Informs that Seismic Qualification Review Team schedules re OL applications will be delayed due to Naval Research Lab cancellation of interagency agreement.
Accession Number: ML082170562
Date Released: Thursday, October 24, 2024
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML082170561 - Further response to FOIA requests dtd 840223 & 0730. Forwards App B documents.Documents available in PDR. (8 page(s), 10/9/1984)
- ML082480381 - Discusses RJ Bosnak 800211 memo re Mechanical Engineering Branch equipment qualification effort & potential for licensing delays.Private firm contract proposal being prepared. (1 page(s), 2/15/1980)
- ML082480384 - Forwards Equipment Qualification Branch request for addl info re review of seismic & dynamic qualification of equipment for OL applications.Submits tentative review schedule,based upon receipt of applicants' responses. (10 page(s), 3/16/1981)
- ML083380725 - Informs that Seismic Qualification Review Team schedules re OL applications will be delayed due to Naval Research Lab cancellation of interagency agreement. (2 page(s), 2/11/1980)
- ML20114E908 - Submits review of intervenors contentions re Waterford discovery.Recommends meeting to determine what documents are required to clarify contention. (40 page(s), 7/20/1979)
- ML20114F055 - Requests investigation of & corrective action re improper action by authorized nuclear inspector. (1 page(s), 11/5/1979)
- ML20114F119 - Informs that Mechanical Engineering Branch review has been contracted out to ORNL,however ORNL will not perform review of seismic qualification of equipment.Forwards question which will allow applicant to submit required info. (2 page(s), 2/26/1980)
- ML20114F267 - Discusses inadequacy of Louisiana Power & Light Class 3 insp program.Program not sufficiently described to assure equivalence to authorized insp agency activities & specific duties of ANI. (3 page(s), 6/19/1980)
- ML20114F517 - Informs that control room will not be sufficiently complete for NRC review/audit until Spring 1982.Requests SER input evaluating applicant preliminary assessment. (1 page(s), 2/27/1981)
- ML20114F530 - Notification of 810414-16 meeting w/util & Ebasco to discuss outstanding issues & conduct drawing review.Agenda encl. (3 page(s), 3/18/1981)
- ML20114F546 - Discusses upcoming 810414-16 meeting w/C-E,Ebasco & util to discuss question responses & review drawings.Physical separation review will be restricted at meeting to one sample sys,w/potential further review during site visit. (1 page(s), 4/9/1981)
- ML20114F567 - Advises that initial review of PDES shows need for extensive review & revision. (1 page(s), 4/6/1981)
- ML20114F571 - Responds to 810318 request for review of FSAR Q-list. Seismically qualified sump pumps,safety-related transformers & motor control ctrs should be listed in Table 3.2-1. (2 page(s), 4/23/1981)
- ML20114F582 - Responds to 810422 memo expressing concern re seismic qualification review team site visit schedule.Visit is contingent upon receipt of info requested in Equipment Qualification Branch 810316 ltr. (4 page(s), 5/1/1981)
- ML20114F586 - Requests confirmation of seismic qualification review team 810706 site visit. (1 page(s), 4/22/1981)
- ML20114F593 - Summary of 810414-15 meeting w/Louisiana Power & Light, Ebasco,C-E & ICSB re drawing review of facility & responses to Question 2. (11 page(s), 4/28/1981)
- ML20114F596 - Forwards SER,FSAR Section 7,instrumentation & control sys. SER written by consultants of ANL,edited & subjoined by Instrumentation & Control Sys Branch.Lists open items identified in SER. (43 page(s), 5/8/1981)
- ML20114F599 - Forwards input to SER open items re seismic & dynamic qualification of Seismic Category I mechanical & electrical equipment & II.E.4.2 concerning operability of purge sys isolation valves. (6 page(s), 5/12/1981)
