Home > NRC Library > ADAMS Public Documents
Response to the 2nd PIRT Meeting (December 11 & 12, 2003) Thermal Hydraulics Subpanel Information Requests.
Accession Number: ML040510209
Date Released: Sunday, March 2, 2003
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML040510224 - Response to the 2nd PIRT Meeting (December 11 & 12, 2003) Thermal Hydraulics Subpanel Information Requests. (4 page(s), 2/11/2004)
- ML040540037 - Revision 0 to 108US-03500-225-003, "Scenario Description for RD-14M Inlet Header Critical Break LOCA Test B9401". (70 page(s), 2/29/2004)
- ML040540048 - Revision 0 to 108US-03532-225-002, "Scenario Description for ACR-700 Inlet Header Critical Break LOCA". (39 page(s), 2/29/2004)
- ML040540054 - 01/13/2004 Presentation to ACRS Subcommittee on Future Plant Designs, "The ACR Class 1 Pressure Boundary". (24 page(s), 1/13/2004)
- ML040540068 - 01/13/2004 Presentation to ACRS Subcommittee on Future Plant Designs, "ACR Fuel". (23 page(s), 1/13/2004)
- ML040540077 - Figure - ECI Injection Piping Configuration. (1 page(s), 2/11/2004)
- ML040540082 - Figure - ECI Injection Piping Configuration. (1 page(s), 2/11/2004)
- ML040540088 - Figure - ECI Interconnect and RCS Balance Line Flow Diagram. (1 page(s), 2/11/2004)
- ML040540096 - Figure - LTC System Configuration. (1 page(s), 2/11/2004)
- ML040540104 - Figure - LTC System Configuration. (1 page(s), 2/11/2004)
- ML040540115 - Figure - Main RCS Piping Configuration. (1 page(s), 2/11/2004)
- ML040540122 - Figure - Main RCS Feeders and Headers. (1 page(s), 2/11/2004)
- ML040540131 - Figure - Main RCS Piping and Reactor Assembly. (1 page(s), 2/11/2004)
- ML040540133 - Figure - Main RCS (With One Flow Path). (1 page(s), 2/11/2004)
- ML040540139 - Figure - RD14M. (2 page(s), 2/11/2004)