Home > NRC Library > ADAMS Public Documents
South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2
Accession Number: ML082831273
Date Released: Wednesday, October 22, 2008
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML082830954 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Appendix A -Final Safety Analysis Report- Tier 1 - Legend for Figures - Appendix A- Pages 1-2 (2 page(s), 9/24/2008)
- ML082830955 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Appendix B -Final Safety Analysis Report- Tier 1 - Abbreviations and Acronyms Used in the ABWR - Appendix B- Pages 1-2 (2 page(s), 9/24/2008)
- ML082830956 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Appendix C- Final Safety Analysis Report- Tier 1 - Conversion to ASME Standard Units - Appendix C- Pages 1-2 (2 page(s), 9/24/2008)
- ML082830957 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 01 - Final Safety Analysis Report- Tier 1 - Introduction - Section 1.0 - Pages 1-2 (2 page(s), 9/24/2008)
- ML082830958 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 01 - Final Safety Analysis Report- Tier 1 - Definitions - Section 1.1 - Pages 1-2 (2 page(s), 9/24/2008)
- ML082830959 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 01 - Final Safety Analysis Report- Tier 1 - General Provisions - Section 1.2 - Pages 1-2 (2 page(s), 9/24/2008)
- ML082830961 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 02 - Final Safety Analysis Report- Tier 1 - Nuclear Steam Supply Systems - Section 2.1 - Pages 1-2 (2 page(s), 9/24/2008)
- ML082830962 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 02 - Final Safety Analysis Report- Tier 1 - Control and Instrument Systems - Section 2.2 - Pages 1-14 (14 page(s), 9/24/2008)
- ML082830963 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 02 - Final Safety Analysis Report- Tier 1 - Radiation Monitoring Systems - Section 2.3 - Pages 1-4 (4 page(s), 9/24/2008)
- ML082830964 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 02 - Final Safety Analysis Report- Tier 1 - Core Cooling Systems - Section 2.4 - Pages 1-14 (14 page(s), 9/24/2008)
- ML082830965 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 02 - Final Safety Analysis Report- Tier 1 - Reactor Servicing Equipment - Section 2.5 - Pages 1-2 (2 page(s), 9/24/2008)
- ML082830966 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 02 - Final Safety Analysis Report- Tier 1 - Reactor Auxiliary Systems - Section 2.6 - Pages 1-2 (2 page(s), 9/24/2008)
- ML082830967 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 02 - Final Safety Analysis Report- Tier 1 - Control Panels - Section 2.7 - Pages 1-8 (8 page(s), 9/24/2008)
- ML082830968 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 02 - Final Safety Analysis Report- Tier 1 - Nuclear Fuel - Section 2.8 - Pages 1-2 (2 page(s), 9/24/2008)
- ML082830969 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 02 - Final Safety Analysis Report- Tier 1 - Radioactive Waste System - Section 2.9- Pages 1-2 (2 page(s), 9/24/2008)
- ML082830970 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 02 - Final Safety Analysis Report- Tier 1 - Power Cycle Systems - Section 2.10- Pages 1-2 (2 page(s), 9/24/2008)
- ML082830971 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 02 - Final Safety Analysis Report- Tier 1 - Station Auxiliary Systems - Section 2.11- Pages 1-4 (4 page(s), 9/24/2008)
- ML082830972 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 02 - Final Safety Analysis Report- Tier 1 - Station Electrical Systems - Section 2.12- Pages 1-8 (8 page(s), 9/24/2008)
- ML082830973 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 02 - Final Safety Analysis Report- Tier 1 - Power Transmission - Section 2.13- Pages 1-2 (2 page(s), 9/24/2008)
- ML082830974 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 02 - Final Safety Analysis Report- Tier 1 - Containment and Environmental Control Systems - Section 2.14- Pages 1-6 (6 page(s), 9/24/2008)
- ML082830975 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 02 - Final Safety Analysis Report- Tier 1 - Structures and Servicing Systems - Section 2.15- Pages 1-6 (6 page(s), 9/24/2008)
- ML082830976 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 02 - Final Safety Analysis Report- Tier 1 - Yard Structures and Equipment - Section 2.16- Pages 1-2 (2 page(s), 9/24/2008)
- ML082830977 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 02 - Final Safety Analysis Report- Tier 1 - Emergency Response Facilities - Section 2.17- Pages 1-2 (2 page(s), 9/24/2008)
- ML082830978 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 03 - Final Safety Analysis Report- Tier 1 - Human Factors Engineering - Section 3.1- Pages 1-2 (2 page(s), 9/24/2008)
- ML082830979 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 03 - Final Safety Analysis Report- Tier 1 - Radiation Protection - Section 3.2- Pages 1-2 (2 page(s), 9/24/2008)
- ML082830980 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 03 - Final Safety Analysis Report- Tier 1 - Piping Design - Section 3.3- Pages 1-2 (2 page(s), 9/24/2008)
- ML082830981 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 03 - Final Safety Analysis Report- Tier 1 - Instrumentation and Control - Section 3.4- Pages 1-16 (16 page(s), 9/24/2008)
- ML082830982 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 03 - Final Safety Analysis Report- Tier 1 - Initial Test Program - Section 3.5- Pages 1-2 (2 page(s), 9/24/2008)
- ML082830983 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 03 - Final Safety Analysis Report- Tier 1 - Design Reliability Assurance Program - Section 3.6- Pages 1-2 (2 page(s), 9/24/2008)
- ML082830984 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 04 - Final Safety Analysis Report- Tier 1 - Interface Requirements - Section 4.0- Pages 1-2 (2 page(s), 9/24/2008)
- ML082830985 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 04 - Final Safety Analysis Report- Tier 1 - Ultimate Heat Sink - Section 4.1- Pages 1-2 (2 page(s), 9/24/2008)
- ML082830986 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 04 - Final Safety Analysis Report- Tier 1 - Offsite Power System - Section 4.2- Pages 1-2 (2 page(s), 9/24/2008)
- ML082830987 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 04 - Final Safety Analysis Report- Tier 1 - Makeup Water Preparation System - Section 4.3- Pages 1-2 (2 page(s), 9/24/2008)
- ML082830988 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 04 - Final Safety Analysis Report- Tier 1 - Potable and Sanitary Water System - Section 4.4- Pages 1-2 (2 page(s), 9/24/2008)
- ML082830989 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 04 - Final Safety Analysis Report- Tier 1 - Reactor Service Water System - Section 4.5- Pages 1-2 (2 page(s), 9/24/2008)
- ML082830990 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 04 - Final Safety Analysis Report- Tier 1 - Turbine Service Water System - Section 4.6- Pages 1-2 (2 page(s), 9/24/2008)
- ML082830991 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 04 - Final Safety Analysis Report- Tier 1 - Communication System - Section 4.7- Pages 1-2 (2 page(s), 9/24/2008)
- ML082830992 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 04 - Final Safety Analysis Report- Tier 1 - Site Security - Section 4.8- Pages 1-2 (2 page(s), 9/24/2008)
- ML082830993 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 04 - Final Safety Analysis Report- Tier 1 - Circulating Water System - Section 4.9- Pages 1-2 (2 page(s), 9/24/2008)
- ML082830994 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 04 - Final Safety Analysis Report- Tier 1 - Heating, Ventilating and Air Conditioning System - Section 4.10- Pages 1-2 (2 page(s), 9/24/2008)
