Web package for FOIA/PA-2008-0016
Accession Number: ML080440463
Date Released: Friday, February 15, 2008
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML072890135 - FOIA/PA-2008-0016 - Farley Nuclear Power Plant electrical breaker problems associated with component cooling water pumps in 2007, improperly operating valve during surveillance testing April 2006 & January 2007, records, reports & e-mails (1 page(s), 10/9/2007)
- ML073241189 - FOIA/PA-2008-0016 - Resp 1 - Partial. (5 page(s), 11/16/2007)
- ML061570034 - LER 06-002-00 for Joseph M. Farley, Unit 1, regarding Main Steam Isolation Valve Failure to Close. (4 page(s), 6/5/2006)
- ML072200446 - IR 05000348-07-009 and 05000364-07-009, on April 30-July 3, 2007, for Joseph M. Farley Nuclear Plant, Preliminary Yellow Finding. (27 page(s), 8/2/2007)
- ML072320116 - IR 05000348-07-008, 05000364-07-008, on 02/12/2007-05/03/2007; Joseph M. Farley Nuclear Plant, Units 1 & 2; Supplemental Inspection IP 95001 for a White Cooling Water Performance Indicator. (19 page(s), 8/17/2007)
- ML072390309 - 09/12/2007, Notice of Public Meeting Southern Nuclear Operating Co. Inc., to Discuss Preliminary Yellow Finding for Farley. (5 page(s), 8/27/2007)
- ML072410424 - Press Release-II-07-040 - NRC to Meet with Southern Nuclear about Inspection Finding at Farley Nuclear Power Plant. (1 page(s), 8/29/2007)
- ML072430412 - Farley 2007 Mid Cycle Letter - Performance Review and Inspection Plan. (5 page(s), 8/31/2007)
- ML072530970 - PNO-II-07-009 - Joseph M. Farley, Unit 1 and 2, Component Cooling Water Pump Breaker Failures. (1 page(s), 9/10/2007)
- ML072600107 - Press Release-II-07-045 - NRC Sets Public Meeting with Farley on Sept. 20 in Dothan to discuss Inspection of Cooling Water System Breaker Failures. (1 page(s), 9/17/2007)
- ML072600112 - 09/20/2007 Notice of Public Meeting with Southern Nuclear Operating Company, Inc., to Discuss the Results of an Augmented Inspection Team Inspection of Component Cooling Water System Breaker Failures at Joseph M. Farley. (5 page(s), 9/17/2007)
- ML072620428 - Press Release-II-07-046 - Telephone Bridge Line Established for Public Meeting Between NRC and Farley Nuclear Power Plant. (1 page(s), 9/19/2007)
- ML072710594 - PNO-II-07-009A - Update to Component Cooling Water Pump Breaker Failures. (1 page(s), 9/28/2007)
- ML073030191 - Joseph M. Farley, Units 1 and 2, Operability Evaluation of AREVA Cutler-Hammer Breakers. (16 page(s), 10/29/2007)
- ML073241209 - Email from M. Ashley, NRR to M. Franovich, NRR, T. Reis, NRR and S. Richards, NRR on SERP - Preliminary Yellow - Farley - Wed June 20, 1pm. (1 page(s), 6/14/2007)
- ML073241225 - Email from K. Cotton, NRR to J. Lubinski, NRR on Farley Update. (3 page(s), 8/29/2007)
- ML073241242 - Email from M. Ashley, NRR to F. Brown, NRR, J. Circle, NRR, M. Franovich, NRR and R. Martin, NRR on Reg Conference with Farley on Yellow Issues on Loss of RHR Train. (1 page(s), 9/7/2007)
- ML073241257 - Email from K. Cotton, NRR to T. McGinty, NRR on Farley. (1 page(s), 9/10/2007)
- ML073241270 - Email from K. Cotton, NRR to S. Shaeffer, RII on Farley. (1 page(s), 9/10/2007)
- ML073241283 - Email from K. Cotton, NRR to C. Haney, NRR on Action: Briefing at the Hill re: Farley Inspection. (1 page(s), 9/14/2007)
- ML073241299 - Email from T. McGinty, NRR to K. Cotton, NRR on Action: Briefing at the Hill re: Farley Inspection. (1 page(s), 9/18/2007)
- ML073241309 - Email from D. Decker, NRR to K. Cotton, NRR et al. Re: Farley AITNRC Slides.ppt. (1 page(s), 9/18/2007)
- ML073241325 - Email from K. Cotton, NRR to S. Shaeffer, RII on Final Farley AITNRC Slides.ppt. (8 page(s), 9/18/2007)
- ML073241333 - Email from D. Decker, NRR to K. Cotton, NRR et al. Action: Briefing at the Hill re: Farley Inspection. (2 page(s), 9/18/2007)
- ML073241335 - Email from T. McGinty, NRR to S. Alexander, NRR and K. Cotton, NRR on Action: Briefing at the Hill re: Farley Inspection. (2 page(s), 9/18/2007)
- ML073241338 - Email from S. Alexander, NRR to D. Decker, NRR et al. Re: Farley AITNRC Slides.ppt. (2 page(s), 9/18/2007)
- ML073241339 - Email from D. Decker, NRR to K. Cotton, NRR et al. Re: Final Copy Farley AITNRC Slides.ppt. (8 page(s), 9/19/2007)
- ML073241341 - Email from D. Decker, NRR to K. Cotton, NRR et al. on Re: Farley AITNRC Slides.ppt. (1 page(s), 9/19/2007)
- ML073241342 - Email from S. Alexander, NRR to D. Decker, NRR et al. Re: Final Copy Farley AITNRC Slides.ppt. (1 page(s), 9/19/2007)
- ML073241343 - Email from T. McGinty, NRR to B. Boger, NRR, J. Dyer, NRR, C. Haney, NRR and J. Wiggins, NRR on Summary: Today Brief of Senate EPW Committee Staff on the Farley AIT. (1 page(s), 9/19/2007)
- ML073241345 - Email from M. King, NRR to G. Wilson, NRR and K. Cotton, NRR FYI Fwd: Unit 2 Farley Trip. (1 page(s), 10/3/2007)
- ML073241346 - Email from M. Ashley, NRR to R. Martin, NRR and G. Wilson, NRR Re: Supplemental AIT Charter for Farley. (1 page(s), 10/22/2007)
- ML073241347 - Email from M. McConnell, NRR to R. Martin, NRR Re: Briefing on Farley Breaker Inspection. (1 page(s), 10/25/2007)
- ML073241349 - Email from T. McGinty, NRR to M. Franovich, NRR et al. Fwd: Confirmation of Action for Farley. (4 page(s), 10/25/2007)
- ML073241350 - Email from G. Wilson, NRR to K. Miller, NRR, M. McConnell, NRR and R. Martin, NRR Re: Inspection of Cutler Hammer. (2 page(s), 10/30/2007)
- ML080460403 - FOIA/PA-2008-0016 - Resp 2 - Final. (1 page(s), 1/8/2008)