Home > NRC Library > ADAMS Public Documents
FOIA/PA-2011-0187 - Resp 1 - Partial.
Accession Number: ML111290718
Date Released: Friday, May 13, 2011
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML11129A254 - FOIA/PA-2011-0187 - Resp 1 - Partial. (2 page(s), 5/5/2011)
- ML11129A278 - Clinton Power Station NRC Security Baseline Inspection Report No. 05000461/2006-003(DRS). (18 page(s), 11/30/2006)
- ML11129A279 - Clinton Power Station NRC Material Control and Accounting TI 2515/154 Phase III Inspection Report 05000461/2007-402. (16 page(s), 4/10/2007)
- ML11129A280 - Clinton Power Station NRC Security Baseline Inspection Report 05000461/2007-403(DRS). (19 page(s), 12/7/2007)
- ML11129A276 - Clinton Power Station NRC Security Baseline Inspection Report 05000461/2008-402(DRS). (21 page(s), 5/20/2008)
- ML11129A277 - Clinton Power Station TI 2515/171 Verification of Site Specific Implementation of B.5.b Phase 2. and 3 Mitigating Strategies Inspection Report No. 05000461/2008-007(DRS). (27 page(s), 6/18/2008)
- ML11129A284 - Clinton Power Station NRC Supplemental Inspection Report 05000461/2009404(DRS). (17 page(s), 4/10/2009)
- ML11129A289 - Clinton Power Station NRC Security Baseline Inspection Report 05000461/2009-402(DRS). (16 page(s), 5/14/2009)
- ML11129A285 - Clinton Power Station NRC Security Baseline Inspection Report 05000461/2010-402(DRS). (14 page(s), 3/11/2010)
- ML11129A286 - Clinton Power Station NRC Security Baseline Inspection Report 05000461/2010-403(DRS). (19 page(s), 5/26/2010)
- ML11129A287 - Clinton Power Station NRC Material Control and Accounting Program Inspection Report No. 05000461/2010-405. (5 page(s), 10/25/2010)
- ML11129A288 - Clinton Power Station Fire Protection Triennial Baseline Inspection NRC Inspection Report 05000461/2011-009. (24 page(s), 4/25/2011)