- ML082830995 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 05 - Final Safety Analysis Report- Tier 1 - Site Parameters - Section 5.0- Pages 1-4 (4 page(s), 9/24/2008)
- ML082830996 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Table of Contents - Final Safety Analysis Report- Tier 1 - Table of Contents- Pages 1-2 (2 page(s), 9/24/2008)
- ML082830997 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 01 - Final Safety Analysis Report- Tier 2 - Response to TMI Related Matters- Section 1A- Pages 1-6 (6 page(s), 9/24/2008)
- ML082830998 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 01 - Final Safety Analysis Report- Tier 2 - Plant Shielding to Provide Access to Vital Areas- Section 1AA- Pages 1-4 (4 page(s), 9/24/2008)
- ML082830999 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 01 - Final Safety Analysis Report- Tier 2 - Not Used- Section 1B- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831000 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 01 - Final Safety Analysis Report- Tier 2 - ABWR Station Blackout Considerations- Section 1C- Pages 1-10 (10 page(s), 9/24/2008)
- ML082831001 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 01 - Final Safety Analysis Report- Tier 2 - Introduction - Section 1.1 - Pages 1-8 (8 page(s), 9/24/2008)
- ML082831002 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 01 - Final Safety Analysis Report- Tier 2 - General Plant Description- Section 1.2- Pages 1-16 (16 page(s), 9/24/2008)
- ML082831003 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 01 - Final Safety Analysis Report- Tier 2 - Comparison Tables- Section 1.3- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831004 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 01 - Final Safety Analysis Report- Tier 2 - Identification of Agents and Contractors- Section 1.4- Pages 1-4 (4 page(s), 9/24/2008)
- ML082831005 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 01 - Final Safety Analysis Report- Tier 2 - Requirements for Further Technical Information- Section 1.5- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831007 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 01 - Final Safety Analysis Report- Tier 2 - GE Topical Reports and Other Documents- Section 1.6- Pages 1-4 (4 page(s), 9/24/2008)
- ML082831008 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 01 - Final Safety Analysis Report- Tier 2 - Drawings- Section 1.7- Pages 1-4 (4 page(s), 9/24/2008)
- ML082831009 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 01 - Final Safety Analysis Report- Tier 2 - Conformance with Standard Review Plan- Section 1.8- Pages 1-6 (6 page(s), 9/24/2008)
- ML082831010 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 01 - Final Safety Analysis Report- Tier 2 - Site Parameters, Interface Requirements- Section 1.8S- Pages 1-4 (4 page(s), 9/24/2008)
- ML082831011 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 01 - Final Safety Analysis Report- Tier 2 - COL license Information- Section 1.9- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831012 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 01 - Final Safety Analysis Report- Tier 2 - Conformance with Regulatory Criteria- Section 1.9S- Pages 1-28 (28 page(s), 9/24/2008)
- ML082831013 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 01 - Final Safety Analysis Report- Tier 2 - Impacts of Construction- Section 1.10S- Pages 1-12 (12 page(s), 9/24/2008)
- ML082831014 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 02 - Final Safety Analysis Report- Tier 2 - Input to CRAC 2 Computer Code- Section 2A- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831015 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 02 - Final Safety Analysis Report- Tier 2 - Site Characteristics- Section 2.0- Pages 1-10 (10 page(s), 9/24/2008)
- ML082831016 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 02 - Final Safety Analysis Report- Tier 2 - Limits Imposed on SRP Section II Acceptance Criteria- Section 2.1- Pages 1-6 (6 page(s), 9/24/2008)
- ML082831017 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 02 - Final Safety Analysis Report- Tier 2 - Site Characteristics- Section 2.0S-2.1S Pages 1-38 (38 page(s), 9/24/2008)
- ML082831018 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 02 - Final Safety Analysis Report- Tier 2 - Requirements for Determination of ABWR Site Acceptability- Section 2.2- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831019 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 02 - Final Safety Analysis Report- Tier 2 - Nearby Industrial, Transportation, and Military Facilities- Section 2.2S- Pages 1-66 (66 page(s), 9/24/2008)
- ML082831020 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 02 - Final Safety Analysis Report- Tier 2 - COL License Information- Section 2.3- Pages 1-8 (8 page(s), 9/24/2008)
- ML082831021 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 02 - Final Safety Analysis Report- Tier 2 - Meteorology- Section 2.3S- Pages 1-158 (158 page(s), 9/24/2008)
- ML082831022 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 02 - Final Safety Analysis Report- Tier 2 - Hydrologic Description- Section 2.4S.1- Pages 1-30 (30 page(s), 9/24/2008)
- ML082831023 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 02 - Final Safety Analysis Report- Tier 2 - Floods- Section- 2.4S.2- Pages 1-28 (28 page(s), 9/24/2008)
- ML082831024 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 02 - Final Safety Analysis Report- Tier 2 - Probable Maximum Flood (PMF) on Streams and Rivers- Section- 2.4S.3- Pages 1-44 (44 page(s), 9/24/2008)
- ML082831025 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 02 - Final Safety Analysis Report- Tier 2 - Potential Dam Failures- Section 2.4S.4- Pages 1-44 (44 page(s), 9/24/2008)
- ML082831026 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 02 - Final Safety Analysis Report- Tier 2 - Probable Maximum Surge and Seiche Flooding- Section 2.4S.5- Pages 1-18 (18 page(s), 9/24/2008)
- ML082831027 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 02 - Final Safety Analysis Report- Tier 2 - Probable Maximum Tsunami- Section 2.4S.6- Pages 1-16 (16 page(s), 9/24/2008)
- ML082831028 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 02 - Final Safety Analysis Report- Tier 2 - Ice Effects- Section 2.4S.7- Pages 1-8 (8 page(s), 9/24/2008)
- ML082831029 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 02 - Final Safety Analysis Report- Tier 2 - Cooling Water Canals and Reservoirs- Section 2.4S.8- Pages 1-10 (10 page(s), 9/24/2008)
- ML082831030 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 02 - Final Safety Analysis Report- Tier 2 - Channel Diversions- Section 2.4S.9- Pages 1-18 (18 page(s), 9/24/2008)
- ML082831031 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 02 - Final Safety Analysis Report- Tier 2 - Flooding Protection Requirements- Section 2.4S.10- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831032 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 02 - Final Safety Analysis Report- Tier 2 - Low Water Considerations- Section 2.4S.11- Pages 1-10 (10 page(s), 9/24/2008)
- ML082831033 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 02 - Final Safety Analysis Report- Tier 2 - Groundwater- Section 2.4S.12- Pages 1-80 (80 page(s), 9/24/2008)
- ML082831034 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 02 - Final Safety Analysis Report- Tier 2 - Accidental Releases of Radioactive Liquid- Section 2.4S.13- Pages 1-24 (24 page(s), 9/24/2008)
