Home > NRC Library > ADAMS Public Documents
Reactor Oversight Process Working Group Monthly Public Meeting Summary.
Accession Number: ML081200480
Date Released: Wednesday, May 14, 2008
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML081190536 - 04/16/08 - 04/17/08 Summary of Reactor Oversight Working Group Public Meeting to Discuss Safety Culture Lessons Learned & Status of NRC Cross-Cutting Issue Task Force Effort, Potential Non-Safety Culture Related Changes to Inspection Manual Chapter 0305, (13 page(s), 5/6/2008)
- ML081200512 - Enclosure 5 - NRC Response to Proposed Changes to NEI 99-02 to Address "Time of Discovery." (2 page(s), 5/6/2008)
- ML081200531 - Enclosure 6 - Proposed Change to NEI 99-02 to Address Failure Identified During PMT. (1 page(s), 5/6/2008)
- ML081200567 - Enclosure 7 - NRC Response to Proposed Change to NEI 99-02 for PMT. (1 page(s), 5/6/2008)
- ML081200541 - Enclosure 8 - NEI Whitepaper Proposing Changes to NEI 99-02 for the ERO PI. (3 page(s), 5/6/2008)
- ML081200593 - Enclosure 9 - Proposed Guidance to MC0305 to address Protracted PI Results - NEI, Draft. (5 page(s), 4/10/2008)
- ML081200546 - Enclosure 10 - Corrected FAQ Log from March 2008. (42 page(s), 6/22/2007)
- ML081200551 - Enclosure 11 - FAQ Log April 2008. (34 page(s), 9/4/2007)
- ML081200555 - Enclosure 12 - NRC Proposed Responses to Various FAQs. (2 page(s), 5/6/2008)
- ML081200440 - Enclosure 13 - NEI ROP Working Group Action List April 2008. (3 page(s), 5/6/2008)
- ML081120420 - Slides for April 17, 2008 Meeting to Discuss Draft Enhancements to Reactor Oversight Process Guidance Documents. (53 page(s), 4/17/2008)
- ML081020491 - Draft IP 95003, Supplemental Inspection for Repetitive Degraded Cornerstones, Multiple Degraded Cornerstones, Multiple Yellow Inputs, or One Red Input - for 4/17/08 Public Meeting. (72 page(s), 4/11/2008)
- ML081020608 - Draft Enclosure 95003.02-A, Sample Inspection Requirements for Safety Culture Components - for 4/17/08 Public Meeting. (18 page(s), 4/11/2008)
- ML081020675 - Draft Enclosure 95003.02-B, Sample Questions for Safety Culture Components - for 4/17/08 Public Meeting. (16 page(s), 4/11/2008)
- ML081020682 - Draft Enclosure 95003.02-C, Guidance for Focus Groups and Individual Interviews - for 4/17/08 Public Meeting. (7 page(s), 4/11/2008)
- ML081020688 - Draft Enclosure 95003.02-D, Guidance for Structured Behavioral Observations - for 4/17/08 Public Meeting. (13 page(s), 4/11/2008)
- ML081020715 - Draft Enclosure 95003.02-E, Guidance for Safety Culture Event Follow-Up Studies - for 4/17/08 Public Meeting. (2 page(s), 4/11/2008)
- ML081020821 - Draft Enclosure 95003.02-F, Guidance for Evaluating Safety Culture Surveys - for 4/17/08 Public Meeting. (4 page(s), 4/11/2008)
- ML081010224 - Draft Inspection Manual Chapter 0305, "Operating Reactor Assessment Program" for Use at 4/17/08 Public Meeting. (55 page(s), 4/10/2008)
- ML081010229 - Lesson Learned Inputs for the Reactor Oversight Program Safety Culture Evaluation for use at 4/17/08 Public Meeting. (7 page(s), 4/10/2008)
- ML081200605 - Enclosure 24 - ROP Action Matrix Placement - Provided by NEI (1 page(s), 5/6/2008)