Steam Dryer Inspection Reports. (2 page(s), 2/28/2012)
- ML13127A366 - Email from T. Nazario to R. Haag, et al, FW: RV Stud Hole Remediation Demonstration - Lake Bluff, IL. (2 page(s), 3/5/2012)
- ML13127A362 - Presentation: SPIE Smart Structures/NDE 2012- Ultrasonic Phased Array Evaluation of Control Rod Drive Mechanism (CRDM) Nozzle Interference Fit and Weld Region NDE Results and Destructive Analysis. (29 page(s), 3/31/2011)
- ML13127A368 - Memo from M. Case to P. Hiland, Subject: Review of Draft NUREG/CR - XXXX Entitled, "Ultrasonic Phased Array Assessment of the Interference Fit and Leak Path of the North Anna Unit 2 Control Rod Drive Mechanism Nozzle 63 with Destructive Validation". (117 page(s), 3/13/2012)
- ML13127A369 - Memo from M. Murphy to G. Wilson, Subj: Safety Evaluation Regarding Vermont Yankee Nuclear Power Station Core Plate Hold Down Bolt Inspection Plan and Analysis (TAC ME6248). (17 page(s), 3/15/2012)
- ML13127A370 - Ultrasonic Phased Array Evaluation of Control Rod Drive Mechanism (CRDM) Nozzle Interference Fit and Weld Region - NDE Results and Destructive Analysis. (7 page(s), 3/19/2012)
- ML13127A372 - Email from J. Poehler to G. Cheruvenki, RE: MRP-227 - Plant Submittals. (1 page(s), 3/20/2012)
- ML13127A374 - Email from J. Poehler to A. Hiser, et al, RE: MRP-277 - Plant Submittals. (1 page(s), 3/20/2012)
- ML13127A418 - Email from T. Nazario to J. Seat, RE: Report Inputs. (1 page(s), 4/3/2012)
- ML13127A419 - Email from J. Kim to J. Kim, et al, RE: VY Steam Dryer Inspection Reports. (2 page(s), 4/4/2012)
- ML13127A420 - Email from J. Poehler to S. Rosenberg, RE: Accomplishments for March. (1 page(s), 4/4/2012)
- ML13127A421 - Email from J. Kim to G. Cheruvenki, et al, RE: VY Steam Dryer Inspection Reports. (3 page(s), 4/5/2013)
- ML13127A422 - Email from T. Scarbrough to J. Kim, et al, RE: VY Steam Dryer Inspection Reports. (3 page(s), 4/6/2012)
- ML13127A423 - Email from R. Guzman to W. Jessup, RE: VY Steam Dryer Inspection Reports. (5 page(s), 4/11/2012)
- ML13127A425 - Email from B. Hanson to G. Oberson, Subject: RE: meeting with industry on Nozzle 63 work. (1 page(s), 4/11/2012)
- ML13127A426 - Email from S. Crawford to G. Oberson, Subject: RE: meeting with industry on Nozzle 63 work. (2 page(s), 4/11/2012)
- ML13127A427 - Email from G. Oberson to J. Collins, Subject: nozzle 63 meeting. (1 page(s), 4/11/2012)
- ML13127A428 - Email from S. Crawford to G. Oberson, Subject: RE: meeting with industry on Nozzle 63 work. (2 page(s), 4/11/2012)
- ML13129A011 - Email from J. Collins to R. Swain, Subject: Setting up a conference call on PNNL's ultrasonic leak path work on NA Nozzle #63. (1 page(s), 4/11/2012)
- ML13129A002 - Email from J. Collins to R. Swain, Subject: Setting up a conference call on PNNL's ultrasonic leak path work on NA Nozzle #63. (1 page(s), 4/12/2012)
- ML13129A003 - Email from A. Cinson to G. Oberson, Subject: RE: meeting with industry on Nozzle 63 work. (1 page(s), 4/16/2012)
- ML13129A004 - Email from G. Oberson to J. Collins, Subject: RE: Setting up a conference call on PNNL's ultrasonic leak path work on NA Nozzle #63. (2 page(s), 4/16/2012)
- ML13129A005 - Email from M. Benson to M. Kirk, RE: Draft J-R Data Scumming Letter. (1 page(s), 4/17/2012)
- ML13129A006 - Email from M. Benson to G. Stevens, RE: Draft J-R Data Scumming Letter. (2 page(s), 4/17/2012)
- ML13129A007 - Email from M. Benson to D. Alley, RE: North Anna Event Info. (1 page(s), 4/18/2012)
- ML13129A008 - Email from M. Benson to H. Rathbun, RE: Just Let Me Know if I Can Help with n anna stuff. (1 page(s), 4/19/2012)
- ML13129A009 - Email from J. Poehler to V. Sreenivas, RE: Missed Exam. (3 page(s), 4/27/2012)
- ML13129A010 - Comparison of an Ultrasonic Phased Array Evaluation with Destructive Analysis of a Documented Leak Path in a Nozzle Removed from Service. (9 page(s), 4/30/2012)
- ML13129A013 - Email from M. Benson to Bud Brust, RE: North Anna WRS Analysis with Discussion. (1 page(s), 5/7/2012)
- ML13129A014 - Email from G. Oberson to J. Collins, Nozzle 63 Draft NUREG. (1 page(s), 5/9/2012)
- ML13129A015 - Email from M. Benson to G. Stevens, RE: Realistic Transient Slides. (1 page(s), 5/11/2012)
