Home > NRC Library > ADAMS Public Documents
Diablo Canyon, Units 1 and 2 - Submittal of Quality Assurance Plan and Revised Phase 1 Documents for the License Amendment Request for Digital Process Protection System Replacement.
Accession Number: ML122220135
Date Released: Friday, August 17, 2012
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML12222A094 - Diablo Canyon, Units 1 and 2 - Submittal of Attachment 1, Quality Assurance Plan and Revised Phase 1 Documents for the License Amendment Request for Digital Process Protection System Replacement and Attachment 8 Affidavit 993754-AFF-38T. (16 page(s), 8/2/2012)
- ML12222A095 - Diablo Canyon, Units 1 and 2 - 08-0015-SP-001, "Functional Requirements Specification," Revision 5, Attachment 2. (80 page(s), 4/30/2012)
- ML12222A098 - Diablo Canyon, Units 1 and 2 - "Process Protection System Replacement Interface Requirements Specification (IRS)," Revision 6, Attachment 3. (53 page(s), 6/7/2012)
- ML12222A099 - Diablo Canyon, Units 1 and 2 - Invensys Operations Management Document 993754-1-916, "V10 Tricon Reference Design Change Analysis," Revision 0, Attachment 4. (13 page(s), 3/19/2012)
- ML12222A100 - Diablo Canyon, Units 1 and 2 - Invensys Operations Management Document 993754-1-802, "Software Verification and Validation Plan," Revision 2, Attachment 5. (89 page(s), 6/7/2012)
- ML12222A101 - Diablo Canyon, Units 1 and 2 - Invensys Operations Management Document 993754-1-813, "Validation Test Plan," Revision 1, Attachment 6. (43 page(s), 6/7/2012)
- ML12222A103 - Diablo Canyon, Units 1 and 2 - Invensys Operations Management Document 993754-1-906, "Software Development Plan," Revision 1, Attachment 7. (53 page(s), 7/11/2012)