05000293 PILGRIM Initial Exam (4/28 - 5/3/2000) Facility Developed
Accession Number: ML010380093
Date Released: Friday, April 19, 2024
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML003733166 - Examination Materials from Facility dtd 3/14/2000 (474 page(s), 3/14/2000)
- ML003717190 - Pilgrim Nuclear Power Station Senior Reactor Operator Initial Examination Report 05000293/2000-301 (122 page(s), 5/12/2000)
- ML010720315 - F1 - NRC Corporate Notification Ltr dtd 12/9/99 (4 page(s), 12/9/1999)
- ML010720327 - F1 - Final QA/Related Forms (28 page(s), 5/3/2000)
- ML010720335 - F1 - NRC Final Exam Results Letter w/o Enclosures dtd 5/17/00 (3 page(s), 5/17/2000)
- ML010720341 - F1 - Licensee Ltr re Submitting of Exam Documentation w/o enclosures dtd 5/4/00 (1 page(s), 5/4/2000)
- ML010730008 - Draft - Various Licensee Ltrs re pre-administration (6 page(s), 2/11/2000)
- ML010730010 - Draft - NRC Comments (7 page(s), 4/28/2000)
- ML010730012 - Draft - Outlines (20 page(s), 4/28/2000)
- ML010730014 - Draft - SRO Written (104 page(s), 4/28/2000)
- ML010730018 - Draft - Section A Operating (32 page(s), 4/28/2000)
- ML010730020 - Draft - Section B Operating (36 page(s), 4/28/2000)
- ML010730024 - Draft - Section C Operating (62 page(s), 4/28/2000)
- ML010730223 - Final - Outlines (Written Same as Draft ) (2 page(s), 4/28/2000)
- ML010730232 - Final - SRO Written (101 page(s), 4/28/2000)
- ML010730239 - Final - Section A Operating (19 page(s), 4/28/2000)
- ML010730249 - Final - Section B Operating (33 page(s), 4/28/2000)
- ML010730255 - Final - Section C Operating (62 page(s), 4/28/2000)
- ML010790530 - F1 - NRC Final Exam Results LTr w/o Enclosures dtd 5/17/2000 (3 page(s), 5/17/2000)