- ML082831035 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 02 - Final Safety Analysis Report- Tier 2 - Technical Specifications- Section 2.4S.14- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831036 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 02 - Final Safety Analysis Report- Tier 2 - Geology, Seismology, and Geotechnical Engineering- Section 2.5S- Pages 1-4 (4 page(s), 9/24/2008)
- ML082831037 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 02 - Final Safety Analysis Report- Tier 2 - Basic Geologic and Seismic Information - Section 2.5S.1- Pages 1-86 (86 page(s), 9/24/2008)
- ML082831039 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 02 - Final Safety Analysis Report- Tier 2 - Basic Geologic and Seismic Information - Section B- Pages 1-9 (9 page(s), 9/24/2008)
- ML082831041 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 02 - Final Safety Analysis Report- Tier 2 - Basic Geologic and Seismic Information - Section C- Pages 1-9 (9 page(s), 9/24/2008)
- ML082831042 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 02 - Final Safety Analysis Report- Tier 2 - Basic Geologic and Seismic Information - Section D- Pages 1-9 (9 page(s), 9/24/2008)
- ML082831043 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 02 - Final Safety Analysis Report- Tier 2 - Basic Geologic and Seismic Information - Section E- Pages 1-9 (9 page(s), 9/24/2008)
- ML082831044 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 02 - Final Safety Analysis Report- Tier 2 - Basic Geologic and Seismic Information - Section F- Pages 1-4 (4 page(s), 9/24/2008)
- ML082831045 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 02 - Final Safety Analysis Report- Tier 2 - Basic Geologic and Seismic Information - Section G- Pages 1-5 (5 page(s), 9/24/2008)
- ML082831046 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 02 - Final Safety Analysis Report- Tier 2 - Basic Geologic and Seismic Information - Section H- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831047 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 02 - Final Safety Analysis Report- Tier 2 - Vibratory Ground Motion- Section 2.5S.2- Pages 1-126 (126 page(s), 9/24/2008)
- ML082831048 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 02 - Final Safety Analysis Report- Tier 2 - Surface Faulting- Section 2.5S.3- Pages 1-12 (12 page(s), 9/24/2008)
- ML082831049 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 02 - Final Safety Analysis Report- Tier 2 - Stability of Subsurface Materials and Foundations- Section 2.5S.4- Pages 1-290 (290 page(s), 9/24/2008)
- ML082831050 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 02 - Final Safety Analysis Report- Tier 2 - Stability of Slopes- Section 2.5S.5- Pages 1-6 (6 page(s), 9/24/2008)
- ML082831051 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 03 - Final Safety Analysis Report- Tier 2 - Seismic Soil Structure Interaction Analysis- Section 3A- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831052 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 03 - Final Safety Analysis Report- Tier 2 - Containment Hydrodynamic Loads- Section 3B- Pages 1-38 (38 page(s), 9/24/2008)
- ML082831053 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 03 - Final Safety Analysis Report- Tier 2 - Computer Programs Used- Section 3C- Pages 1-4 (4 page(s), 9/24/2008)
- ML082831054 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 03 - Final Safety Analysis Report- Tier 2 - Computer Programs Used in the Design of Components- Section 3D- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831055 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 03 - Final Safety Analysis Report- Tier 2 - Guidelines for LBB Application- Section 3E- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831056 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 03 - Final Safety Analysis Report- Tier 2 - Not Used- Section 3F- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831057 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 03 - Final Safety Analysis Report- Tier 2 - Response of Structures to Containment Loads- Section 3G- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831058 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 03 - Final Safety Analysis Report- Tier 2 - Details and Evaluation Results of Seismic Category 1 Structures- Section 3H- Pages 1-24 (24 page(s), 9/24/2008)
- ML082831059 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 03 - Final Safety Analysis Report- Tier 2 - Equipment Qualification Environmental Design Criteria- Section 3I- Pages 1-6 (6 page(s), 9/24/2008)
- ML082831060 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 03 - Final Safety Analysis Report- Tier 2 - Not Used- Section 3J- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831061 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 03 - Final Safety Analysis Report- Tier 2 - Designated NEDE-24326-1-P Material Which May Not Change- Section 3K- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831062 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 03 - Final Safety Analysis Report- Tier 2 - Evaluation of Postulated Ruptures in High Energy Pipes- Section 3L- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831063 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 03 - Final Safety Analysis Report- Tier 2 - Resolution of Intersystem Loss of Coolant Accident For ABWR- Section 3M- Pages 1-4 (4 page(s), 9/24/2008)
- ML082831064 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 03 - Final Safety Analysis Report- Tier 2 - System Evaluation for ISLOCA- Section 3MA- Pages 1-24 (24 page(s), 9/24/2008)
- ML082831065 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 03 - Final Safety Analysis Report- Tier 2 - Conformance with NRC General Design Criteria- Section 3.1- Pages 1-4 (4 page(s), 9/24/2008)
- ML082831066 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 03 - Final Safety Analysis Report- Tier 2 - Classification of Structures, Components, and Systems- Section 3.2- Pages 1-6 (6 page(s), 9/24/2008)
- ML082831067 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 03 - Final Safety Analysis Report- Tier 2 - Wind and Tornado Loadings- Section 3.3- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831068 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 03 - Final Safety Analysis Report- Tier 2 - Water Level (Flood) Design- Section 3.4- Pages 1-6 (6 page(s), 9/24/2008)
- ML082831069 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 03 - Final Safety Analysis Report- Tier 2 - Missile Protection- Section 3.5- Pages 1-6 (6 page(s), 9/24/2008)
- ML082831070 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 03 - Final Safety Analysis Report- Tier 2 - Protection Against Dynamic Effects- Section 3.6- Pages 1-4 (4 page(s), 9/24/2008)
- ML082831071 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 03 - Final Safety Analysis Report- Tier 2 - Seismic Design- Section 3.7- Pages 1-10 (10 page(s), 9/24/2008)
- ML082831072 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 03 - Final Safety Analysis Report- Tier 2 - Seismic Category I Structures- Section 3.8- Pages 1-4 (4 page(s), 9/24/2008)
- ML082831073 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 03 - Final Safety Analysis Report- Tier 2 - Mechanical Systems and Components- Section 3.9- Pages 1-16 (16 page(s), 9/24/2008)
