Home > NRC Library > ADAMS Public Documents
FOIA/PA-2007-0299 - Resp 3 - Partial.
Accession Number: ML073400004
Date Released: Thursday, December 6, 2007
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML073400005 - FOIA/PA-2007-0299 - Resp 3 - Partial. (11 page(s), 11/28/2007)
- ML011440213 - PWR Material Reliability Program Interim Alloy 600 Safety Assessments for US PWR Plants (MRP-44NP). (65 page(s), 5/31/2001)
- ML012350150 - Generic Information for Use by Licensees in Response to NRC Bulletin 2001-01. (44 page(s), 8/21/2001)
- ML023010510 - EPRI Report TP-1006695, Materials Reliability Program (MRP) Crack Growth Rates for Evaluating Primary Water Stress Corrosion Cracking (PWSCC) of Thick-Wall Alloy 600 Material (MRP-55), Non-proprietary version, July 18, 2002. (29 page(s), 7/18/2002)
- ML030650872 - Davis-Besse - 20 Day Response to Order EA-03-009, "Issuance of Order Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors." (11 page(s), 3/1/2003)
- ML031320705 - IR 05000346-03-004, on 02/09 - 03/31/2003, for FirstEnergy Nuclear Operating Company; Davis-Besse Nuclear Power Station. Resident Inspection Report. (34 page(s), 5/9/2003)
- ML040220181 - Issuance of Revised NRC Order EA-03-009 Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors. (28 page(s), 2/20/2004)
- ML041610291 - Davis-Besse, Consent to Revised Order (EA-03-009) Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors. (18 page(s), 3/11/2004)
- ML041680506 - Nonproprietary: Final Report 1009807-NP, "Materials Reliability Program Reactor Vessel Closure Head Penetration Safety Assessment for U.S. PWR Plants (MRP-110 NP)." (286 page(s), 4/30/2004)
- ML041680546 - Nonproprietary-Copyright: Technical Update 1009801, "Materials Reliability Program, Resistance to PWSCC of Alloys, 690, 52, and 152 in PWRS, MRP-111." (282 page(s), 3/31/2004)
- ML043200602 - Non-Proprietary Version of 1011225, "Materials Reliability Program Generic Evaluation of Examination Coverage Requirements for Reactor Pressure Vessel Head Penetration Nozzles, Revision 1 (MRP-95R1NP)." (79 page(s), 9/30/2004)
- ML071340193 - G20070297 - David Lochbaum Ltr. re Supplement to Petition Pursuant to Section 2.206 - Protection Against Control Rode Drive Mechanism (CRDM) Nozzle Leakage Fast Corrosion Scenario or More FirstEnergy Falsehoods. (3 page(s), 5/10/2007)
- ML071280332 - April 2007 Report on the Status of Public Petitions Under Title 10 of the Code of Federal Regulations (10 CFR), Section 2.206. (10 page(s), 5/18/2007)
- ML073400006 - Letter to the Editor Toledo Blade from Anthony Alexander, FENOC on Davis-Besse. (1 page(s), 11/28/2007)
- ML073400008 - Attachment 2 Commitment List, BV-L-07-082. (1 page(s), 11/27/2007)
- ML073400009 - Slide Davis-Besse Operational Experience - 2000 Refueling Outage. (1 page(s), 11/28/2007)
- ML073400010 - E-mail form Bateman to Wengert, Requesting Concurrence on FENOC Confirmatory Order (1 page(s), 8/8/2007)
- ML073400011 - Email from Thomas Wengert, NRR to Eric Duncan, R3 Davis-Besse RPV Head Report. (1 page(s), 3/19/2007)
