Home > NRC Library > ADAMS Public Documents
9/17/2009 Meeting Summary of Catergory 3 Meeting for Discussions on Construction Inspectionand Assessment.
Accession Number: ML092710475
Date Released: Tuesday, October 13, 2009
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML092710396 - 09/17/2009 Meeting Summary of Category 3 Meeting for Discussions on Construction Inspection and Assessment. (11 page(s), 10/5/2009)
- ML092321032 - 09/17/2009 Meeting Notice, Category 3 Meeting for Discussions on the Construction Assessment Program, Transition to Operations, IMC 0613, Safety Culture, Status of CIPIMS, Status of NEI-08-02, and Update on ITAAC Developments. (9 page(s), 8/28/2009)
- ML092050573 - 07/23/2009 Meeting Slides, "Proposed Construction Inspection Assessment Process", Category 3 Public Meeting NEI Presentation on the Proposed Construction Inspection Assessment Program. (13 page(s), 7/23/2009)
- ML092580240 - (Draft) Inspection Manual Chapter 0613. (70 page(s), 9/15/2009)
- ML092300402 - 09/02/2009 - Generic Design-Centered Working Group Meeting Slide on Proposed Definition of As-Built. (1 page(s), 8/18/2009)
- ML092540203 - 09/17/2009 Meeting Presentation on Construction Inspection Program Information Management System (CIPMS). (13 page(s), 9/14/2009)
- ML092570246 - 09/17/2009 Meeting Presentation on Transition from the Constructiuon Inspection Program to the Reactor Oversight Program. (5 page(s), 9/17/2009)
- ML092540566 - 09/17/2009 Meeting Presentation on Safety Culture during New Reactors Construction (Topics Continued). (8 page(s), 9/17/2009)
- ML092610429 - 09/17/09 Meeting Slide, "As-Built." (10 page(s), 9/17/2009)
- ML092530282 - 09/17/2009 Meeting Presentation on Construction Assessment Program Activities. (5 page(s), 9/17/2009)
- ML092530298 - 09/17/2009 Meeting Presentation on Inspection Manual Chapter 0613 "Documenting 10 CFR Part 52 Construction Inspections." (15 page(s), 9/17/2009)
- ML092580027 - Revision of Safety Culture Components and Aspects from the ROP (Modified for Construction)- Redline Strike Out- September 17, 2009. (6 page(s), 9/15/2009)
- ML092800184 - Predecisional Enforcement and Nonconformance. (6 page(s), 10/5/2009)