Home > NRC Library > ADAMS Public Documents
FOIA/PA-2004-0277 - Resp 25 - Partial.
Accession Number: ML050840391
Date Released: Thursday, March 31, 2005
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML050840392 - FOIA/PA-2004-0277 - Resp 25 - Partial. (3 page(s), 3/23/2005)
- ML032030584 - Risk-Informed Inspection Guidance for Post-Fire Safe-Shutdown Inspections. (17 page(s), 8/11/2003)
- ML050840393 - Final Report, Post-Fire Manual Action Feasibility Assessment: A Phase 3 Significance Determination Process (SDP) Evaluation of Arkansas Nuclear One , Unit 1. (113 page(s), 7/31/2003)
- ML050840394 - Agenda for Public Meeting on Interim Feasibility Criteria for Fire Protection Manual Action. (1 page(s), 11/12/2003)
- ML050840397 - Federal Register Notice, Draft criteria for Determining Feasibility of Manual Actions to Achieve Post-Fire Safe Shutdown. (3 page(s), 11/26/2003)
- ML050840399 - Ltr to NRC from Lochbaum, Request for 30-Day Extension to Public Comment Period Regarding Post-Fire Operation Manual Actions in Lieu of Non-Compliance with 10 CFR 50 Appendix R Subpart III. G.2. (2 page(s), 12/2/2003)
- ML050840401 - Interim Enforcement Discretion Policy on Post-Fire Operator Manual Action. (1 page(s), 3/23/2005)