- ML13129A016 - Email from J. Collins to M. Gavrilas, FW: Closeout of Y020120062 - NRR Review of Draft NUREG/CR-XXXX, Entitled, Ultrasonic Phased Array Assessment of the Interface Fit and Leak Path of the North Anna Unit 2 Control Rod Drive Mechanism Nozzle. (2 page(s), 5/11/2012)
- ML13129A017 - Email from A. Cinson to Lareauip(Westingqhouse.com; Jspanner()Epri.com, Discussions on Nozzle 63 work. (1 page(s), 5/11/2012)
- ML13129A018 - Email from S. Crawford to G. Oberson, RE: Status of NUREG/CR. (1 page(s), 5/14/2012)
- ML13129A019 - Email from S. Crawford to G. Oberson, RE: Status of NUREG/CR. (2 page(s), 5/14/2012)
- ML13129A020 - Email from B. Hanson to G. Oberson, Subject: RE: Status of NUREG/CR. (1 page(s), 5/14/2012)
- ML13129A021 - Email from G. Oberson to B. Hanson, Subject: RE: Status of NUREG/CR. (1 page(s), 5/15/2012)
- ML13129A023 - Email from S. Crawford to G. Oberson et al., Subject: RE: Following Up On - NUREG Comments. (1 page(s), 5/30/2012)
- ML13129A024 - Email from R. Guzman to G. Cheruvenki, RE: Inspections - Steam Dryer - Todays Meeting at 1:00 pm. (19 page(s), 5/30/2012)
- ML13129A025 - Email from A. Cinson to G. Oberson et al., Subject: RE: Following Up On NUREG Comments. (2 page(s), 5/31/2012)
- ML13129A026 - Email from S. Crawford to G. Oberson et al., Subject: RE: Following Up On NUREG Comments. (2 page(s), 5/31/2012)
- ML13129A027 - Email from S. Crawford to G. Oberson et al., Subject: RE: Following Up On NUREG Comments. (4 page(s), 5/31/2012)
- ML13129A028 - Email from M. Benson to A. Csontos, RE: RG 1.161 "Analysis of Existing JR Correlations for Regulatory Guide 1.161 Update." (3 page(s), 6/4/2012)
- ML13129A029 - Email from A. Cinson to G. Oberson et al., Subject: RE: Following Up On NUREG Comments. (1 page(s), 6/5/2012)
- ML13129A030 - Email from M. Benson to P. Purtscher, RE: 6-6-12 Draft MRP Update to RG1-161. (1 page(s), 6/6/2012)
- ML13129A031 - Email from G. Oberson to B. Hanson, Subject: SNF Issues. (1 page(s), 6/14/2012)
- ML13129A032 - Email from S. Crawford to G. Oberson, Subject: RE: Nozzle 63 Presentation for EPRI Materials Reliability Meeting. (2 page(s), 6/18/2012)
- ML13129A035 - Email from S. Crawford to G. Oberson, Subject: RE: Nozzle 63 Presentation for EPRI Materials Reliability Meeting. (1 page(s), 6/18/2012)
- ML13129A036 - Email from S. Crawford to G. Oberson, Subject: CRDM NUREG/CR. (1 page(s), 6/19/2012)
- ML13129A037 - Email from B. Hanson to G. Oberson, Subject: RE: CRDM NUREG/CR. (2 page(s), 6/19/2012)
- ML13129A038 - Email from G. Oberson to J. Collins, Subject: Nozzle 63 NUREG/CR. (1 page(s), 6/20/2012)
- ML13129A039 - Email from J. Poehler to J. Medoff, et al, FW: Background - Kewaunee RAI-MRP-227-A. (3 page(s), 6/25/2012)
- ML13129A040 - Meeting Scheduler, Subject: NRC Meeting to Discuss Reactor Vessel and Steam Generator Questions. (1 page(s), 6/26/2012)
- ML13129A041 - Email from J. Poehler to N. Salgado, et al, RE: SE by NRR, Fourth 10 Year Internal Inservice Inspection for North Anna. (6 page(s), 6/27/2012)
- ML13129A042 - Email from G. Oberson to J. Collins, Subject: NUREG/CR-7142. (1 page(s), 6/29/2012)
- ML13129A043 - Email from G. Oberson to B. Hanson, Subject: Vacuum Drying. (1 page(s), 7/5/2012)
- ML13129A044 - Email from B. Hanson to G. Oberson, Subject: RE: Vacuum Drying. (1 page(s), 7/6/2012)
- ML13129A046 - Email from G. Oberson to J. Collins, Subject: Nozzle 63 Journal Article. (1 page(s), 7/13/2012)
- ML13129A047 - Email from A. Cinson to G. Oberson, Subject: RE: Journal Article, Nozzle 63. (2 page(s), 7/16/2012)
- ML13129A048 - Email from B. Hanson to G. Oberson, Subject: FW: CRDM NUREG. (1 page(s), 7/16/2012)
- ML13129A049 - Email from G. Oberson to B. Hanson, Subject: RE: CRDM NUREG. (1 page(s), 7/16/2012)
- ML13129A050 - Email from B. Hanson to G. Oberson, Subject: FW: Project 59038/N6783 Due to Expire 7/31/12. (2 page(s), 7/17/2012)
- ML13129A051 - Email from J. Baptist to T. Nazario, RE: Please Send Me the List of Items to be Closed/Discussed Min IR 2011605. Need it by Wed. Since we Exit on Thurs. Thanks. (2 page(s), 7/17/2012)
- ML13129A052 - Presentation: (2012 EPRI Materials Reliability Conference and Exhibit) by M. Benson et al., NRC Office of Research, Subject: Thermomechanical Analysis of Pressure Vessels. (12 page(s), 11/14/2012)
- ML13129A053 - Email from B. Hanson to B. Hanson & G. Oberson, Subject: RE: Project 59038/N6783 due to Expire 7/31/12. (2 page(s), 7/20/2012)