- ML073400012 - E-mail from Terence Chan, NRR to George Georgiev, NRO and Jay Collins, NRR, re: NEIL Letter dated 02/23/2007. (1 page(s), 3/21/2007)
- ML073400013 - Email from Jay Collins, NRR to Lisa Clark, OGC et al on Introduction to Exponent Report. (3 page(s), 3/23/2007)
- ML073400014 - E-mail from Thomas Wengert, NRR to Tim McGinty, NRR on Davis-Besse Exponent Report. (2 page(s), 3/26/2007)
- ML073400015 - E-mail from Bill Bateman, NRR to Jay Collins, NRR et al on Davis-Besse ARB. (3 page(s), 3/26/2007)
- ML073400016 - E-mail from Thomas Wengent, NRR to Russell Gibbs, NRR on ADAMS Processing/Release of Exponent Report. (2 page(s), 3/27/2007)
- ML073400018 - Email from Thomas Wengert, NRR to Mike King, OIS on Timeline for Public Release of Pkg ML07086211. (2 page(s), 3/28/2007)
- ML073400019 - E-mail from Jay Collins, NRR to Thomas Wengert, NRR on Exponent Report Cover Letter. (4 page(s), 3/28/2007)
- ML073400020 - E-mail from Jay Collins, NRR to Thomas Wengert, NRR Re: ADAMS Package for Exponent Report. (2 page(s), 3/29/2007)
- ML073400021 - E-mail from Michele Evans, NRR to Bill Bateman, NRR et at on Commissioner TA Brief regarding DB Exponent Report. (3 page(s), 4/2/2007)
- ML073400023 - E-mail from Michele Evans, NRR to Bill Bateman, NRR et at, re: Davis-Besse Report by Exponent Regarding Reactor Pressure Vessel Head Wastage. (7 page(s), 4/3/2007)
- ML073400024 - Email from Jay Collins, NRR to Thomas Wengert, NRR on Question on DB Head Inspection Commitments. (20 page(s), 4/4/2007)
- ML073400025 - Email from Thomas Wengert, NRR to Jay Collins, NRR Re: Question on DB Head Inspection Commitments. (1 page(s), 4/4/2007)
- ML073400027 - Email from Jay Collins, NRR to Patricia Craver, NRR Re: FOIA (Out of Office). (2 page(s), 8/14/2007)
- ML073400029 - Email from Jay Collins, NRR to Terence Chan, NRR Fwd: 4/3/07 Memo, Communication Plan for Davis-Besse Exponent Report. (2 page(s), 4/4/2007)
- ML073400033 - Email from Bill Bateman, NRR to Jay Collins, NRR Fwd: Oyster Creek Drywell Report. (1 page(s), 4/4/2007)
- ML073400034 - Email from William Cullen, RES to Jay Collins, NRR on Another Team Takes the Field. (1 page(s), 4/5/2007)
- ML073400036 - Email from Jay Collins, NRR to Allen Hiser, NRR et al. Fwd: Another Team Takes the Field. (3 page(s), 4/5/2007)
- ML073400039 - Email from Jay Collins, NRR to Lisa Clark, OGC et al. Fwd: Another Team Takes the Field. (4 page(s), 4/5/2007)
- ML073400040 - Email from Thomas Wengert, NRR to Jay Collins, NRR Re: Question on DB Head Inspection Commitments. (1 page(s), 4/5/2007)
- ML073400059 - Email from Jay Collins, NRR to Thomas Wengert, NRR Re: Question on DB Head Inspection Commitments. (2 page(s), 4/5/2007)
- ML073400062 - Email from Jay Collins, NRR to George Georgiev, NRO on Questions on Davis-Besse. (2 page(s), 4/6/2007)
- ML073400063 - Email from Michele Evans, NRR to Bruce Boger, NRR and Jim Dyer, NRR Re: Fwd: Fw: Platts Nuclear News Flashes - Davis-Besse. (5 page(s), 4/6/2007)