- ML20114F602 - Forwards marked-up Revision 1 to FSAR Section 7 re instrumentation & control sys safety evaluation. (57 page(s), 5/27/1981)
- ML20114F624 - Forwards list of incomplete items in Instrumentation & Control Sys Branch review to be discussed during 810818-19 open items resolution meeting in Bethesda,MD. (3 page(s), 8/10/1981)
- ML20114F629 - Forwards agenda for ACRS Waterford-3 Subcommittee 810805 meeting.Substantive staff support at subcommittee & 810806 full committee meetings are necessary to get favorable ltr & avoid delays in project schedule.W/o encl. (1 page(s), 7/22/1981)
- ML20114F642 - Forwards Instrumentation & Control Sys Branch supplemental safety evaluation.Open items include compliance w/IE Bulletin 79-27,monitoring safe shutdown,reactor coolant pump shaft break protection & TMI Action Item II.F.2. (11 page(s), 8/12/1981)
- ML20114F663 - Forwards request for addl info re operational QA program of FSAR for transmittal to util.Request reflects requirements of NUREG-0737, "Clarification of TMI Action Plan Requirements." (6 page(s), 9/2/1981)
- ML20114F692 - Forwards list of open & confirmatory issues which should be included in SER Suppl 2.Schedule for input,review & issuance outlined. (3 page(s), 11/6/1981)
- ML20114F695 - Summary of 810929 meeting w/util in Bethesda,MD re util plans & schedule for resolving mgt & staffing problems. (1 page(s), 11/3/1981)
- ML20114F697 - Notification of 811208-10 meetings w/util in New Orleans,LA to perform audit of util mgt qualifications. (1 page(s), 11/30/1981)
- ML20114F725 - Discusses status of SSER input.Section re safe shutdown analysis will be provided by 820301,per 820216 telcon. (1 page(s), 2/16/1982)
- ML20114F735 - Forwards Instrumentation & Control Sys Branch position on remote shutdown capability for guidance of applicant. (3 page(s), 2/23/1982)
- ML20114F743 - Forwards Instrumentation & Control Sys Branch safety evaluation re safe shutdown from outside control room. (7 page(s), 3/2/1982)
- ML20114F834 - Forwards list of status of all open & confirmatory items listed in SER.Issuance date for SER,Suppl 4 is 820730. (11 page(s), 7/14/1982)
- ML20114F847 - Forwards CJ Anderson & CY Liang affidavits re Unresolved Safety Issues A-45 & A-46,respectively. (14 page(s), 8/27/1982)
- ML20114F850 - Forwards TY Chang affidavit re Unresolved Generic Safety Issue A-46 on seismic qualifications of equipment.Affidavit responds to ASLB order. (6 page(s), 8/26/1982)
- ML20114F859 - Forwards outline of open items based on review of util 820625 info submitted in response to Equipment Qualification Branch 820118 questions re purge & vent valve operability. Items discussed w/Ebasco on 820727. (3 page(s), 9/9/1982)
- ML20114F890 - Forwards Equipment Qualification Branch input for SSER. Input covers seismic & dynamic qualification of safety-related equipment. (5 page(s), 11/30/1982)
- ML20114F892 - Forwards list of items requiring verification for SER & suppls.Based on current fuel load schedule,response required by 830301. (4 page(s), 11/29/1982)
- ML20114F913 - Advises of high probability that May 1983 fuel load date may slip unless immediate,positive mgt emphasis placed on project.Slippage probable due to delays in submittal of analyses needed to close out open & confirmatory items. (4 page(s), 1/28/1983)
- ML20114F917 - Forwards Instrumentation & Control Sys Branch SSER input re outstanding issues on diversity of actuation signals & reactor coolant pump shaft break. (4 page(s), 2/10/1983)
- ML20114F932 - Forwards 830316 order imposing civil monetary penalty for publication in FR.W/o encl. (1 page(s), 3/22/1983)
- ML20114F935 - Requests that encl comments & questions on util 830127 submittal proposing design changes to liquid & solid radwaste sys be transmitted to applicant.Info required before SER can be issued. (5 page(s), 3/28/1983)
