Home > NRC Library > ADAMS Public Documents
FOIA/PA-2006-0230 Web Package
Accession Number: ML063420310
Date Released: Wednesday, November 22, 2006
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML061780311 - FOIA/PA-2006-0230 - Callaway Nuclear Plant & compliance with Technical Specification (TS) 3.7.2, re: unresolved item 05000483/2005002-05, internal documentation of NRC positions or interpretation of TS (2 page(s), 6/26/2006)
- ML062770084 - FOIA/PA-2006-0230 - Resp 1 - Partial. (3 page(s), 9/29/2006)
- ML051590442 - Callaway, License Amendment Request OL-1262 Revision to Technical Specification (TS) 3.7.2, "Main Steam Isolation Valves (MSIVs)," to Add Conditions for Inoperable MSIV Actuator Trains. (34 page(s), 5/26/2005)
- ML052060365 - NRC Inspection Manual Part 9900: Technical Guidance. (38 page(s), 9/26/2005)
- ML062770086 - NRC Inspection Manual, Part 9900, Technical Guidance. (4 page(s), 9/26/2006)
- ML063170287 - FOIA/PA-2006-0230 - Resp 2 - Partial. (9 page(s), 11/7/2006)
- ML063170292 - E-Mail from Peck to Jones, CWY - MSIV Issues. (3 page(s), 10/30/2005)
- ML063170303 - Example, Determining Remaining Mitigation Capability. (1 page(s), 11/22/2005)
- ML063170309 - E-Mail from Peck to Donohew, Availability of personnel on 1/2 3 to resolve Callaway MSIV Issue. (2 page(s), 1/18/2006)
- ML063170315 - Proposed Agenda Callaway MSIV Operability Issues, January 23, 2006. (2 page(s), 1/23/2006)
- ML063170320 - E-Mail from Peck to Graves, Conference Call - CWY MSIV Operability Question. (4 page(s), 2/3/2005)
- ML063170323 - Effect of a Non-Functional Actuator Train on MSIV Operability, Callaway Plant Unit 1. (1 page(s), 11/7/2006)
- ML063170328 - Attachment 3: Markup of Technical Specification Pages. (9 page(s), 11/7/2006)
- ML063170332 - Inspector-Identified and Self-Revealing Findings. (1 page(s), 11/7/2006)
- ML063170335 - Draft input - Effect of inoperable Actuator Trains on MSIV Operability, Callaway Plant, Unit 1. (1 page(s), 11/7/2006)
- ML063170340 - E-mail from Schulten to Terao, Re: Callaway License Amendment on MSIV Actuators Issued. (1 page(s), 6/19/2006)
- ML063130487 - FOIA/PA-2006-0230 - Resp 3 - Partial (3 page(s), 11/8/2006)
- ML063320111 - FOIA/PA-2006-0230 Resp 4 - Final. (5 page(s), 11/24/2006)
- ML063320112 - E-Mail from Peck to Jones, CWY - Regarding MSIVs. (1 page(s), 11/2/2005)
- ML063320113 - E-mail from Dumbacher to Peck - Callaway Actual Surveillance for Testing MSIVs Per TS SR 37.2.2. (1 page(s), 4/27/2006)
- ML063320115 - E-Mail from Peck to Wang - CVVY MSIV Operability Question. (2 page(s), 1/3/2005)