Home > NRC Library > ADAMS Public Documents
FOIA/PA-2012-0121 - Resp 1 - Partial.
Accession Number: ML122000332
Date Released: Wednesday, June 20, 2012
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML12200A255 - FOIA/PA-2012-0121 - Resp 1 - Partial. (7 page(s), 6/12/2012)
- ML11294A349 - 2011/10/12 Davis-Besse LR - FW: Davis-Besse Commitment List through LRA Amendment 19 (60 page(s), 10/12/2011)
- ML11292A005 - G20110747/LTR-11-0568/EDATS: SECY-2011-0556 - Ltr. Rep. Edward J. Markey re: Safe Operation of the Davis-Besse Nuclear Power Plant. (4 page(s), 10/14/2011)
- ML11332A094 - G20110823/LTR-11-0620/EDATS: SECY-2011-0631 - Ltr from Rep. Dennis J. Kucinich re: Cracks in the Concrete Wall of the Shield Building of the Davis-Besse Power Plant. (7 page(s), 11/21/2011)
- ML11329A085 - Ltr 11/23/11 Acknowledgement Letter to Mr. Lochbaum Regarding Questions About the Shield Building Design at Davis-Besse. (2 page(s), 11/23/2011)
- ML11356A037 - 2011/11/30 Davis-Besse LR - DB RAI response letters 1 of 2 (775 page(s), 11/30/2011)
- ML113360416 - 12/15/2011 Notice of Public Meeting with First Energy Nuclear Operating Company to Discuss Their Technical Analysis Regarding Cracking Identified in the Davis-Besse Shield Building. (3 page(s), 12/2/2011)
- ML11336A355 - Ltr 12/2/2011 Davis-Besse CAL 3-11-001. (5 page(s), 12/2/2011)
- ML11348A043 - Email -- Davis-Besse SB Crack RC Investigation RFI. (2 page(s), 12/12/2011)
- ML113560164 - 01/05/2012 Meeting Notice with Davis-Besse to Discuss Present the Results of its Evaluation of Shield Building Cracking and for the NRC to Present the Results of its Independent Assessment of that Evaluation. (4 page(s), 12/22/2011)
- ML12004A010 - Davis-Besse Public Meeting NRC Slides. (24 page(s), 1/4/2012)
- ML120050146 - Davis-Besse Public Meeting FENOC Slides. (41 page(s), 1/5/2012)
- ML12010A172 - Motion for Admission of Contention No. 5 on Shield Building Cracking. (61 page(s), 1/10/2012)
- ML12019A376 - 2012/01/10 Davis-Besse LR - FW: Davis-Besse Shield Building Confirmatory Action Letter (CAL No. 3-11-001) (7 page(s), 1/10/2012)
- ML12019A378 - 2012/01/10 Davis-Besse LR - Davis Besse 5 Open Items (7 page(s), 1/10/2012)
- ML12018A338 - Davis-Besse, Unit 1, Reply to Request for Additional Information for the Review of the License Renewal Application and License Renewal Application Amendment No. 23. (10 page(s), 1/13/2012)
- ML12200A183 - Davis-Besse Nuclear Power Plant, Unit Licensing Basis Seismic Ground Motion Concern. (3 page(s), 6/12/2012)
- ML12200A184 - Email from P. Hernandez, NRR to J. Zimmerman, NRR RE: 2011-10-13, POP - Davis-Besse Containment Shield Building. (1 page(s), 10/14/2011)
- ML12200A185 - Email from J. Zimmerman, NRR to P. Hernandez, NRR Re: FYI - Davis Besse Shield Building Issue Update. (1 page(s), 10/18/2011)
- ML12200A186 - Email from S. CuardadoDeJesus, NRR to R. Auluck, NRR et al. on Davis-Besse Shield Building Issue Summary. (2 page(s), 10/18/2011)
- ML12200A187 - Email from T. Lupold, NRR to A. Rezai, NRR RE: Davis Besse Shield Building Call. (1 page(s), 10/19/2011)
