Transmittal of Revision 3A to the Generic Implementation Procedure for Seismic Verification of Nuclear Plant Equipment.
Accession Number: ML040560253
Date Released: Thursday, March 4, 2004
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML040560256 - Transmittal of Revision 3A to the Generic Implementation Procedure for Seismic Verification of Nuclear Plant Equipment. (2 page(s), 2/16/2004)
- ML040560263 - Revision 3A to, "Generic Implementation Procedure (GIP) for Seismic Verification of Nuclear Plant Equipment," Preface through Reasons for Changes to GIP, Front Matter. (31 page(s), 12/31/2001)
- ML040560264 - Revision 3A to, "Generic Implementation Procedure (GIP) for Seismic Verification of Nuclear Plant Equipment," Part I, Licensing and Implementation Guidelines. (29 page(s), 12/31/2001)
- ML040560266 - Revision 3A to, "Generic Implementation Procedure (GIP) for Seismic Verification of Nuclear Plant Equipment," Part II, Generic Procedure for Plant-Specific Implementation. (1 page(s), 12/31/2001)
- ML040560268 - Revision 3A to, "Generic Implementation Procedure (GIP) for Seismic Verification of Nuclear Plant Equipment," Section 1, Introduction. (9 page(s), 12/31/2001)
- ML040560269 - Revision 3A to, "Generic Implementation Procedure (GIP) for Seismic Verification of Nuclear Plant Equipment," Section 2, Seismic Evaluation Personnel. (10 page(s), 12/31/2001)
- ML040560271 - Revision 3A to, "Generic Implementation Procedure (GIP) for Seismic Verification of Nuclear Plant Equipment," Section 3, Identification of Safe Shutdown Equipment. (42 page(s), 12/31/2001)
- ML040560272 - Revision 3A to, "Generic Implementation Procedure (GIP) for Seismic Verification of Nuclear Plant Equipment," Section 4, Screening Verification and Walkdown. (69 page(s), 12/31/2001)
- ML040560273 - Revision 3A to, "Generic Implementation Procedure (GIP) for Seismic Verification of Nuclear Plant Equipment," Section 5, Outlier Identification and Resolution. (11 page(s), 12/31/2001)
- ML040560275 - Revision 3A to, "Generic Implementation Procedure (GIP) for Seismic Verification of Nuclear Plant Equipment," Section 6, Relay Functionality Review. (25 page(s), 12/31/2001)
- ML040560276 - Revision 3A to, "Generic Implementation Procedure (GIP) for Seismic Verification of Nuclear Plant Equipment," Section 7, Tanks and Heat Exchangers Review. (58 page(s), 12/31/2001)
- ML040560277 - Revision 3A to, "Generic Implementation Procedure (GIP) for Seismic Verification of Nuclear Plant Equipment," Section 8, Cable and Conduit Raceway Review. (60 page(s), 12/31/2001)
- ML040560278 - Revision 3A to, "Generic Implementation Procedure (GIP) for Seismic Verification of Nuclear Plant Equipment," Section 9, Documentation. (12 page(s), 12/31/2001)
- ML040560280 - Revision 3A to, "Generic Implementation Procedure (GIP) for Seismic Verification of Nuclear Plant Equipment," Section 10, References. (6 page(s), 12/31/2001)
- ML040560281 - Revision 3A to, "Generic Implementation Procedure (GIP) for Seismic Verification of Nuclear Plant Equipment," Appendix A, Procedure for Identification of Safe Shutdown Equipment. (56 page(s), 12/31/2001)
- ML040560283 - Revision 3A to, "Generic Implementation Procedure (GIP) for Seismic Verification of Nuclear Plant Equipment," Appendix B, Summary of Equipment Class Descriptions and Caveats. (107 page(s), 12/31/2001)
- ML040560288 - Revision 3A to, "Generic Implementation Procedure (GIP) for Seismic Verification of Nuclear Plant Equipment," Appendix C, Anchorage Data. (59 page(s), 12/31/2001)
- ML040560289 - Revision 3A to, "Generic Implementation Procedure (GIP) for Seismic Verification of Nuclear Plant Equipment," Appendix D, Seismic Interaction. (10 page(s), 12/31/2001)
- ML040560290 - Revision 3A to, "Generic Implementation Procedure (GIP) for Seismic Verification of Nuclear Plant Equipment," Appendix E, Preparatory Work Prior to Walkdown. (7 page(s), 12/31/2001)
- ML040560291 - Revision 3A to, "Generic Implementation Procedure (GIP) for Seismic Verification of Nuclear Plant Equipment," Appendix F, Screening Walkdown Plan. (7 page(s), 12/31/2001)
- ML040560293 - Revision 3A to, "Generic Implementation Procedure (GIP) for Seismic Verification of Nuclear Plant Equipment," Appendix G, Screening Evaluation Work Sheets (SEWS). (60 page(s), 12/31/2001)