Home > NRC Library > ADAMS Public Documents
Calvert Cliffs Nuclear Power Plant, Independent Spent Fuel Storage Installation - License Amendment Request: Allow Increased Burnup fuel to be loaded into NUHOMS-32P Dry Shielded Canister.
Accession Number: ML091680556
Date Released: Monday, June 29, 2009
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML091680541 - Calvert Cliffs Nuclear Power Plant, Independent Spent Fuel Storage Installation - License Amendment Request: Allow Increased Burnup fuel to be loaded into NUHOMS-32P Dry Shielded Canister. (20 page(s), 6/15/2009)
- ML091680542 - CCNPP Calculation CA06721, Revision 0, "Source Terms for ISFSI 32P Burnup Extension". (133 page(s), 3/13/2007)
- ML091680544 - CCNPP Calculation CA06750, Revision 0, "Loading and Transfer Dose Rates for ISFSI 32P Burnup Extension". (16 page(s), 8/12/2008)
- ML091680545 - CCNPP Calculation CA06751, Revision 0., "Horizontal Storage Module Dose Rates for ISFSI 32P Burnup Extension". (26 page(s), 9/23/2008)
- ML091680547 - Calculation NUH32P+.0201, Revision 1, "NUHOMS 32P CE 14x14 Fuel Cladding Strength Under Accident Side Drop Conditions". (12 page(s), 12/8/2008)
- ML091680548 - Calculation NUH32P+.0202, Revision 1, "End Drop Structural Evaluation of CE 14X14 PWR Fuel Assembly in A 32P+DSC". (32 page(s), 12/8/2008)
- ML091680551 - Calculation NUH32P+.0401, Revision 1, "Thermal Analysis of NUHOMS 32P+DSC for Vacuum Drying Condition". (20 page(s), 8/25/2008)