| Location of Projected New Nuclear Power Reactors |
| Bell Bend |
| Bellefonte, Units 3 & 4 |
| Callaway, Unit 2 |
| Calvert Cliffs, Unit 3 |
| Comanche Peak Units, 3 & 4 |
| Fermi, Unit 3 |
| Grand Gulf, Unit 3 |
| Levy County, Units 1 & 2 |
| Nine Mile Point, Unit 3 |
| North Anna, Unit 3 |
| River Bend Station, Unit 3 |
| Shearon Harris, Units 2 & 3 |
| South Texas Project, Units 3 & 4 |
| Turkey Point, Units 6 & 7 |
| Victoria County Station, Units 1 & 2 |
| Virgil C. Summer, Units 2 & 3 |
| Vogtle, Units 3 & 4 |
| William States Lee III, Units 1 & 2 |
|
Home > Nuclear Reactors > New Reactors > Combined License Applications > South Texas Project, Units 3 and 4 Application
South Texas Project, Units 3 and 4 Application
|
| Who: |
STP Nuclear Operating Company (STPNOC)
|
| What: |
Application for a combined license (COL) for two Advanced Boiling Water Reactors (ABWR) designated as South Texas Project, Units 3 & 4
|
| When: |
September 20, 2007 (date of application submittal)
|
| Where: |
STPNOC's South Texas Project site near Bay City in Matagorda County, Texas |
|
On this page:
Some links on this page are to documents in our our Agencywide Documents Access and Management System (ADAMS). For additional information, see our Plugins, Viewers, and Other Tools.
Reference Documents
- ABWR DCD - STP Nuclear Operating Company Revision 4
- NUREG-1503 - FSER documents related to ABWR design certification

Applicant Documents
Some combined license applications were submitted with hyperlinks to various reference documents. Currently, the hyperlinks in those applications are not active. These hyperlinks represent an advanced feature that could be activated when the agency upgrades to web-based ADAMS, at which point these applications and documents such as the Design Control Documents would be linked together. In the interim, and for those applications that do not have the hyperlink feature, the reference documents may be viewed under the Reference Documents section of the combined license application page. In addition, DVDs of the various documents are available by contacting the Public Document Room staff.
| Date |
Description |
| 09/24/08 |
STPNOC letter regarding submittal of STP 3 & 4 COLA revision 2
- Part 1 - General and Financial Information
- Part 2 - Final Safety Analysis Report (FSAR)
- Part 3 - Environmental Report
- Part 4 - Technical Specifications
- Part 5 - Emergency Plan
- Part 6 - not used (place holder for Site Redress Plan if needed at later date)
- Part 7 - Summary of exemptions to and departures from the ABWR DCD
- Part 8 - [This Part contains safeguards information which is withheld from public availability]
- Part 9 - Inspection, Tests, Analyses and Acceptance Criteria (ITAAC)
|
| 08/19/08 |
STPNOC letter regarding submittal of due diligence assessment of Toshiba Corporation's qualification to supply the design of the ABWR
|
| 01/31/08 |
STPNOC letter regarding submittal of STP 3 & 4 COLA revision 1
|
| 01/10/08 |
STPNOC letter regarding NRC Review Schedule of Combined License Application
|
| 09/20/07 |
STPNOC transmittal letter for STP 3 & 4 COLA
|

Application Review Schedule
| Key Milestones |
Completion Date Actual - A Target - T |
| Application Tendered |
09/20/07 - A |
| Acceptance Review |
Acceptance Review Start |
10/01/07 - A |
Docketing Decision Letter Issued/Acceptance Review Complete |
11/29/07 - A |
Review Schedule Established/Schedule Letter Issued to Applicant |
02/10/09 - A |
| Safety Review |
Phase 1 - Requests for Additional Information (RAIs) Issued to Applicant |
09/18/09 - T |
Phase 2 - SER with Open Items issued |
04/22/10 - T |
Phase 3 - ACRS Review of SER with Open Items Complete |
08/10 - T |
Phase 4 - Advanced SER with no Open Items Issued |
04/11 - T |
Phase 5 - ACRS Review of SER with no Open Items Complete |
07/11 - T |
Phase 6 - Final SER Issued |
09/11 - T |
| Environmental Review |
Phase 1 - EIS Scoping Summary Report issued |
09/26/08 - A |
Phase 2 - Draft EIS issued to EPA |
03/10 - T |
Phase 3 - Response to public comments on draft EIS issued |
09/10 - T |
Phase 4 - Final EIS issued to EPA |
03/11 - T |
| Hearing |
Commission or ASLB hold mandatory hearing |
|
| License |
Commission decision on issuance of COL application |
|
Information on Federal Register notices for receipt of the application and opportunity to request a hearing or petition to intervene can be found on the Hearing Opportunities page.

NRC Documents
| Date |
Description |
| 02/13/09 |
Federal Register Notice Regarding Opportunity to Petition for Leave to Intervene and Order Imposing Procedures for Access to Sensitive Unclassified Nonsafeguards Information and Safeguards Information for Contention Preparation
|
| 02/10/09 |
South Texas Project Units 3 and 4 Combined License Application Review Schedule
|
| 02/13/08 |
Notification of Withdrawal of Hearing Notice for South Texas Project COL Application
|
| 01/30/08 |
Staff Review of the Combined License Application for South Texas Project, Units 3 and 4
|
| 12/21/07 |
Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping Process
|
| 12/19/07 |
Federal Register Notice Regarding Opportunity to Petition for Leave to Intervene
|
| 11/29/07 |
Notification of Docketing and Federal Register Notice
|
| 10/16/07 |
Acknowledgement of Receipt of Application and Federal Register Notice
|

Requests for Additional Information
For all safety-related RAIs and the applicant's related responses
eRAI Safety Report .
Note that some RAIs and related responses may not be publicly available because they contain sensitive information.
The following table provides access to environmental RAIs and the applicant's subsequent responses.

Public Meetings
| Date |
Description |
| 07/23/08 |
Discussion of STPNOC's plans to submit revisions to COLA
|
| 02/05/08 |
Public Scoping Meeting
|
| 06/23/07 |
Public Outreach
|

Contacts
| Contacts for the South Texas Project COL Application |
| Safety Project Manager |
George Wunder |
| Environmental Project Manager |
Jessie M. Muir
|
| Contact a Public Affairs Officer |

|