Home > NRC Library > ADAMS Public Documents
4/28/2010 Category 2 Meeting Summary on NRC Construction Reactor Oversight Process (cROP) Working Group with the Industry and the General Public
Accession Number: ML101270242
Date Released: Monday, May 17, 2010
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML101270235 - 4/28/2010 Summary of Category 2 Meeting on NRC Construction Reactor Oversight Process (cROP) Working Group with the Industry and the General Public. (10 page(s), 5/10/2010)
- ML100960565 - 04/28/2010 Notice of Meeting With Construction Reactor Oversight Process (cROP) Working Group to Discuss cROP Significance Determination Process (SDP), Enforcement and Action Matrix Approach, and Performance Indicators (PI). (10 page(s), 4/8/2010)
- ML101180542 - 04/28/2010-cROP Category 2 Public Meeting Draft SDP Flowchart. (1 page(s), 4/28/2010)
- ML101180543 - 04/28/2010-CROP Category 2 Public Meeting Operational Programs SDP Flowchart. (1 page(s), 4/28/2010)
- ML101050249 - 4/28/2010 - cROP Category 2 Public Meeting Consensus Framework. (15 page(s), 4/18/2010)
- ML101180547 - 04/28/2010-CROP Category 2 Public Meeting Operator Training SDP Flowchart. (4 page(s), 4/28/2010)
- ML101050247 - 4/28/2010 - cROP Category 2 Public Meeting Cornerstone Objectives,, Attributes and Areas to Measure. (3 page(s), 4/28/2010)