- ML12200A188 - Email from P. Hernandez, NRR to J. Zimmerman, NRR RE: GT. (1 page(s), 10/20/2011)
- ML12200A189 - Email from P. Hernandez, NRR to E. Thomas, NRR on Davis Besse Shield Building Issue. (1 page(s), 10/21/2011)
- ML12200A190 - Email from P. Hernandez, NRR to R. Auluck, NRR et al., on Davis Besse SB Dist Group. (3 page(s), 10/28/2011)
- ML12200A192 - Email from P. Hernandez, NRR to E. Sanchez Santiago, Rill on Questions about Davis Besse Shield Building Report from DORL. (2 page(s), 11/4/2011)
- ML12200A195 - Davis Besse Shield Building Issue NRC Technical Reviewer Focus Questions. (1 page(s), 11/7/2011)
- ML12200A196 - E-mail from P. Hernandez, NRR to R. Auluck, NRR on Davis Besse questions for licensee. (1 page(s), 11/8/2011)
- ML12200A197 - E-mail from J. Zimmerman, NRR to P. Hernandez, NRR Query: Letter from UCS. (1 page(s), 11/9/2011)
- ML12200A198 - E-mail from P. Hernandez, NRR to R. Auluck, NRR et al. Re: Davis Besse Shield Building teleconference. (1 page(s), 11/9/2011)
- ML12200A199 - E-mail from T. Lupold, NRR to A. Rezai, NRR RE: Davis Besse SB extent of condition. (1 page(s), 11/10/2011)
- ML12200A200 - E-mail from J. Zimmerman, NRR to M. Evans, NRR re: DB shield building. (1 page(s), 11/11/2011)
- ML12200A201 - Discussion points relayed to-the licensee after our internal technical discussion. (1 page(s), 11/12/2011)
- ML12200A202 - E-mail from W. Jessup, NRR to M. Murphy, NRR on November 13, 2011 Davis-Besse External Call. (1 page(s), 11/14/2011)
- ML12200A203 - E-mail from P. Hernandez, NRR to J. Zimmerman, NRR on Draft e-mail. (1 page(s), 11/15/2011)
- ML12200A206 - E-mail from P. Hernandez, NRR to M. Evans, NRR et al. RE: Updated Davis-Besse Containment Shield Building POP. (1 page(s), 11/15/2011)
- ML12200A207 - E-mail from P. Hernandez, NRR to M. Evans, NRR et al. on Davis Besse Call Summary. (1 page(s), 11/15/2011)
- ML12200A208 - E-mail from P. Hernandez, NRR to R. Auluck, NRR et al., on Davis Besse conf call. (1 page(s), 11/16/2011)
- ML12200A209 - Email from P. Hernandez, NRR to E. Sanchez Santiago, Rill on Davis Besse Operability question. (1 page(s), 11/17/2011)
- ML12200A210 - Davis-Besse Containment System Primary Steel Containment an Shield Building. (1 page(s), 11/17/2011)
- ML12200A211 - Email from P. Hernandez, NRR to M. Evans, NRR et al., on Davis Besse Operability Question. (2 page(s), 11/17/2011)
- ML12200A212 - Davis-Besse Nuclear Power Station Containment Shield Building Issue. (8 page(s), 11/21/2011)
- ML12200A213 - Email from A. Sheikh, NRR to E. Sanchez Santiago, RilI on Questions for the Conference Call. (1 page(s), 11/22/2011)
- ML12200A214 - Email from A. Howe, NRR to S. West, Rill et al. on Where do we stand on Davis Besse? (1 page(s), 11/23/2011)
- ML12200A215 - Email from A. Howe, NRR to M. Evans, NRR et al., on Call with Steve West on Davis Besse. (1 page(s), 11/23/2011)
- ML12200A218 - Email from J. Zimmerman, NRR to D. Hills, Rill on NSLAOrdersCommPlan. (5 page(s), 11/23/2011)
- ML12200A219 - Email from J. Zimmerman, NRR to M. Evans, NRR Re: Davis-Besse Draft CAL. (2 page(s), 11/27/2011)