- ML073400064 - Email from Bill Bateman, NRR to Jay Collins, NRR Re: Fwd: [DBRVH_LTBL] Digest Number 444. (1 page(s), 4/13/2007)
- ML073400065 - E-mail from Thomas Wengert, NRR to Jay Collins, NRR on Status of Exponent Report Review. (1 page(s), 4/16/2007)
- ML073400066 - E-mail from Bill Bateman, NRR to Jay Collins, NRR Re: 4/3/07 Memo, Communication Plan for Davis-Besse Exponent Report. (1 page(s), 4/17/2007)
- ML073400067 - E-mail from Bill Bateman, NRR to Jay Collins, NRR on Exponent Report. (1 page(s), 4/23/2007)
- ML073400068 - Effect of Exponent Analysis of Davis-Besse Reactor Vessel Head Wastage Event on Industry Inspection Programs - Summary Report Submitted by NEI. (14 page(s), 5/31/2007)
- ML073400069 - E-mail from Jay Collins, NRR to Andrea Valentin, RES and William Cullen, NRR re ACTION: 2.206 Petition. (9 page(s), 5/1/2007)
- ML073400070 - E-mail from Terance Chan, NRR to JXC (Jay Collins), NRR Re: Revised Assessment of Exponent Report. (1 page(s), 5/2/2007)
- ML073400071 - E-mail from Michele Evans, NRR to JXC (Jay Collins), NRR Re: Revised Assessment of Exponent Report. (1 page(s), 5/2/2007)
- ML073400072 - Letter from Danny Pace, FENOC to NRC on Request for Response Regarding Report Prepared by Exponent Failure Analysis Associates and Altran Solutions Corporation Regarding Reactor Pressure Vessel Head Wastage at the Davis Besse Nuclear Power Plant... (11 page(s), 5/2/2007)
- ML073400074 - E-mail from Thomas Wengert, NRR to Bill Bateman, NRR et al re response to April 2 letter. (13 page(s), 5/3/2007)
- ML073400075 - E-mail from Jay Collins, NRR to Lisa Clark, OGC re Response to April 2 Letter. (15 page(s), 5/3/2007)
- ML073400076 - E-mail from John Grobe, NRR to Bill Bateman, et al. re D-B Public Communications. (1 page(s), 5/3/2007)
- ML073400079 - E-mail from Bill Bateman, NRR to Jay Collins, NRR on FENOC Response Letter. (2 page(s), 5/3/2007)
- ML073400080 - E-mail from Jay Collins, NRR to Andrea Valentin, RES et al. Re: ML#'s for ADAMS Doc. Package - NRR/RES Assessment of Exponent Report. (2 page(s), 5/4/2007)
- ML073400081 - E-mail from Michele Evans, NRR to JXC (Jay Collins), NRR Re: ML#'s for ADAMS Doc. Package - NRR/RES Assessment of Exponent Report. (1 page(s), 5/4/2007)
- ML073400082 - E-mail from Bella Khodorkovsky, NRR to Andrea Valentin, RES et al. Dispatching: Assessment of Exponent Report Project Number BN63097.001, "Review & Analysis of the David-Besse March 2002 Reactor Pressure Vessel Head Wastage Event," to Ensure Current... (3 page(s), 5/4/2007)
- ML073400083 - E-mail from Michele Evans, NRR to Cynthia Carpenter, OE et al. on Discuss Structure and Details of the DFI for Davis Besse. (3 page(s), 5/8/2007)
- ML073400084 - E-mail from Michele Evans, NRR to JXC (Jay Collins), NRR on Meeting Cancelled: Discussion of further review of Exponent Report; (8 May 2007 17:00) Eastern Daylight Time. (1 page(s), 5/8/2007)
- ML073400085 - E-mail from Bill Bateman, NRR to Jay Collins, NRR re Reference Documents Drafting a DFI. (2 page(s), 5/8/2007)
