Combined License Applications for New Reactors
Location of Projected New Nuclear Power Reactors
Applications Received
Bell Bend
Bellefonte, Units 3 & 4
Callaway, Unit 2
Calvert Cliffs, Unit 3
Comanche Peak Units, 3 & 4
Fermi, Unit 3
Grand Gulf, Unit 3
Levy County, Units 1 & 2
Nine Mile Point, Unit 3
North Anna, Unit 3
River Bend Station, Unit 3
Shearon Harris, Units 2 & 3
South Texas Project, Units 3 & 4
Turkey Point, Units 6 & 7
Victoria County Station, Units 1 & 2
Virgil C. Summer, Units 2 & 3
Vogtle, Units 3 & 4
William States Lee III, Units 1 & 2

South Texas Project, Units 3 and 4 Application

South Texas Project
Who:   STP Nuclear Operating Company (STPNOC)

What:   Application for a combined license (COL) for two Advanced Boiling Water Reactors (ABWR) designated as South Texas Project, Units 3 & 4

When:   September 20, 2007 (date of application submittal)

Where:   STPNOC's South Texas Project site near Bay City in Matagorda County, Texas

On this page:

Some links on this page are to documents in our our Agencywide Documents Access and Management System (ADAMS). For additional information, see our Plugins, Viewers, and Other Tools.

Reference Documents

  • ABWR DCD - STP Nuclear Operating Company Revision 4
  • NUREG-1503 - FSER documents related to ABWR design certification

To top of page

Applicant Documents

Some combined license applications were submitted with hyperlinks to various reference documents. Currently, the hyperlinks in those applications are not active. These hyperlinks represent an advanced feature that could be activated when the agency upgrades to web-based ADAMS, at which point these applications and documents such as the Design Control Documents would be linked together. In the interim, and for those applications that do not have the hyperlink feature, the reference documents may be viewed under the Reference Documents section of the combined license application page. In addition, DVDs of the various documents are available by contacting the Public Document Room staff.

Date Description
09/24/08 STPNOC letter regarding submittal of STP 3 & 4 COLA revision 2
  • Part 1 - General and Financial Information
  • Part 2 - Final Safety Analysis Report (FSAR)
  • Part 3 - Environmental Report
  • Part 4 - Technical Specifications
  • Part 5 - Emergency Plan
  • Part 6 - not used (place holder for Site Redress Plan if needed at later date)
  • Part 7 - Summary of exemptions to and departures from the ABWR DCD
  • Part 8 - [This Part contains safeguards information which is withheld from public availability]
  • Part 9 - Inspection, Tests, Analyses and Acceptance Criteria (ITAAC)
08/19/08 STPNOC letter regarding submittal of due diligence assessment of Toshiba Corporation's qualification to supply the design of the ABWR
01/31/08 STPNOC letter regarding submittal of STP 3 & 4 COLA revision 1
01/10/08 STPNOC letter regarding NRC Review Schedule of Combined License Application
09/20/07 STPNOC transmittal letter for STP 3 & 4 COLA

To top of page

Application Review Schedule

Key Milestones Completion Date
Actual - A
Target - T
Application Tendered 09/20/07 - A
Acceptance Review
Acceptance Review Start
10/01/07 - A
Docketing Decision Letter Issued/Acceptance Review Complete
11/29/07 - A
Review Schedule Established/Schedule Letter Issued to Applicant
02/10/09 - A
Safety Review
Phase 1 - Requests for Additional Information (RAIs) Issued to Applicant
09/18/09 - T
Phase 2 - SER with Open Items issued
04/22/10 - T
Phase 3 - ACRS Review of SER with Open Items Complete
08/10 - T
Phase 4 - Advanced SER with no Open Items Issued
04/11 - T
Phase 5 - ACRS Review of SER with no Open Items Complete
07/11 - T
Phase 6 - Final SER Issued
09/11 - T
Environmental Review
Phase 1 - EIS Scoping Summary Report issued
09/26/08 - A
Phase 2 - Draft EIS issued to EPA
03/10 - T
Phase 3 - Response to public comments on draft EIS issued
09/10 - T
Phase 4 - Final EIS issued to EPA
03/11 - T
Hearing
Commission or ASLB hold mandatory hearing
 
License
Commission decision on issuance of COL application
 

Information on Federal Register notices for receipt of the application and opportunity to request a hearing or petition to intervene can be found on the Hearing Opportunities page.

To top of page

NRC Documents

Date Description
02/13/09 Federal Register Notice Regarding Opportunity to Petition for Leave to Intervene and Order Imposing Procedures for Access to Sensitive Unclassified Nonsafeguards Information and Safeguards Information for Contention Preparation
02/10/09 South Texas Project Units 3 and 4 Combined License Application Review Schedule
02/13/08 Notification of Withdrawal of Hearing Notice for South Texas Project COL Application
01/30/08 Staff Review of the Combined License Application for South Texas Project, Units 3 and 4
12/21/07 Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping Process
12/19/07 Federal Register Notice Regarding Opportunity to Petition for Leave to Intervene
11/29/07 Notification of Docketing and Federal Register Notice
10/16/07 Acknowledgement of Receipt of Application and Federal Register Notice

To top of page

Requests for Additional Information

For all safety-related RAIs and the applicant's related responses eRAI Safety Report PDF Icon. Note that some RAIs and related responses may not be publicly available because they contain sensitive information.

The following table provides access to environmental RAIs and the applicant's subsequent responses.

RAI Date RAI Letter No. and Subject Applicant Response
05/19/08 RAI Letter Related To The Environmental Report 08/27/08
08/14/08
07/30/08
07/15/08
07/02/08
11/18/08 Second RAI Letter Related to the Environmental Report 01/22/09
12/18/08
04/22/09 Third RAI Letter Related to the Environmental Report 05/18/09

To top of page

Public Meetings

Date Description
07/23/08 Discussion of STPNOC's plans to submit revisions to COLA
02/05/08 Public Scoping Meeting
06/23/07 Public Outreach

To top of page

Contacts

Contacts for the South Texas Project COL Application
Safety Project Manager George Wunder
Environmental Project Manager Jessie M. Muir
Contact a Public Affairs Officer

To top of page



Privacy Policy | Site Disclaimer