Home > NRC Library > ADAMS Public Documents
Prairie Island, Units 1 & 2, Supplemental Information Regarding NRC Inspection Report 05000282/2010010, 05000306/2010010 (EA-10-070).
Accession Number: ML101690166
Date Released: Monday, June 28, 2010
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML101690167 - Prairie Island, Units 1 & 2, Supplemental Information Regarding NRC Inspection Report 05000282/2010010, 05000306/2010010 (EA-10-070). (7 page(s), 6/14/2010)
- ML101690168 - Enclosure 3, Prairie Island Nuclear Generating Plant, Units 1 and 2, Supporting Engineering Evaluations, EC 16090, "Turbine Building Flooding SDP: CL Turbine Building Pipe Break Analysis." (35 page(s), 6/11/2010)
- ML101690169 - Enclosure 4, Prairie Island Nuclear Generating Plant, Units 1 and 2, Supporting Engineering Evaluations, EC 16154, "Turbine Building Flooding SDP: CL Turbine Building Seismic Pipe Break Analysis." (19 page(s), 6/10/2010)
- ML101690170 - Enclosure 5, Prairie Island Nuclear Generating Plant, Units 1 and 2, Supporting Engineering Evaluations, EC 16270, "Screening of Pipe Whip Interactions for SDP." (52 page(s), 6/11/2010)
- ML101690171 - Enclosure 6, Prairie Island Nuclear Generating Plant, Units 1 and 2, Supporting Engineering Evaluations, EC 16275, "Effects of Pipe Whip Interactions for Various Pipe Combinations for Internal Flooding SDP." (45 page(s), 6/11/2010)