- ML073400087 - E-mail from Jay Collins, NRR to Thomas Wengert, NRR re Meeting. (3 page(s), 5/10/2007)
- ML073400088 - E-mail from Richard Guzman, NRR to Jay Collins, NRR Re: Web page update. (1 page(s), 5/14/2007)
- ML073400091 - E-mail from Michele Evans, NRR to Jay Collins, NRR on DFI issued to FENOC. (1 page(s), 5/14/2007)
- ML073400107 - E-mail from Thomas Wengert, NRR to Scott Barber, R1 et al. on Mattson Report Available in ADAMS. (2 page(s), 5/15/2007)
- ML073400108 - E-Mail from Collins to LXL2@nrc.gov (L. Lopez), Confirmatory Plan Associated with the Confirmatory Order to be issued to FENOC. (2 page(s), 8/14/2007)
- ML073400109 - E-mail from Richard Guzman, NRR to Jay Collins, NRR Re: Web page update. (2 page(s), 5/16/2007)
- ML073400110 - E-mail from Jay Collins, NRR to Richard Guzman, NRR Re: Web page update. (3 page(s), 5/17/2007)
- ML073400112 - E-mail from Jay Collins, NRR to Richard Guzman, NRR Re: Web page update. (3 page(s), 5/17/2007)
- ML073400113 - E-mail from Jay Collins, NRR to Richard Guzman, NRR Re: Web page update. (3 page(s), 5/17/2007)
- ML073400115 - E-mail from Imboden to Miller, Action: ADES Priorities List due 8/9 COB. (1 page(s), 8/8/2007)
- ML073400116 - Email from Thomas Wengert, NRR to James McKnight, OIS Fwd: FirstEnergy Nuclear Operating Company (FENOC) Exponent Failure Analysis Associates' Technical R. (19 page(s), 5/21/2007)
- ML073400117 - Email from Jay Collins, NRR to Matthew Yoder, NRR Fwd: Re: FOIA-2007-0189 Re-scoped (REVISED). (3 page(s), 5/17/2007)
- ML073400119 - Email from Matthew Yoder, NRR to Jay Collins, NRR Fwd: Re: FOIA-2007-0189 Re-scoped (REVISED). (3 page(s), 5/24/2007)
- ML073400120 - Email from Terence Chan, NRR to Jay Collins, NRR Re: FOIA-2007-0189 re-scoped (REVISED). (3 page(s), 5/25/2007)
- ML073400122 - Email from Terence Chan, NRR to Thomas Wengert, NRR on Meeting w/Lochbaum re: DB 2.206. (11 page(s), 5/30/2007)
- ML073400124 - Email from Terence Chan, NRR to Thomas Wengert, NRR Re: Davis-Besse PRB Meeting w/Petitioner. (1 page(s), 5/30/2007)
- ML073400125 - Email from Michele Evans, NRR to Amy Powell, OCA, Jay Collins, NRR and Undine Shoop, EDO Fwd: Re: Follow-up from 5/23 Briefing for House E&C, Oversight & Investigations Staff. (1 page(s), 5/31/2007)
- ML073400126 - Email from Terence Chan, NRR to Jay Collins, NRR and Thomas Wengert, NRR Re: Davis-Besse DFI Telecon Tuesday 6/5. (11 page(s), 6/4/2007)
- ML073400127 - Email from Thomas Wengert, NRR to Tamara Bloomer, EDO et al on Davis-Besse DFI Planning Pre-Meeting/Telecon. (3 page(s), 6/5/2007)
- ML073400128 - Email from Thomas Wengert, NRR to Terence Chan, NRR et al. on Pre-Meeting for Friday Briefing with Commissioner Jaczko on Exponent Report. (3 page(s), 6/7/2007)
- ML073400129 - Email from Thomas Wengert, NRR to DFI Meeting Group on Communication w/FENOC RE: DFI Public Meeting. (1 page(s), 6/7/2007)
- ML073400130 - Email from John Grobe, NRR to Cynthia Carpenter, OE et al. Re: Briefing for Commissioner Jaczko. (1 page(s), 6/8/2007)
