Home > NRC Library > ADAMS Public Documents
GE-Hitachi Pre-Filed Exhibits GLE-012, GLE-013, GLE-014, GLE-015, GLE-016 and GLE-017 - GE-Hitachi Global Laser Enrichment's Pre-Filed Testimony on Topic 5 (Need/Alternatives/Environmental Coat-Benefit Analysis.
Accession Number: ML12171A689
Date Released: Tuesday, June 19, 2012
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML12171A691 - GE-Hitachi Pre-Filed Exhibit GLE-012, "GE-Hitachi Global Laser Enrichment's Prefiled Testimony on Topic 5 (Need/Alternatives/Environmental Coat-Benefit Analysis)". (87 page(s), 6/19/2012)
- ML12171A692 - GE-Hitachi Pre-Filed Exhibit GLE-013, "ASLB Presentation Topic #5A Detailed Review of the Need for Future Enrichment Capability". (11 page(s), 6/19/2012)
- ML12171A696 - GE-Hitachi Pre-Filed Exhibit GLE-014, "ERI 2012-1201 A Detailed Review of the Need for Future Enrichment Capability - Response to ASLB Topic 5A". (33 page(s), 6/19/2012)
- ML12171A690 - GE-Hitachi Pre-Filed Exhibit GLE-015, Letter from GLE President to Progress Energy Regarding Demand for Electricity (2009) (10 page(s), 11/13/2002)
- ML12171A695 - GE-Hitachi Pre-Filed Exhibit GLE-016, Letter from GLE President to Progress Energy Regarding Demand for Elcetricity (2009) (2 page(s), 2/20/2009)
- ML12171A693 - GE-Hitachi Pre-Filed Exhibit GLE-017, "Email from Progress Energy to GLE Regarding Power Distribution (2011)". (1 page(s), 9/13/2011)
- ML12171A694 - GE-Hitachi Pre-Filed Exhibit GLE-018, "ASLB Presentation Topic #’s 5B, 5C, 5E, 5F & 5G Alternatives Analysis, Cost-Benefit Analysis, Construction Schedule, Electrical Infrastructure, and Implementation of Mitigation Measures". (18 page(s), 6/19/2012)
- ML12171A697 - GE-Hitachi Pre-Filed Exhibit, "Certificate of Service on Prefiled Testimony on Topic 5 (Need/Alternatives/Environmental Cost-Benefit Analysis) (2 page(s), 6/19/2012)