- ML082831074 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 03 - Final Safety Analysis Report- Tier 2 - Seismic and Dynamic Qualification of Equipment- Section 3.10- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831075 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 03 - Final Safety Analysis Report- Tier 2 - Environmental Qualification of Safety-Related Equipment- Section 3.11- Pages 1-4 (4 page(s), 9/24/2008)
- ML082831076 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 03 - Final Safety Analysis Report- Tier 2 - Tunnels- Section 3.12- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831077 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 03 - Final Safety Analysis Report- Tier 2 - Piping Design Review- Section 3.12S- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831078 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 03 - Final Safety Analysis Report- Tier 2 - Secondary Containment and Divisional Separation Zones- Section 3.13- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831079 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 03 - Final Safety Analysis Report- Tier 2 - Threaded Fasteners - ASME Code Class 1, 2, and 3- Section 3.13S- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831081 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 04 - Final Safety Analysis Report- Tier 2 - Typical Control Rod Patterns for ABWR- Section 4A- Pages 1-28 (28 page(s), 9/24/2008)
- ML082831082 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 04 - Final Safety Analysis Report- Tier 2 - Fuel Licensing Acceptance Criteria- Section 4B- Pages 1-12 (12 page(s), 9/24/2008)
- ML082831083 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 04 - Final Safety Analysis Report- Tier 2 - Control Rod Licensing Acceptance Criteria- Section 4C- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831084 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 04 - Final Safety Analysis Report- Tier 2 - Reference Fuel Design Compliance with Acceptance Criteria- Section 4D- Pages 1-12 (12 page(s), 9/24/2008)
- ML082831085 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 04 - Final Safety Analysis Report- Tier 2 - Reactor- Section 4.0-4.1- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831086 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 04 - Final Safety Analysis Report- Tier 2 - Fuel System Design- Section 4.2- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831087 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 04 - Final Safety Analysis Report- Tier 2 - Nuclear Design- Section 4.3- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831088 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 04 - Final Safety Analysis Report- Tier 2 - Thermal-Hydraulic Design- Section 4.4- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831089 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 04 - Final Safety Analysis Report- Tier 2 - Reactor Materials- Section 4.5- Pages 1-12 (12 page(s), 9/24/2008)
- ML082831090 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 04 - Final Safety Analysis Report- Tier 2 - Functional Design of Reactivity Control System- Section 4.6- Pages 1-4 (4 page(s), 9/24/2008)
- ML082831091 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 05 - Final Safety Analysis Report- Tier 2 - Method of Compliance For Regulatory Guide 1.150- Section 5A- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831092 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 05 - Final Safety Analysis Report- Tier 2 - RHR Injection Flow And Heat Capacity Analysis Outlines- Section 5B- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831093 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 05 - Final Safety Analysis Report- Tier 2 - Reactor Coolant System and Connection Systems- Section 5.0-5.1 Pages 1-2 (2 page(s), 9/24/2008)
- ML082831094 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 05 - Final Safety Analysis Report- Tier 2 - Integrity of Reactor Coolant Pressure Boundary- Section 5.2- Pages 1-22 (22 page(s), 9/24/2008)
- ML082831095 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 05 - Final Safety Analysis Report- Tier 2 - Reactor Vessel- Section 5.3- Pages 1-6 (6 page(s), 9/24/2008)
- ML082831096 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 05 - Final Safety Analysis Report- Tier 2 - Components and Subsystem Design- Section 5.4- Pages 1-18 (18 page(s), 9/24/2008)
- ML082831097 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 06 - Final Safety Analysis Report- Tier 2 - Regulatory Guide 1.52, Section C, Compliance Assessment- Section 6A- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831098 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 06 - Final Safety Analysis Report- Tier 2 - SRP 6.5.1, Table 6.5.1-1 Compliance Assessment- Section 6B- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831099 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 06 - Final Safety Analysis Report- Tier 2 - Containment Debris Protection for ECCS Strainers- Section 6C- Pages 1-10 (10 page(s), 9/24/2008)
- ML082831100 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 06 - Final Safety Analysis Report- Tier 2 - HPCF Analysis Outlines- Section 6D- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831101 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 06 - Final Safety Analysis Report- Tier 2 - Additional Bypass Leakage Considerations- Section 6E- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831102 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 06 - Final Safety Analysis Report- Tier 2 - Engineered Safety Features- Section 6.0- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831103 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 06 - Final Safety Analysis Report- Tier 2 - Engineered Safety Feature Materials- Section 6.1- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831104 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 06 - Final Safety Analysis Report- Tier 2 - Containment Systems- Section 6.2- Pages 1-70 (70 page(s), 9/24/2008)
- ML082831105 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 06 - Final Safety Analysis Report- Tier 2 - Emergency Core Cooling Systems- Section 6.3- Pages 1-44 (44 page(s), 9/24/2008)
- ML082831106 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 06 - Final Safety Analysis Report- Tier 2 - Habitability Systems- Section 6.4- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831107 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 06 - Final Safety Analysis Report- Tier 2 - Fission Products Removal and Control Systems- Section 6.5- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831108 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 06 - Final Safety Analysis Report- Tier 2 - Preservice and Inservice Inspection- Section 6.6- Pages 1-8 (8 page(s), 9/24/2008)
- ML082831109 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 06 - Final Safety Analysis Report- Tier 2 - High Pressure Nitrogen Gas Supply System- Section 6.7- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831110 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 07 - Final Safety Analysis Report- Tier 2 - Design Response to Appendix B- Section 7A- Pages 1-22 (22 page(s), 9/24/2008)
- ML082831111 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 07 - Final Safety Analysis Report- Tier 2 - Implementation Requirements for Hardware-Software Development- Section 7B- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831112 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 07 - Final Safety Analysis Report- Tier 2 - Defense Against Common-Mode Failure- Section 7C- Pages 1-4 (4 page(s), 9/24/2008)
