- ML061280070 - Waterford Steam Electric Station, Unit 3, Report of Facility Changes, Tests and Experiments and Commitment Changes. (5 page(s), 5/1/2006)
- ML061280073 - Commitment Summary Report (12 page(s), 4/25/2006)
- ML061280074 - Amendment 91, New TRM 3.0/4.0 Section, Remove Shutdown Requirments form TRM (18 page(s), 7/27/2004)
- ML061280075 - Amendment 92, Move Pressurizer Heat-up and Cooldown Limits to TRM and Remove Shutdown Requirements. (19 page(s), 8/12/2004)
- ML061280076 - Calculations EC-M88-021 and EC-E89-016, Station Blackout Water Requirements form Extended Power Up-Rate. (10 page(s), 11/10/2004)
- ML061280119 - ER-W3-2001-1149-005, Extended Power Up-rate Impact to FSAR Chapter 5. (23 page(s), 12/2/2004)
- ML061280079 - ER-W3-2001-1149-010, Extended Power Uprate- FSAR Chapter 10. (16 page(s), 12/23/2004)
- ML061280082 - ER-W3-2001-1149-015, EPU Impact on FSAR Chapter 15. (8 page(s), 1/6/2005)
- ML061280084 - ER-W3-2001-1149-009, 3716 MWT Extended Power Uprate Evaluation of FSAR Chapter 9. (17 page(s), 1/13/2005)
- ML061280085 - ER-W3-2004-0137-000, In Core Instrumentation Thimble Support Plate Modification. (14 page(s), 1/27/2005)
- ML061280088 - ER-W3-2004-0276-000, Alternate Source Term Implementation. (16 page(s), 2/4/2005)
- ML061280089 - ER-W3-2004-0478-000, Steam Generator Sub-Compartment Platforms Addition Impact. (11 page(s), 2/24/2005)
- ML061280090 - ER-W3-2004-0602-000, Steam Generator Feedwater Pump Trip Logic Modification Due to Extended Power Up-rate. (10 page(s), 2/28/2005)
- ML061280091 - ER-W3-2004-0122-000, Pressurizer Heater Sleeves and Instrument Nozzles Weld Repair. (16 page(s), 2/25/2005)
- ML061280092 - ER-W3-2005-0019-000, Steam Generator Level Set-Points Modification Due to Extended Power Up-Rate. (14 page(s), 3/10/2005)
- ML061280094 - ER-W-2003-0662-000, 480 Volts Safety Buses Limit Change When On Startup Transformers. (9 page(s), 4/4/2005)
- ML061280095 - ER-W3-2005-0083-000, Health Physics Calculations Implementation from Extended Power Up-Rate and Alternate Source Term. (11 page(s), 4/11/2005)
- ML061280096 - ER-W3-2004-0116-003, Core Next Generation Fuel and Lead Test Assemblies from Reload Analysis Report. (17 page(s), 4/22/2005)
- ML061280097 - ER-W3-2003-0053-000, High Pressure Turbine Design Upgrade for Extended Power Up-Rate. (11 page(s), 4/15/2005)
- ML061280098 - ER-W3-2002-0595-000, Main Generator Output Breaker Modification From Extended Power Up-Rate. (10 page(s), 4/18/2005)
- ML061280100 - ER-W3-2005-0130-000, Temporary Alteration for Keeping Circulating Water System Operating. (11 page(s), 4/25/2005)
- ML061280101 - DRN-04-1244 and DRN 05-316, Technical Requirements Manual and Final Safety Analysis Report Change Due to Extended Power Up-rate. (13 page(s), 5/6/2005)
- ML061280102 - Core Operating Limits Report and Startup and Setpoint Transmittal For Cycle 14, Changes to Moderator Temperature Coefficient, Linear Heat Rate, Departure From Nuclear Boiling Rate Margin, Axial Shape Index, Revised Core Operating Limit. (14 page(s), 5/10/2005)
- ML061280103 - ER-W3-2004-0615-000, Ultimate Heat Sink Impact Due to Extended Power Up-rate with Design Bases Tornado Event. (14 page(s), 5/12/2005)
- ML061280104 - ER-W3-2005-0145-000, Annulus Negative Pressure Impact Due to Extended Power Up-Rate Considering Instrument Uncertainty. (14 page(s), 5/26/2005)
- ML061280107 - ER-W3-2004-0276-001, Environmental Qualification Impacts Due to Alternate Source Term Methdology. (12 page(s), 6/3/2005)
- ML061280108 - ER-W3-2004-0276-002, Steam Generator Tube Rupture Impacts Due to Alternate Source Term Methodology with Revised Assumptions. (14 page(s), 6/6/2005)
- ML061280111 - ER-W3-2004-0122-000, Pressurizer Heater Sleeve And Instrument Nozzle Repair. (17 page(s), 6/6/2005)
- ML061280112 - ER-W3-2005-0378-000, Outside Containment Leak Reduction Program Test Medium Change. (11 page(s), 9/14/2005)
- ML061280113 - ER-W3-2005-0396-000, Confirmatory Criticality Calculation Correction for Spent Fuel Racks. (10 page(s), 9/14/2005)
- ML061280114 - ER-W3-2005-0334-001, Temporary Alteration for Reactor Vessel Gasket Leak-off Pressure High Annunciator. (9 page(s), 10/19/2005)
- ML061280116 - ER-W3-2004-0331-000, Reactor Cavity Cooling System Temperature Clarification. (10 page(s), 4/9/2005)
- ML061280117 - ER-W3-2000-0334-000, Heating Ventilation And Air Conditioning Equipment Room And Component Cooling Heat Exchanger Room Calculations Correction. (10 page(s), 12/1/2005)