Home > NRC Library > ADAMS Public Documents
Waterford, Unit 3 - Seismic Walkdown Report, Revision 1.
Accession Number: ML131200532
Date Released: Wednesday, May 8, 2013
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML13120A460 - Cover Letter, Waterford, Unit 3 - Submittal of Seismic Walkdown Report, Revision 1. (2 page(s), 4/25/2013)
- ML13120A461 - Engineering Report WF3-CS-12-00003, Revision 1, Wateford, Unit 3 Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Enclosure to W3F1-2013-0024, Pages 1 - 311 of 1014. (313 page(s), 3/25/2013)
- ML13120A464 - Engineering Report WF3-CS-12-00003, Attachment C, Rev. 0, "Safety Injection Sump Outlet Header B Isolation," Enclosure to W3F1-2013-0024, Pages 312 - 591 of 1014. (280 page(s), 3/25/2013)
- ML13120A466 - Engineering Report WF3-CS-12-00003, Attachment D, Rev. 0, "Area Walk-by Checklists (AWCs), Enclosure to W3F1-2013-0024, Pages 592 - 817 of 1014. (228 page(s), 3/25/2013)
- ML13120A462 - Engineering Report WF3-CS-12-00003, Attachment G, Rev. 0, "PEER Review Checklist for SWEL," Enclosure to W3F1-2013-0024, Pages 820 - 1014 of 1014. (195 page(s), 3/25/2013)