Home > NRC Library > ADAMS Public Documents
August 28, 2012, Summary of Meeting with Industry Stakeholders Regarding Pressure-Temperature (P-T) and Embrittlement Limits on Normal Operations.
Accession Number: ML12290A153
Date Released: Wednesday, October 31, 2012
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML12227A769 - August 28, 2012 Notice of Meeting with Industry Stakeholders Regarding Pressure-Temperature and Embrittlement Limits on Normal Operations. (5 page(s), 8/15/2012)
- ML12243A265 - Observations Regarding PWR Pressure-Temperature Limits. (9 page(s), 8/28/2012)
- ML12243A266 - Evaluation of Pressure-Temperature Limits for Normal RPV Startup and Shutdown. (21 page(s), 8/28/2012)
- ML12243A267 - Probabilistic Evaluation of Normal Operations, Cooldown, Heatup, and Leak Tests. (1 page(s), 8/28/2012)
- ML12289A035 - August 28, 2012, Summary of Meeting Regarding Pressure-Temperature (P-T) And Embrittlement Limits on Normal Operations. (5 page(s), 10/23/2012)