- ML082831113 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 07 - Final Safety Analysis Report- Tier 2 - Instrumentation and Control Systems- Section 7.0-7.1- Pages 1-18 (18 page(s), 9/24/2008)
- ML082831114 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 07 - Final Safety Analysis Report- Tier 2 - Reactor Protection (Trip) System (RPS)- Section 7.2- Pages 1-20 (20 page(s), 9/24/2008)
- ML082831115 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 07 - Final Safety Analysis Report- Tier 2 - Engineered Safety Feature Systems, Instrumentation and Control- Section 7.3- Pages 1-40 (40 page(s), 9/24/2008)
- ML082831116 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 07 - Final Safety Analysis Report- Tier 2 - Systems Required for Safe Shutdown- Section 7.4- Pages 1-10 (10 page(s), 9/24/2008)
- ML082831117 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 07 - Final Safety Analysis Report- Tier 2 - Information Systems Important to Safety- Section 7.5- Pages 1-10 (10 page(s), 9/24/2008)
- ML082831118 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 07 - Final Safety Analysis Report- Tier 2 - All Other Instrumentation Systems Required for Safety- Section 7.6- Pages 1-18 (18 page(s), 9/24/2008)
- ML082831119 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 07 - Final Safety Analysis Report- Tier 2 - Interlock Systems Important to Safety- Section 7.6S- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831120 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 07 - Final Safety Analysis Report- Tier 2 - Control Systems Not Required for Safety- Section 7.7- Pages 1-66 (66 page(s), 9/24/2008)
- ML082831121 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 07 - Final Safety Analysis Report- Tier 2 - COL License Information- Section 7.8- Pages 1-4 (4 page(s), 9/24/2008)
- ML082831122 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 07 - Final Safety Analysis Report- Tier 2 - Diverse Instrumentation and Control Systems- Section 7.8S- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831123 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 07 - Final Safety Analysis Report- Tier 2 - Data Communication Systems- Section 7.9S- Pages 1-12 (12 page(s), 9/24/2008)
- ML082831124 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 08 - Final Safety Analysis Report- Tier 2 - Miscellaneous Electrical Systems- Section 8A- Pages 1-4 (4 page(s), 9/24/2008)
- ML082831125 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 08 - Final Safety Analysis Report- Tier 2 - Electric Power- Section 8.0-8.1 Pages 1-8 (8 page(s), 9/24/2008)
- ML082831126 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 08 - Final Safety Analysis Report- Tier 2 - Offsite Power Systems- Section 8.2- Pages 1-26 (26 page(s), 9/24/2008)
- ML082831127 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 08 - Final Safety Analysis Report- Tier 2 - Onsite Power Systems- Section 8.3- Pages 1-26 (26 page(s), 9/24/2008)
- ML082831129 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 08 - Final Safety Analysis Report- Tier 2 - Station Blackout- Section 8.4S- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831130 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 09 - Final Safety Analysis Report- Tier 2 - Fire Hazards Analysis- Section 9A- Pages 1-156 (156 page(s), 9/24/2008)
- ML082831131 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 09 - Final Safety Analysis Report- Tier 2 - Summary of Analysis Supporting Fire Protection- Section 9B- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831132 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 09 - Final Safety Analysis Report- Tier 2 - Regulatory Guide 1.52, Section C, Compliance Assessment- Section 9C- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831133 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 09 - Final Safety Analysis Report- Tier 2 - SRP 6.5.1, Table 6.5.1-1 Compliance Assessment- Section 9D- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831134 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 09 - Final Safety Analysis Report- Tier 2 - Fire Related Administrative Controls- Section 9E- Pages 1-22 (22 page(s), 9/24/2008)
- ML082831135 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 09 - Final Safety Analysis Report- Tier 2 - Auxiliary Systems- Section 9.0-9.1 Pages 1-76 (76 page(s), 9/24/2008)
- ML082831136 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 09 - Final Safety Analysis Report- Tier 2 - Water Systems- Section 9.2- Pages 1-106 (106 page(s), 9/24/2008)
- ML082831137 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 09 - Final Safety Analysis Report- Tier 2 - Process Auxiliaries- Section 9.3- Pages 1-10 (10 page(s), 9/24/2008)
- ML082831138 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 09 - Final Safety Analysis Report- Tier 2 - Air Conditioning, Heating, Cooling and Ventilating Systems- Section 9.4- Pages 1-36 (36 page(s), 9/24/2008)
- ML082831139 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 09 - Final Safety Analysis Report- Tier 2 - Other Auxiliary Systems- Section 9.5- Pages 1-30 (30 page(s), 9/24/2008)
- ML082831140 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 10 - Final Safety Analysis Report- Tier 2 - Steam and Power Conversion System- Section 10.0-10.1 Pages 1-8 (8 page(s), 9/24/2008)
- ML082831141 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 10 - Final Safety Analysis Report- Tier 2 - Turbine Generator- Section 10.2- Pages 1-18 (18 page(s), 9/24/2008)
- ML082831142 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 10 - Final Safety Analysis Report- Tier 2 - Main Steam Supply System- Section 10.3- Pages 1-6 (6 page(s), 9/24/2008)
- ML082831143 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 10 - Final Safety Analysis Report- Tier 2 - Other Features of Steam and Power Conversion- Section 10.4- Pages 1-32 (32 page(s), 9/24/2008)
- ML082831144 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 11 - Final Safety Analysis Report- Tier 2 - Radioactive Waste Management- Additional Information- Section 11A- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831145 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 11 - Final Safety Analysis Report- Tier 2 - Radioactive Waste Management- Section 11.0-11.1 Pages 1-2 (2 page(s), 9/24/2008)
- ML082831146 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 11 - Final Safety Analysis Report- Tier 2 - Liquid Waste Management System- Section 11.2- Pages 1-28 (26 page(s), 9/24/2008)
- ML082831147 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 11 - Final Safety Analysis Report- Tier 2 - Gaseous Waste Management System- Section 11.3- Pages 1-16 (16 page(s), 9/24/2008)
- ML082831148 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 11 - Final Safety Analysis Report- Tier 2 - Solid Waste Management System- Section 11.4- Pages 1-18 (18 page(s), 9/24/2008)
- ML082831149 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 11 - Final Safety Analysis Report- Tier 2 - Process and Effluent Radiological Monitoring- Section 11.5- Pages 1-18 (18 page(s), 9/24/2008)
- ML082831150 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 11 - Final Safety Analysis Report- Tier 2 - Offsite Radiological Monitoring Program- Section 11.6- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831152 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 12 - Final Safety Analysis Report- Tier 2 - Appendix 12A Calculation of Airborne Radionuclides- Section 12A- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831153 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 12 - Final Safety Analysis Report- Tier 2 - Radiation Protection- Section 12.0-12.1 Pages 1-4 (4 page(s), 9/24/2008)
