Home > NRC Library > ADAMS Public Documents
07/05/2012-Summary of Public Teleconference To Discuss Combined License Application Review Issues Related To Progress Energy Florida's Levy Units 1 and 2 COL Application.
Accession Number: ML12181A145
Date Released: Thursday, August 9, 2012
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML12170A902 - 07/05/2012 Notice of Forthcoming Public Teleconference To Discuss Combined License Application Review Issues Related To Progress Energy Florida's Levy Units 1 and 2 COL Application. (6 page(s), 6/19/2012)
- ML12212A358 - 07/05/2012-Summary of Public Teleconference to Discuss Combined License Application Review Issues Related to Progress Energy Florida's Levy Units 1 and 2 COL Application. (7 page(s), 8/1/2012)
- ML12181A152 - Figure 13AA-201 - Draft Management Organization (1 page(s), 6/29/2012)
- ML12181A318 - Figure 13AA-201 - Levy Nuclear Plant, Units 1 and 2, Part 2, Final Safety Analysis Report-Construction Management Organization. (1 page(s), 6/29/2012)
- ML12181A293 - Figure 13.1-201 - Levy Nuclear Plant, Units 1 and 2, Part 2, Final Safety Analysis Report-Plant Management Organization. (1 page(s), 6/29/2012)
- ML12181A325 - Figure 13.1-201-Draft Plant Management Organization. (1 page(s), 6/29/2012)
- ML12181A301 - Figure 13.1-203 - Levy Nuclear Plant, Units 1 and 2, Part 2, Final Safety Analysis Report-Corporate and Engineering Organization. (1 page(s), 6/29/2012)
- ML12181A231 - Figure 13.1-203 - Draft Corporate and Engineering. (1 page(s), 6/29/2012)
- ML12184A141 - Levy FSAR, Revision 5, Section 2.5.4 Revisions - Grouting. (9 page(s), 6/29/2012)
- ML12185A071 - Levy Nuclear Plant Revised 07/02/12 Draft RAI Response For Seismic Re-Evaluation, Part 1. (44 page(s), 7/3/2012)
- ML12185A083 - Levy Nuclear Plant Revised 07/02/12 Draft RAI Response For Seismic Re-Evaluation, Part 2, Section 1. (10 page(s), 7/3/2012)
- ML12185A087 - Levy Nuclear Plant Revised 07/02/12 Draft RAI Response For Seismic Re-Evaluation, Part 2, Section 2. (34 page(s), 7/2/2012)
- ML12185A109 - Levy Nuclear Plant Revised 07/02/12 Draft RAI Response For Seismic Re-Evaluation, Part 3. (14 page(s), 7/2/2012)
- ML12185A116 - Levy Nuclear Plant 07/02/12 CEUS SSC Evaluation Process - Option A. (1 page(s), 7/3/2012)