- ML12200A221 - Email from B. Lehman, NRR to S. CuadradoDeJesus, NRR RE: Shield Building Discussion with Melanie Next Week. (1 page(s), 11/28/2011)
- ML12200A222 - Email from R. Haskell, NRR on New OpE Forum Possting: Davis Besse - Cracks Discovered in Shield Building During Reactor Vessel Head Replacement. (1 page(s), 12/1/2011)
- ML12200A223 - Email from B. Lehman, NRR to A. Sheikh, NRR et al., on Davis-Besse Shield Building. (1 page(s), 12/1/2011)
- ML12200A224 - Email from D. Morey, NRR to S. CuadradoDeJesus, NRR Re: Davis-Besse Shield Building. (1 page(s), 12/1/2011)
- ML12200A225 - Email from D. Morey, NRR to B. Lehman, NRR et al RE: Davis-Besse Shield Building. (1 page(s), 12/2/2011)
- ML12200A226 - Email from B. Lehman, NRR to S. Sakai, NRR et al. FW: Davis Besse POP. (2 page(s), 12/2/2011)
- ML12200A227 - Email from J. Zimmerman, NRR to M. Evans, NRR et al. Fw: Press Release has been issued. Attachment is publicly available. (3 page(s), 12/3/2011)
- ML12200A228 - Email from V. Mitlyng, Rill to T. Briley, Rill et al. on Davis-Besse coverage. (3 page(s), 12/5/2011)
- ML12200A238 - Email from B. Lehman, NRR to S. Sakai, NRR et al., on Davis-Besse Shield Building Brief- Lehman.pptx. (1 page(s), 12/5/2011)
- ML12200A239 - E-mail from B. Lehman, NRR to S. Sakai, NRR et al., on Davis-Besse Shield Building Brief- Lehman. (1 page(s), 12/6/2011)
- ML12200A240 - Presentation Slides on Davis-Besse Shield Building Crack. (6 page(s), 2/23/2012)
- ML12200A241 - Email from M. Murphy, NRR to W. Jessup, NRR et al., FW: ET Significant Topic: Containment Delamination. (2 page(s), 12/8/2011)
- ML12200A242 - Email from M. Murphy, NRR to C. Roquecruz, NRR RE: G20110823 - Cracks in the Concrete Wall of the Shield Building of the Davis-Besse Power Plant. (1 page(s), 12/13/2011)
- ML12200A243 - Email from M. Galloway, NRR to A. Sheikh, NRR et al., RE: Davis-Besse Shield Building. (1 page(s), 12/13/2011)
- ML12200A244 - Email from A. Sheikh, NRR to B. Lehman, NRR et al RE: Davis-Besse Shield Building RAI. (2 page(s), 12/13/2011)
- ML12200A245 - Email from P. Hernandez, NRR to E. Sanchez Santiago, Rill et al., FW: ET/LT Brief 12-22-11 - Containment Delamination Davis-Besse/ CR-3. (1 page(s), 12/14/2011)
- ML12200A246 - Email from R. Auluck, NRR to S CuadradoDeJesus, NRR et al., on DB Containment Crack RAI Abdul-RA. (2 page(s), 12/14/2011)
- ML12200A247 - Email from P. Hernandez, NRR to A. Erickson, NRR, FW: ET/LT Brief 12-22-11 - Containment Delamination Davis-Besse/ CR-3. (5 page(s), 12/15/2011)
- ML12200A249 - Presentation Slides on Shield Building /Containment Delamination. (11 page(s), 12/22/2011)
- ML12200A250 - Email from D. Morey, NRR to M. Galloway, NRR et al., FW: Summary of Meeting With OGC to Discuss Davis Besse's New Contention on the Shield Building Crack. (2 page(s), 1/12/2012)
- ML12200A251 - Davis-Besse Root Cause Review - Status Call 1/19/2012. (3 page(s), 1/19/2012)
- ML12200A253 - Email from P. Hiland, NRR to M. Murphy, NRR RE: Without the Root Cause. (1 page(s), 1/19/2012)
- ML12200A254 - Davis-Besse Root Cause Review - Status Call 1-26-2012. (3 page(s), 1/26/2012)