Accession Number: ML120890530
Date Released: Friday, April 6, 2012
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML12089A338 - Proposed Turkey Point, Units 6 and 7 - Submittal of Underground Injection Control Exploratory Well Weekly Construction Summaries - #43, #44, and #45. (2 page(s), 3/27/2012)
- ML12089A340 - Turkey Point, Units 6 and 7 - Exploratory Well Project; Permit #0293962-001 -UC Weekly Construction Summary #43 dated March 2, 2012, Enclosure 1 to L-2012-111. (46 page(s), 3/27/2012)
- ML12089A332 - Turkey Point, Units 6 and 7 - Daily Construction Log, L-2012-111 Enclosure 2 to L-2012-111, Page 15 of 65 through 36 of 65. (22 page(s), 3/7/2012)
- ML12089A333 - Turkey Point, Units 6 and 7 - 24" Casting Cement Top Temperature Log, Enclosure 2 to L-2012-111, Page 37 of 65 through page 65 of 65. (29 page(s), 3/27/2012)
- ML12089A342 - Turkey Point, Units 6 and 7 - Exploratory Well Project; Permit #0293962-001-UC, Weekly Construction Summary #45 dated March 16, 2012, Enclosure 3 to L-2012-111. (38 page(s), 3/27/2012)