Home > NRC Library > ADAMS Public Documents
01/28-29/2009 Meeting Summary, 2009 Category 2 Meeting with the TSTF to Discuss Appropriate Interpretation of Technical Specifications, Enclosure 1.
Accession Number: ML090690151
Date Released: Friday, March 20, 2009
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML090640958 - 01/28/09 - 01/29/09 Summary of Category 2 Meeting with TSTF to Discuss Appropriate Interpretation of Technical Specifications. (10 page(s), 3/9/2009)
- ML090630671 - Enclosure 2: Attendee List - Meeting Summary of the January 27 & 28 Meeting with NRC/TSTF. (2 page(s), 1/28/2008)
- ML090630669 - Enclosure 3: TSTF Address List - Meeting Summary of the January 27 & 28 Meeting with NRC/TSTF. (1 page(s), 3/9/2009)
- ML090640438 - Enclosure 4: TSTF Presentation Handout - Meeting Summary of the January 27 & 28 Meeting with NRC/TSTF. (24 page(s), 2/4/2009)
- ML090640439 - Enclosure 5: Case Study 1: Structure of TS for Ultrasonic Flow Meters - Meeting Summary of the January 27 & 28 Meeting with NRC/TSTF. (17 page(s), 1/28/2009)
- ML090640440 - Enclosure 6: Case Study 2: Catawba Emergency TS Change - Meeting Summary of the January 27 & 28 Meeting with NRC/TSTF. (27 page(s), 1/28/2009)
- ML090640441 - Enclosure 7: Case Study 3: Rejection of TSTF-495, "Bases Change to Address GE Part 21 SC05-03" - Meeting Summary of the January 27 & 28 Meeting with NRC/TSTF. (7 page(s), 12/1/2005)
- ML090640442 - Enclosure 8: Case Study 4: Do we need to clarify what is meant by "operational convenience"- Meeting Summary of the January 27 & 28 Meeting with NRC/TSTF. (5 page(s), 1/27/2009)
- ML090640443 - Enclosure 9: Case Study 5: Palisades use of LCO 3.0.4- Meeting Summary of the January 27 & 28 Meeting with NRC/TSTF. (9 page(s), 12/1/2005)
- ML090640444 - Enclosure 10: Case Study 6: Arkansas Nuclear One Use of LCO 3.0.5 - Meeting Summary of the January 27 & 28 Meeting with NRC/TSTF. (9 page(s), 1/28/2009)
- ML090640445 - Enclosure 11 - Case Study 7: Turkey Point NCV on TS 3/4.4.10, "Structural Integrity" (Applicability of SR's 'and Actions) - Meeting Summary of the January 27 & 28 Meeting with NRC/TSTF. (9 page(s), 10/6/2008)
- ML090640446 - Enclosure 12: Case Study 8: Applicability of SR 3.0.3 to SR's that Have Never Been Performed - Meeting Summary of the January 27 & 28 Meeting with NRC/TSTF. (5 page(s), 1/28/2009)
- ML090640447 - Enclosure 13: Case Study 9: River Bend Shutdown as an Alternative to Other Actions - Meeting Summary of the January 27 & 28 Meeting with NRC/TSTF. (45 page(s), 3/9/2009)
- ML090630672 - Enclosure 14: Case Study 10: Perry Inability to Follow the RHR-SDC Required - Meeting Summary of the January 27 & 28 Meeting with NRC/TSTF. (18 page(s), 3/9/2009)