Home > NRC Library > ADAMS Public Documents
Change Notice 05-007
Accession Number: ML050700212
Date Released: Monday, February 28, 2005
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML050700065 - Inspection Manual Change Notice 05-007 (3 page(s), 2/28/2005)
- ML050700205 - Table of Contents for Inspection Manual Change Notice 05-007 (31 page(s), 2/28/2005)
- ML050700081 - IMC 0609 App F, Fire Protection Significance Determination Process (56 page(s), 2/28/2005)
- ML050700085 - IMC 0609 App F, Att 1, Part 1: Application of Fire Procection SDP Phase 1 Worksheet (24 page(s), 2/28/2005)
- ML050700089 - IMC 0609, App F, Att 2, Degradation Rating Guidance Specific to Various Fire Protection Program Elements (10 page(s), 2/28/2005)
- ML050700092 - IMC 0609 App F, Att 3, Guidance for Identifying Fire Growth and Damage Scenarios (6 page(s), 2/28/2005)
- ML050700095 - IMC 0609 App F, Att 4, Fire Ignition Source Mapping Information: Fire Frequency, Counting Instructions, Applicable Fire Severity Characteristics, and Applicable Manual Fire Suppression Curves (6 page(s), 2/28/2005)
- ML050700099 - IMC 0609 App F, Att 5, Characterizing Non-Simple Fire Ignition Sources (8 page(s), 2/28/2005)
- ML050700114 - IMC 0609 App F, Att 6, Guidance for the Identification of Targets and Their Ignition and Damage Criteria (4 page(s), 2/28/2005)
- ML050700124 - IMC 0609 App F, Att 7, Guidance for Fire Growth and Damage Time Analysis (12 page(s), 2/28/2005)
- ML050700139 - IMC 0609 App F, Att 8, Guidance for Fire Non-Suppression Probability Analysis (14 page(s), 2/28/2005)
- ML050700153 - IMC 0308 Att 3, App F, Technical Basis for Fire Protection Significance Determination Process At Power Operations (78 page(s), 2/28/2005)
- ML050700162 - IMC 0609 App G, Shutdown Operations Significance Determination Process (8 page(s), 2/28/2005)
- ML050700168 - IMC 0609 App G, Att 2, Phase 2 Significance Determination Process Template for PWR During Shutdown (58 page(s), 2/28/2005)
- ML050700185 - IMC 0609 App G, Att 3, Phase 2 Significance Determination Process Template for BWR During Shutdown (48 page(s), 2/28/2005)
- ML050700199 - IMC 0308 Att 3, App G, Technical Basis for Shutdown Operations Significance Determination Process (39 page(s), 2/28/2005)