Home > NRC Library > ADAMS Public Documents
Forwards proposed schedule for completion of regulatory requirements & commitments,in response to NRC 811005 request.Four oversize schedule sheets encl.Aperture cards are available in PDR.
Accession Number: ML101260501
Date Released: Thursday, September 1, 2011
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML093430814 - Forwards proposed schedule for completion of regulatory requirements & commitments,in response to NRC 811005 request.Four oversize schedule sheets encl.Aperture cards are available in PDR. (3 page(s), 12/31/1981)
- ML101260414 - Drawing, "Indian Point 3 Nuclear Power Plant, Proposed Schedule for Completion of Regulatory Commitments/Requirements." Sheet 1 of 5. (1 page(s), 12/17/1981)
- ML101260415 - Drawing, "Indian Point 3 Nuclear Power Plant, Proposed Schedule for Completion of Regulatory Commitments/Requirements." Sheet 2 of 5. (1 page(s), 12/17/1981)
- ML101260412 - Drawing, "Indian Point 3 Nuclear Power Plant, Proposed Schedule for Completion of Regulatory Commitments/Requirements." Sheet 3 of 5. (1 page(s), 7/17/1981)
- ML101260416 - Drawing, "Indian Point 3 Nuclear Power Plant, Proposed Schedule for Completion of Regulatory Commitments/Requirements." Sheet 4 of 5. (1 page(s), 12/17/1981)