- ML082831154 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 12 - Final Safety Analysis Report- Tier 2 - Radiation Sources- Section 12.2- Pages 1-34 (34 page(s), 9/24/2008)
- ML082831155 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 12 - Final Safety Analysis Report- Tier 2 - Radiation Protection Design Features- Section 12.3- Pages 1-16 (16 page(s), 9/24/2008)
- ML082831156 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 12 - Final Safety Analysis Report- Tier 2 - Dose Assessment- Section 12.4- Pages 1-4 (4 page(s), 9/24/2008)
- ML082831157 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 12 - Final Safety Analysis Report- Tier 2 - Health Physics Program- Section 12.5- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831158 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 12 - Final Safety Analysis Report- Tier 2 - Operational Radiation Protection Program- Section 12.5S- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831159 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 13 - Final Safety Analysis Report- Tier 2 - Conduct of Operations- Section 13.0-13.1 Pages 1-22 (22 page(s), 9/24/2008)
- ML082831160 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 13 - Final Safety Analysis Report- Tier 2 - Training- Section 13.2- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831161 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 13 - Final Safety Analysis Report- Tier 2 - Emergency Planning- Section 13.3- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831162 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 13 - Final Safety Analysis Report- Tier 2 - Review and Audit- Section 13.4- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831163 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 13 - Final Safety Analysis Report- Tier 2 - Plant Procedures- Section 13.5- Pages 1-14 (14 page(s), 9/24/2008)
- ML082831164 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 13 - Final Safety Analysis Report- Tier 2 - Physical Security- Section 13.6- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831165 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 13 - Final Safety Analysis Report- Tier 2 - Fitness For Duty- Section 13.7- Pages 1-6 (6 page(s), 9/24/2008)
- ML082831166 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 13 - Final Safety Analysis Report- Tier 2 - Operational Program Implementation- Section 13.4S- Pages 1-6 (6 page(s), 9/24/2008)
- ML082831167 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 14 - Final Safety Analysis Report- Tier 2 - Initial Test Program- Section 14.0-14.1 Pages 1-2 (2 page(s), 9/24/2008)
- ML082831168 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 14 - Final Safety Analysis Report- Tier 2 - Specific Information to be Addressed- Section 14.1S- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831169 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 14 - Final Safety Analysis Report- Tier 2 - Specific Information to be Included in FSAR- Section 14.2- Pages 1-24 (24 page(s), 9/24/2008)
- ML082831170 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 14 - Final Safety Analysis Report- Tier 2 - Initial Plant Test Program- Section 14.2S- Pages 1-10 (10 page(s), 9/24/2008)
- ML082831172 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 14 - Final Safety Analysis Report- Tier 2 - Tier 1 Selection Criteria and Processes- Section 14.3- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831173 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 14 - Final Safety Analysis Report- Tier 2 - Inspections, Tests, Analyses and Acceptance Criteria (ITAAC)- Section 14.3S- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831174 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 14 - Final Safety Analysis Report- Tier 2 - Verification Programs- Section 14.0S- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831175 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 15 - Final Safety Analysis Report- Tier 2 - Plant Nuclear Safety Operational Analysis (NSOA)- Section 15A- Pages 1-24 (24 page(s), 9/24/2008)
- ML082831176 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 15 - Final Safety Analysis Report- Tier 2 - Failure Modes and Effects Analysis (FMEA)- Section 15B- Pages 1-4 (4 page(s), 9/24/2008)
- ML082831177 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 15 - Final Safety Analysis Report- Tier 2 - Not Used- Section 15C- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831178 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 15 - Final Safety Analysis Report- Tier 2 - Probability Analysis of Pressure Regulator Downscale Failure- Section 15D- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831179 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 15 - Final Safety Analysis Report- Tier 2 - ATWS Performance Evaluation- Section 15E- Pages 1-4 (4 page(s), 9/24/2008)
- ML082831181 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 15 - Final Safety Analysis Report- Tier 2 - LOCA Inventory Curves- Section 15F- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831182 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 15 - Final Safety Analysis Report- Tier 2 - Accident and Analyses- Section 15.0- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831183 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 15 - Final Safety Analysis Report- Tier 2 - Decrease in Reactor Coolant Temperature- Section 15.1- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831184 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 15 - Final Safety Analysis Report- Tier 2 - Transient and Accident Classification- Section 15.1S- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831185 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 15 - Final Safety Analysis Report- Tier 2 - Increase in Reactor Pressure- Section 15.2- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831186 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 15 - Final Safety Analysis Report- Tier 2 - Decrease in Reactor Coolant System Flow Rate- Section 15.3- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831187 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 15 - Final Safety Analysis Report- Tier 2 - Reactivity and Power Distribution Anomalies- Section 15.4- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831188 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 15 - Final Safety Analysis Report- Tier 2 - Increase in Reactor Coolant Inventory- Section 15.5- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831189 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 15 - Final Safety Analysis Report- Tier 2 - Decrease in Reactor Coolant Inventory- Section 15.6- Pages 1-4 (4 page(s), 9/24/2008)
- ML082831191 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 15 - Final Safety Analysis Report- Tier 2 - Radioactive Release from Subsystems and Components- Section 15.7- Pages 1-4 (4 page(s), 9/24/2008)
- ML082831192 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 15 - Final Safety Analysis Report- Tier 2 - Anticipated Transients Without Scram- Section 15.8- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831193 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 16 - Final Safety Analysis Report- Tier 2 - Technical Specifications- Section 16.0- Pages 1-8 (8 page(s), 9/24/2008)
