Home > NRC Library > ADAMS Public Documents
Forwards "Program Plan for Control Room Design Reviews for all TVA Nuclear Plants," in response to Generic Ltr 82-33 re upgrade of emergency plans.
Accession Number: ML082840453
Date Released: Friday, October 31, 2008
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML082840452 - Forwards "Program Plan for Control Room Design Reviews for all TVA Nuclear Plants," in response to Generic Ltr 82-33 re upgrade of emergency plans. (3 page(s), 6/9/1983)
- ML082910432 - Procedure B62209.10, "Program Plan for Control Room Design Reviews for all TVA Nuclear Plants." (69 page(s), 6/9/1983)
- ML082970089 - Procedure B62209.10, "Program Plan for Control Room Design Reviews for all TVA Nuclear Plants." Continuation of Work Station Design. (80 page(s), 6/9/1983)
- ML082970090 - Procedure B62209.10, "Program Plan for Control Room Design Reviews for all TVA Nuclear Plants." Continuation of Work Station Design. (80 page(s), 6/9/1983)
- ML082970091 - Procedure B62209.10, "Program Plan for Control Room Design Reviews for all TVA Nuclear Plants." Continuation of Work Station Design. (80 page(s), 6/9/1983)
- ML082970092 - Procedure B62209.10, "Program Plan for Control Room Design Reviews for all TVA Nuclear Plants." Continuation of Work Station Design. (37 page(s), 6/9/1983)