- ML20114F981 - Forwards Suppl 5 to SER re thermal hydraulic design & SER input for util response to NUREG-0737,Item II.F.2, "Inadequate Core Cooling Instrumentation." Correction to LPD penalty factor required prior to OL issuance. (23 page(s), 5/18/1983)
- ML20114G014 - Trip rept of 830627-0701 training program audit at site.One violation & two deviations will be cited against util. Observations of inspector training audit performance will be integrated into training guidelines & criteria. (1 page(s), 7/8/1983)
- ML20114G026 - Provides status of Instrumentation & Control Sys Branch review of facility open item re emergency feedwater control sys.Addl info requested at 830218 meeting,expected by 830225,not received until May 1983. (1 page(s), 7/25/1983)
- ML20114G070 - Forwards memo to assist in providing response to Region IV concerns re util slippage in simulator installation schedule.W/o encl. (1 page(s), 9/1/1983)
- ML20114G079 - Rev 2 to "Waterford III SQRT Visit Rept (Initial Visit)." (56 page(s), 4/30/1983)
- ML20114G083 - "Waterford III SQRT Visit Rept (Second Visit)." (40 page(s), 8/31/1983)
- ML20114G085 - Recommends regions perform const QA evaluations prior to issuance of OL.Evaluations should be performed when const 6 months from completion. (7 page(s), 9/26/1983)
- ML20114G089 - Forwards Region V const QA evaluation.Evaluations should be requested for all future OLs & reviewed prior to Commission meetings. (1 page(s), 7/6/1983)
- ML20114G092 - Forwards evaluation of significant cost deficiencies & effectiveness of const phase of QA program.Applicant program effective. (3 page(s), 6/28/1983)
- ML20114G094 - Forwards "Summary Rept for Regional Evaluation of Louisiana Power & Light Co,Waterford 3." Updated rept forthcoming approx 3 months prior to OL & final detailed open item list 1 month prior to OL. (1 page(s), 5/31/1983)
- ML20114G098 - "Summary Rept for Regional Evaluation of Louisiana Power & Light Co,Waterford 3." (32 page(s), 4/1/1983)
- ML20115A032 - Describes various design concerns resulting from emergency feedwater sys instrumentation & control review & forwards request for addl info.Sys design concept acceptable.Meeting to be held in near future to resolve concerns. (5 page(s), 11/3/1983)
- ML20115A059 - Forwards updated proposed safeguards license condition & SER input resulting from review of rev to security plan.Encl withheld from public disclosure. (1 page(s), 12/30/1983)
- ML20115A081 - Requests that issues raised in 830913 memo re cracked welds & loose parts in C-E steam generators be considered in insp of facility. (1 page(s), 1/13/1984)
- ML20115A094 - Trip rept of 830124-25 site visit re control room habitability.HVAC sys generic general concerns & overall perspective addressed. (4 page(s), 2/9/1984)
- ML20115A109 - Discusses change to Task Order 001,requesting that Sperko participate in second 2 wks of const assessment team insp. Change constitutes increase of 2 wks over original task order. (1 page(s), 3/14/1984)
- ML20115A116 - Forwards SSER 6 input,including Section 4.2.2 re design evaluation & seismic & LOCA loading.Seismic & LOCA loading issue resolved & license condition removed. (10 page(s), 3/14/1984)
- ML20115A121 - Discusses 840323 exit interview w/util & const appraisal team re summary findings of electrical,instrumentation, mechanical & civil/structural areas,welding & NDE efforts. Items preliminary.Final rept will provide details. (2 page(s), 3/29/1984)
- ML20115A133 - Forwards proposed schedule for reaching outstanding licensing decisions at facility by Apr.Resolution of allegations re completion of insp,FSAR SSER,response to hearing motions & decision on basemat cracks included. (2 page(s), 3/28/1984)