- ML082831194 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 16 - Final Safety Analysis Report- Tier 2 - Use and Application- Section 1.0- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831195 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 16 - Final Safety Analysis Report- Tier 2 - Safety Limits (SLs)- Section 2.0- Pages 1-8 (8 page(s), 9/24/2008)
- ML082831196 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 16 - Final Safety Analysis Report- Tier 2 - Limiting Condition for Operation (LCO) Applicability- Section 3.0- Pages 1-509 (509 page(s), 9/24/2008)
- ML082831197 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 16 - Final Safety Analysis Report- Tier 2 - Design Features- Section 4.0- Pages 1-4 (4 page(s), 9/24/2008)
- ML082831198 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 16 - Final Safety Analysis Report- Tier 2 - Administrative Controls- Section 5.0- Pages 1-18 (18 page(s), 9/24/2008)
- ML082831199 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 17 - Final Safety Analysis Report- Tier 2 - Quality Assurance- Section 17.0- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831200 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 17 - Final Safety Analysis Report- Tier 2 - Quality Assurance During Design and Construction- Section 17.1- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831201 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 17 - Final Safety Analysis Report- Tier 2 - Quality Assurance During the Operations Phase- Section 17.2- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831202 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 17 - Final Safety Analysis Report- Tier 2 - Reliability Assurance Program During Design Phase- Section 17.3- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831203 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 17 - Final Safety Analysis Report- Tier 2 - Reliability Assurance Program- Section 17.4S- Pages 1-16 (16 page(s), 9/24/2008)
- ML082831204 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 17 - Final Safety Analysis Report- Tier 2 - Quality Assurance Program Guidance- Section 17.5S- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831205 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 17 - Final Safety Analysis Report- Tier 2 - Maintenance Rule Program- Section 17.6S- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831206 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 18 - Final Safety Analysis Report- Tier 2 - Emergency Procedure Guidelines- Section 18A- Pages 1-4 (4 page(s), 9/24/2008)
- ML082831207 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 18 - Final Safety Analysis Report- Tier 2 - Differences Between BWROG EPG Revision 4 and ABWR EPG- Section 18B- Pages 1-4 (4 page(s), 9/24/2008)
- ML082831208 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 18 - Final Safety Analysis Report- Tier 2 - Operator Interface Equipment Characterization- Section 18C- Pages 1-4 (4 page(s), 9/24/2008)
- ML082831209 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 18 - Final Safety Analysis Report- Tier 2 - Emergency Procedures Guidelines- Section 18D- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831210 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 18 - Final Safety Analysis Report- Tier 2 - ABWR Human-System Interface Design Implementation Process- Section 18E- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831211 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 18 - Final Safety Analysis Report- Tier 2 - Emergency Operation Information and Controls- Section 18F- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831212 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 18 - Final Safety Analysis Report- Tier 2 - Design Development and Validation Testing- Section 18G- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831213 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 18 - Final Safety Analysis Report- Tier 2 - Supporting Analysis for Emergency Operation Information- Section 18H- Pages 1-296 (296 page(s), 9/24/2008)
- ML082831214 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 18 - Final Safety Analysis Report- Tier 2 - Human Factors Engineering- Section 18.0-18.1 Pages 1-2 (2 page(s), 9/24/2008)
- ML082831215 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 18 - Final Safety Analysis Report- Tier 2 - Design Goals and Design Bases- Section 18.2- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831216 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 18 - Final Safety Analysis Report- Tier 2 - Planning, Development, and Design- Section 18.3- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831217 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 18 - Final Safety Analysis Report- Tier 2 - Control Room Standard Design Features- Section 18.4- Pages 1-4 (4 page(s), 9/24/2008)
- ML082831218 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 18 - Final Safety Analysis Report- Tier 2 - Remote Shutdown System- Section 18.5- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831219 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 18 - Final Safety Analysis Report- Tier 2 - Systems Integration- Section 18.6- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831220 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 18 - Final Safety Analysis Report- Tier 2 - Detailed Design of the Operator Interface System- Section 18.7- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831221 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 18 - Final Safety Analysis Report- Tier 2 - COL License Information- Section 18.8- Pages 1-6 (6 page(s), 9/24/2008)
- ML082831222 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 19 - Final Safety Analysis Report- Tier 2 - Response to CP-ML Rule 10 Cfr 50.34(f)- Section 19A- Pages 1-6 (6 page(s), 9/24/2008)
- ML082831223 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 19 - Final Safety Analysis Report- Tier 2 - Resolution of Applicable Unresolved Safety Issues- Section 19B- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831224 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 19 - Final Safety Analysis Report- Tier 2 - Design Considerations Reducing Sabotage Risk- Section 19C- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831225 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 19 - Final Safety Analysis Report- Tier 2 - Probabilistic Evaluations- Section 19D- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831226 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 19 - Final Safety Analysis Report- Tier 2 - Deterministic Evaluations- Section 19E- Pages 1-20 (20 page(s), 9/24/2008)
