Home > NRC Library > ADAMS Public Documents
Forwards "Earthquake Ground Motion Study in Vicinity of Facility" by Weston Geophysical Corp & "Justification of Seismic Design Criteria Used for Facilities,Phase II, Responses to NRC Questions 1 Through 6."
Accession Number: ML073520920
Date Released: Friday, October 31, 2008
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML073520919 - Forwards "Earthquake Ground Motion Study in Vicinity of Facility" by Weston Geophysical Corp & "Justification of Seismic Design Criteria Used for Facilities,Phase II, Responses to NRC Questions 1 Through 6." (2 page(s), 8/9/1979)
- ML082410330 - "Earthquake Ground Motion Study in Vicinity of Facility" by Weston Geophysical Corp. (112 page(s), 2/28/1979)
- ML082760412 - "Justification of Seismic Design Criteria Used for Facilities,Phase II,Responses to NRC Questions 1 Through 6." (72 page(s), 6/30/1979)
- ML082831450 - "Justification of Seismic Design Criteria Used for Facilities,Phase II,Responses to NRC Questions 1 Through 6." Continuation of Graphs. (72 page(s), 6/30/1979)
- ML082831452 - "Justification of Seismic Design Criteria Used for Facilities,Phase II,Responses to NRC Questions 1 Through 6." Continuation of Graphs. (69 page(s), 6/30/1979)