- ML073400132 - Email from Thomas Wengert, NRR to Jay Collins, NRR Re: Briefing for Commissioner Jaczko. (1 page(s), 6/8/2007)
- ML073400134 - Email from Thomas Wengert, NRR to Tamara Bloomer, EDO on DFI Response - Planning Meeting/Telecon. (1 page(s), 6/8/2007)
- ML073400136 - Email from John Grobe, NRR to Doris Twigg, NRR Fwd: Pre-Mtg to the June 27th FENOC Public Mtg. (1 page(s), 6/11/2007)
- ML073400137 - Email from Jay Collins, NRR to WXC (William Cullen), NRR Re: D-B Report Status. (2 page(s), 6/13/2007)
- ML073400140 - Email from Jay Collins, NRR to William Cullen, NRR Fwd: FirstEnergy Nuclear Operating Company Response to May 14, 2007 DFI. (69 page(s), 6/13/2007)
- ML073400141 - Email from Thomas Wengert, NRR to Scott Burnell, PA and Amy Powell, OCA on Davis-Besse Meeting Notice. (2 page(s), 6/14/2007)
- ML073400179 - Email from William Cullen, NRR to Andrea Valentin, RES Fwd: FirstEnergy Nuclear Operating Company Response to May 14, 2007 DFI. (1 page(s), 6/14/2007)
- ML073400182 - Email from Thomas Wengert, NRR to Davis-Besse PRB Group on Anticipated Visitors for PRB Public Meeting. (1 page(s), 6/15/2007)
- ML073400184 - Email from Thomas Wengert, NRR to Davis-Besse PRB Group on PRB Meeting Handout. (18 page(s), 6/18/2007)
- ML073400186 - Email from Tanya Mensah, NRR to G. Orrill, Lehman on NRC Correspondence that You Requested. (2 page(s), 6/18/2007)
- ML073400188 - Email from Tanya Mensah, NRR to Atif Shaikh, NRR et al. on Reminder: Monday, June 18, 2007, Public PRB Meeting - D. Lochbaum 2.206 Petition. (4 page(s), 6/18/2007)
- ML073400191 - E-Mail from Collins to GKL@nrc.gov, Record of Teleconference Between NRC and FENOC. (2 page(s), 8/15/2007)
- ML073400196 - Email from Terence Chan, NRR to Bradley Jones, OGC on David Besse and "Exponent Report". (2 page(s), 6/21/2007)
- ML073400199 - Email from Thomas Wengert, NRR to DFI Meeting Group on Teleconference Info for DFI Meeting. (1 page(s), 6/25/2007)
- ML073400201 - Email from Bella Khodorkovsky, NRR to Bill Bateman, NRR et al. Dispatching: YT020070131 Letter Response to T. Gurdziel, (RPV Head Inspections & Exponent Report). (2 page(s), 6/27/2007)
- ML073400202 - Email from Jay Collins, NRR to Michael Orenak, NRR Fwd: Dispatching: YT020070131 Letter Response to T. Gurdziel, (RPV Head Inspections & Exponent Report). (4 page(s), 6/28/2007)
- ML073400204 - Email Thomas Wengert, NRR to Stephen Sands, NRR on Meeting Notes. (1 page(s), 6/28/2007)
- ML073400207 - Email from Jay Collins, NRR to TJW2 (Thomas Wengert), NRR Re: Fwd: DOJ letter. (2 page(s), 7/3/2007)
- ML073400208 - Email from Michele Evans, NRR to JXC (Jay Collins), NRR Re: Observations and Comments on the June 27 Public Meeting with FENOC. (1 page(s), 7/3/2007)
- ML073400210 - Email from Bill Bateman, NRR to Terence Chan, NRR Fwd: Attached PWR Head Cavity Letter. (4 page(s), 7/5/2007)
- ML073400212 - Email from Jay Collins, NRR to Patricia Craver, NRR and Thomas Wengert, NRR Re: FOIA 2007-0240. (2 page(s), 7/10/2007)
