Home > NRC Library > ADAMS Public Documents
Watts Bar Nuclear Plant, Unit 1 - Issuance of Amendment Regarding Reactor Trip System and Engineered Safety Features Actuation System Completion Times, Bypass Test Times, and Surveillance Test Intervals (TAC MD5880).
Accession Number: ML081620033
Date Released: Tuesday, July 8, 2008
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML081620043 - Watts Bar Nuclear Plant, Unit 1 - Issuance of Amendment Regarding Reactor Trip System and Engineered Safety Features Actuation System Completion Times, Bypass Test Times, and Surveillance Test Intervals (TAC MD5880). (30 page(s), 6/30/2008)
- ML081620049 - Watts Bar Nuclear Plant, Unit 1, Technical Specifications, Issuance of Amendment Regarding Reactor Trip System and Engineered Safety Features Actuation System Completion Times, Bypass Test Times, and Surveillance Test Intervals (TAC MD5880). (20 page(s), 6/30/2008)