Home > NRC Library > ADAMS Public Documents
Callaway Plant, Unit 1 - Request for License Amendment to Adopt NFPA 805, "Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition)" (License Amendment Request LDCN 11-0012).
Accession Number: ML112420020
Date Released: Wednesday, September 7, 2011
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML112420022 - Callaway Plant, Unit 1 - Request for License Amendment to Adopt NFPA 805, "Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition)" (License Amendment Request LDCN 11-0012). (7 page(s), 8/29/2011)
- ML112420024 - Callaway Plant NFPA 805 Transition Report. (168 page(s), 8/29/2011)
- ML112420028 - Callaway Plant NFPA 805 Transition Report, Attachment A - NEI 04-02 Table B-1 and Attachment B - NEI 04-02 Table B-2. (264 page(s), 8/29/2011)
- ML112420033 - Callaway Plant NFPA 805 Transition Report, Attachment F - Fire-Induced Multiple Spurious Operations Resolution. (6 page(s), 8/29/2011)
- ML112420035 - Callaway Plant NFPA 805 Transition Report, Attachment H - NFPA 805 Frequently Asked Question Summary Table, Attachment I - Definition of Power Block & Attachment J - Fire Modeling V & V. (17 page(s), 8/29/2011)
- ML112420036 - Callaway Plant NFPA 805 Transition Report, Attachment L - NFPA 805 Chapter 3 Requirements for Approval (10 CFR 50.48(c)(2)(vi)). (7 page(s), 8/29/2011)
- ML112420038 - Callaway Plant NFPA 805 Transition Report, Attachment M - License Condition Changes. (19 page(s), 8/29/2011)
- ML112420039 - Callaway Plant NFPA 805 Transition Report, Attachment N - Technical Specification Changes. (11 page(s), 8/29/2011)
- ML112420042 - Callaway Plant NFPA 805 Transition Report, Attachments O - Orders and Exemptions, P - RI-PB Alternatives to NFPA 805 10 CFR 50.48(c)(4), Q - No Significant Hazards Evaluations, & R - Environmental Considerations Evaluation. (9 page(s), 8/29/2011)
- ML112420045 - Callaway Plant NFPA 805 Transition Report, Attachment T - Clarification of Prior NRC Approvals. (14 page(s), 8/29/2011)
- ML112420048 - Callaway Plant NFPA 805 Transition Report, Attachment X - Other Requests for Approval. (11 page(s), 8/29/2011)