- ML073400214 - Email from Jay Collins, NRR to Patricia Craver, NRR and Thomas Wengert, NRR Re: FOIA 2007-0240. (2 page(s), 7/10/2007)
- ML073400217 - Email from Thomas Wengert, NRR to Patricia Craver, NRR Re: FOIA 2007-0240. (1 page(s), 7/10/2007)
- ML073400219 - Email from Jay Collins, NRR to Matthew Yoder, NRR Re: ADES Priority Issues. (2 page(s), 7/11/2007)
- ML073400222 - Email from Jay Collins, NRR to Bruce Burgess, R3, Doug Starkey, OE and Stephen Sands, NRR Re: CC, SM - FENOC Supplemental DFI Response Discussion. (3 page(s), 7/16/2007)
- ML073400223 - Email from Jay Collins, NRR to Terence Chan, NRR Fwd: Reminder - RIII Davis-Besse ARB starts at 11:05 a.m. EST. (3 page(s), 7/16/2007)
- ML073400227 - Email from Glenna Lappert, NRR to Giovanna Longo, OGC et al. Davis-Besse Nuclear Station - 6-18-2007 Meeting Summary. (11 page(s), 7/16/2007)
- ML073400229 - Email from Michele Evans, NRR to Jay Collins, NRR and Terence Chan, NRR Re: Fwd: ARB Agenda for Region III on Monday, July 16, 2007. (2 page(s), 7/16/2007)
- ML073400230 - Email from Bill Bateman, NRR to JXC (Jay Collins), NRR Re: Fwd: FirstEnergy Nuclear Operating Company Supplemental Response to May 14, 2007 DFI. (1 page(s), 7/16/2007)
- ML073400232 - Email from Bill Bateman, NRR to Jay Collins, NRR Re: Fwd: FirstEnergy Nuclear Operating Company Supplemental Response to May 14, 2007 DFI. (1 page(s), 7/18/2007)
- ML073400234 - Email from Bill Bateman, NRR to Jay Collins, NRR Re: Fwd: FirstEnergy Nuclear Operating Company Supplemental Response to May 14, 2007 DFI. (1 page(s), 7/18/2007)
- ML073400255 - E-mail from Michele Evans, NRR, to Jay Collins, NRR and Terence Chan,NRR re: Davis-Besse. (1 page(s), 7/23/2007)
- ML073400259 - E-mail from Jay Collins, NRR to Terence Chan, NRR re:Fwd: ACTION: ADES Priorities List. (2 page(s), 7/23/2007)
- ML073400260 - E-mail from Jay Collins, NRR to Thomas Wengert, NRR, re: Possible Telecon Wednesday. (2 page(s), 7/24/2007)
- ML073400261 - E-mail from Thomas Wengert, NRR to Jay Collins, NRR re: Conference Call. (30 page(s), 7/26/2007)
- ML073400262 - E-mail from Jay Collins, NRR to Cynthia Davidson, NRR re: Call from Joe Ulie, RGN III, OI re: Tom Gurdziel letter found in ML071790106. (2 page(s), 7/30/2007)
- ML073400266 - E-mail from Jay Collins, NRR to Thomas Wengert, NRR re: Draft FENOC Confirmatory Order. (2 page(s), 7/30/2007)
- ML073400268 - E-mail from Thomas Wengert, NRR to Jay Collins, NRR re: Action G20070534 due Tomorrow. (2 page(s), 8/1/2007)
- ML073400269 - E-mail Russell Gibbs, NRR to Thomas Wengert, NRR DB Meeting. (1 page(s), 8/1/2007)
- ML073400270 - E-mail from Jay Collins, NRR to Doug Starkey, OE, re: Action: G20070534 due Tomorrow. (3 page(s), 8/1/2007)
- ML073400272 - E-mail from Jay Collins, NRR to Leslie Miller, NRR and Terence Chan, NRR re: Action: G20070534 due Tomorrow. (4 page(s), 8/1/2007)
- ML073400273 - E-mail from Bateman to Collins, re: FENOC Order. (1 page(s), 8/8/2007)
- ML073400276 - E-mail from Thomas Wengert, NRR to Jay Collins, NRR, on Couple of Items. (2 page(s), 8/7/2007)