- ML082831227 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 19 - Final Safety Analysis Report- Tier 2 - Direct Containment Heating- Section 19EA- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831228 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 19 - Final Safety Analysis Report- Tier 2 - Fuel Coolant Interactions- Section 19EB- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831229 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 19 - Final Safety Analysis Report- Tier 2 - Debris Coolability and Core Concrete Interaction- Section 19EC- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831230 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 19 - Final Safety Analysis Report- Tier 2 - Corium Shield- Section 19ED- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831231 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 19 - Final Safety Analysis Report- Tier 2 - Suppression Pool Bypass- Section 19EE- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831232 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 19 - Final Safety Analysis Report- Tier 2 - Containment Ultimate Strength- Section 19F- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831233 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 19 - Final Safety Analysis Report- Tier 2 - Containment Ultimate Strength- Section 19FA- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831234 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 19 - Final Safety Analysis Report- Tier 2 - Not Used- Section 19G- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831235 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 19 - Final Safety Analysis Report- Tier 2 - Seismic Capacity Analysis- Section 19H- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831236 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 19 - Final Safety Analysis Report- Tier 2 - Seismic Margins Analysis- Section 19I- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831237 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 19 - Final Safety Analysis Report- Tier 2 - Not Used- Section 19J- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831238 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 19 - Final Safety Analysis Report- Tier 2 - PRA-Based Reliability and Maintenance- Section 19K- Pages 1-14 (14 page(s), 9/24/2008)
- ML082831239 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 19 - Final Safety Analysis Report- Tier 2 - ABWR Shutdown Risk Evaluation- Section 19L- Pages 1-6 (6 page(s), 9/24/2008)
- ML082831240 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 19 - Final Safety Analysis Report- Tier 2 - Fire Protection Probabilistic Risk Assessment- Section 19M- Pages 1-4 (4 page(s), 9/24/2008)
- ML082831241 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 19 - Final Safety Analysis Report- Tier 2 - Analysis of Common-Cause Failure- Section 19N- Pages 1-18 (18 page(s), 9/24/2008)
- ML082831242 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 19 - Final Safety Analysis Report- Tier 2 - Not Used- Section 19O- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831243 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 19 - Final Safety Analysis Report- Tier 2 - Evaluation of Potential Modifications to the ABWR Design- Section 19P- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831244 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 19 - Final Safety Analysis Report- Tier 2 - ABWR Shutdown Risk Assessment- Section 19Q- Pages 1-10 (10 page(s), 9/24/2008)
- ML082831245 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 19 - Final Safety Analysis Report- Tier 2 - Fault Trees- Section 19QA- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831246 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 19 - Final Safety Analysis Report- Tier 2 - DHR Reliability Study- Section 19QB- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831247 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 19 - Final Safety Analysis Report- Tier 2 - Review of Significant Events- Section 19QC- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831248 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 19 - Final Safety Analysis Report- Tier 2 - Probabilistic Flooding Analysis- Section 19R- Pages 1-32 (32 page(s), 9/24/2008)
- ML082831249 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 19 - Final Safety Analysis Report- Tier 2 - Response to Severe Accident Policy Statement- Section 19.0-19.1 Pages 1-2 (2 page(s), 9/24/2008)
- ML082831250 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 19 - Final Safety Analysis Report- Tier 2 - Additional Information to Support the COL Application- Section 19.1S- Pages 1-24 (24 page(s), 9/24/2008)
- ML082831251 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 19 - Final Safety Analysis Report- Tier 2 - Introduction- Section 19.2- Pages 1-38 (38 page(s), 9/24/2008)
- ML082831252 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 19 - Final Safety Analysis Report- Tier 2 - Internal Event Analysis- Section 19.3- Pages 1-6 (6 page(s), 9/24/2008)
- ML082831253 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 19 - Final Safety Analysis Report- Tier 2 - External Event Analysis and Shutdown Risk Analysis- Section 19.4- Pages 1-4 (4 page(s), 9/24/2008)
- ML082831254 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 19 - Final Safety Analysis Report- Tier 2 - PRA Maintenance- Section 19.4S- Pages 1-4 (4 page(s), 9/24/2008)
- ML082831256 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 19 - Final Safety Analysis Report- Tier 2 - Source Term Sensitivity Studies- Section 19.5- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831257 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 19 - Final Safety Analysis Report- Tier 2 - Measurement Against Goals- Section 19.6- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831258 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 19 - Final Safety Analysis Report- Tier 2 - PRA as a Design Tool- Section 19.7- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831259 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 19 - Final Safety Analysis Report- Tier 2 - Important Features Identified by the ABWR PRA- Section 19.8- Pages 1-4 (4 page(s), 9/24/2008)
- ML082831260 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 19 - Final Safety Analysis Report- Tier 2 - COL License Information- Section 19.9- Pages 1-14 (14 page(s), 9/24/2008)
- ML082831261 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 19 - Final Safety Analysis Report- Tier 2 - Assumptions and Insights- Section 19.10- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831262 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 19 - Final Safety Analysis Report- Tier 2 - Human Action Overview- Section 19.11- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831263 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 19 - Final Safety Analysis Report- Tier 2 - Input to the Reliability Assurance Program- Section 19.12- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831264 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 19 - Final Safety Analysis Report- Tier 2 - Summary of Insights Gained from the PRA- Section 19.13- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831265 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 20 - Final Safety Analysis Report- Tier 2 - Not Used- Section 20- Pages 1-2 (2 page(s), 9/24/2008)
- ML082831266 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 21 - Final Safety Analysis Report- Tier 2 - Large-Scale Drawings - Section 21.0- Pages 1-26 (26 page(s), 9/24/2008)
- ML082831267 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 21 - Final Safety Analysis Report- Tier 2 - Large-Scale Drawings- Pages 1-85 (85 page(s), 9/24/2008)
- ML082831268 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 21 - Final Safety Analysis Report- Tier 2 - Large-Scale Drawings- Pages 1-106 (106 page(s), 9/24/2008)
- ML082831269 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 21 - Final Safety Analysis Report- Tier 2 - Large-Scale Drawings- Pages 1-92 (92 page(s), 9/24/2008)
- ML082831270 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 21 - Final Safety Analysis Report- Tier 2 - Large-Scale Drawings- Pages 1-51 (51 page(s), 9/24/2008)
- ML082831271 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Chapter 21 - Final Safety Analysis Report- Tier 2 - Large-Scale Drawings- Pages 1-131 (131 page(s), 9/24/2008)
- ML082831272 - South Texas Project Units 3 & 4 COLA (FSAR), Rev. 2 - Part 02 - Final Safety Analysis Report- Tier 2 - Table of Contents- Pages 1-8 (8 page(s), 9/24/2008)