Home > NRC Library > ADAMS Public Documents
FOIA/PA-2003-0018 - Resp 5 - Partial.
Accession Number: ML031080479
Date Released: Friday, April 18, 2003
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML031050021 - FOIA/PA-2003-0018 - Resp 5 - Partial. (7 page(s), 4/10/2003)
- ML031050024 - E-mail from C SLipa to E Chelliah, subject: Information on LER 346-2002-002-00. (1 page(s), 5/6/2002)
- ML031050026 - E-mail from S Long to S Burgess, regarding DB Questions. (1 page(s), 4/29/2002)
- ML031050029 - E-mail from S Long to J Grobe, M Caruso and S Burgess, Re: COMSECY responses and Davis-Besse questions. (1 page(s), 4/30/2002)
- ML031050030 - E-mail from J Grobe to A Hiser et al., Re: Responses to Two NRC Questions Following the Root Cause Analysis Presentation. (3 page(s), 5/20/2002)
- ML031050034 - E-mail from A Howell to J Grobe, Re: LLTF Request for Regional Presentation. (2 page(s), 5/21/2002)
- ML031050038 - Letter to W Tauzin from R Meserve, forwarding additional agency records responsive to 05/24/02 letter. (40 page(s), 7/9/2002)
- ML031050039 - E-mail from S Long to L Collins re: DB0350 Panel Meeting. (1 page(s), 7/10/2002)
- ML031080476 - E-mail from A Howell to LLTF Re: Updated Integrated Schedule. (4 page(s), 7/15/2002)
- ML031050042 - Letter to W Tauzin from R Meserve enclosing final set of documents in response to letter dated 05/24/2002. (2 page(s), 7/19/2002)
- ML031050045 - E-mail from J Grobe to W Dean Re: Meeting w/ET on Dvis Besse Risk Assessment & SDP Process. (2 page(s), 9/9/2002)
- ML031050047 - E-mail from W Cullen to S Long, Re: Alloy 600 Crack Growth Rates for D-B Nozzle # 47. (1 page(s), 9/4/2002)
- ML031050060 - E-mail from S Long to D Marksberry and S Burgess Re: Definition of SDP "Risk Question" for Davis Besse Head Cavity. (1 page(s), 5/3/2002)
- ML031050062 - E-mail from S Long to S Bloom Re: May 9 Internal Panel Meeting. (4 page(s), 5/9/2002)
- ML031050064 - E-mail from J Grobe to M Johnson, S long and W Dean Re: May 9 Internal Panel Meeting. (1 page(s), 5/10/2002)
- ML031050066 - 05/24/02 E-mail from S Long. (2 page(s), 5/24/2002)
- ML031050071 - E-mail from M Holmberg to J Grobe Re: May 9 Internal Panel Meeting. (1 page(s), 6/3/2002)
- ML031050072 - E-mail from S Long to S Burgess Re: Davis-Besse 0350 mtg attendance. (2 page(s), 6/19/2002)
- ML031050074 - E-mail from S Long to L Collins Re: Attend 7/2 panel meeting. (2 page(s), 6/27/2002)
- ML031050076 - E-mail from J Grobe to P Wilson and S Long, Re: Davis-Besse Risk Assessment. (1 page(s), 7/1/2002)
- ML031050079 - E-mail from S Long to D Snowberger Re: next three panel Meetings. (2 page(s), 7/8/2002)
- ML031050085 - E-mail from S Long to D Snowberger, Re: Updated Action Item List. (2 page(s), 7/9/2002)
- ML031050088 - E-mail from S Long to L Collins Re: Attend 7/25 Panel Meeting. (1 page(s), 7/18/2002)
- ML031050132 - Letter to J Dyer from Bergendahl, FENOC, Response to Request for Additional Information Related to Davis-Besse Nuclear Power Station Safety Significance Assessment. (67 page(s), 7/20/2002)
- ML031050095 - E-mail from J Grobe to S Long, Re: Industry Conference Presentation on Davis-Besse. (2 page(s), 7/31/2002)
- ML031050102 - E-mail from J Grobe to B Sheron, B Gorger, C Casto, G Holahan, J Zwolinski and M Mayfield, Re: Industry Conference Presentation on Davis-Besse. (2 page(s), 8/1/2002)
- ML031050104 - E-mail from J Grobe to C Lipa, D Coe, L Collins, S Burgess and V McCree Re: Risk Approach. (2 page(s), 9/5/2002)
- ML031050196 - Memorandum to J Zwolinski from M Mayfield, Subject: Structural Analysis of Rupture Capacity of Exposed Cadding at Davis Besse. (99 page(s), 10/1/2002)
- ML031050114 - E-mail from S Long to D Pickett Re: Dimensions Davis-Besse Cavity. (1 page(s), 5/28/2002)