Home > Site Help > Search Results

Forwards "Cycle 10 Startup Physics Test Rept," per TS section 6.9.1.1.During cycle 9/10 refueling outage,util started transition from 15 x 15 Vantage 5 fuel design to 15 x 15 Vantage + fuel design.

Accession Number: ML100360884

Date Released: Tuesday, June 1, 2010

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer