Home > NRC Library > ADAMS Public Documents
Bell Bend, Response to RAI No. 25 BNP-2012-122, Addressing the Ice Effects as Discussed in Section 2.4.07 of the FSAR.
Accession Number: ML121520477
Date Released: Tuesday, June 5, 2012
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML12152A356 - Bell Bend, Response to RAI No. 25 BNP-2012-122, Addressing the Ice Effects as Discussed in Section 2.4.07 of the FSAR. (5 page(s), 5/21/2012)
- ML12152A358 - Enclosure 2 to BNP-2012-122, RIZZO 2011 Calculation Package 104310.02-F11, "Post-Construction HEC-RAS Analysis of Walker Run-BBNPP Rev 2." Cover through Page 70 of 118. (72 page(s), 10/31/2011)
- ML12152A359 - Enclosure 2 to BNP-2012-122, RIZZO 2011 Calculation Package 104310.02-F11, "Post-Construction HEC-RAS Analysis of Walker Run-BBNPP Rev 2." Page 71 of 118 through End. (48 page(s), 10/31/2011)
- ML12152A360 - Enclosure 3 to BNP-2012-122, RIZZO 2011 Calculation Package 10-4310.02 F-9, "HEC-HMS Site Drainage Analysis Rev 2." (60 page(s), 11/1/2011)