Home > NRC Library > ADAMS Public Documents
Inspection Manual Change Notice 26-016
Accession Number: ML26113A387
Date Released: Thursday, April 30, 2026
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML26113A388 - Inspection Manual Change Notice 26-016 (4/30/2026)
- ML26113A389 - Table of Contents for Inspection Manual Change Notice 26-016 (4/30/2026)
- ML26099A307 - IMC 0308 Attachment 3, Appendix I, Technical Basis for Licensed Operator Requalification and Simulator Significance Determination Process (4/30/2026)
- ML26084A614 - IMC 0308 Attachment 03, Appendix J, Technical Basis for Steam Generator Tube Integrity Findings (4/30/2026)
- ML26092A331 - IMC 0308 Attachment 3, Appendix K, Technical Basis for Maintenance Risk Assessment and Risk Management Significance Determination Process (4/30/2026)
- ML26040A189 - IMC 0308 Attachment 03, Appendix L, Tech Basis for Extensv Damage Mit Guidelines SDP (4/30/2026)
- ML26084A619 - IMC 0327 Steam Generator Tube Primary-to-Secondary Leakage (4/30/2026)
- ML26110A265 - IMC 0609 Appendix G Attachment 1, Shutdown Operations Significance Determination Process Phase 1 Initial Screening and Characterization of Performance Deficiencies (4/30/2026)
- ML26099A306 - IMC 0609 Appendix I, Licensed Operator Requalification and Simulator Significance Determination Process (4/30/2026)
- ML26084A623 - IMC 0609 Appendix J, Steam Generator Tube Integrity Findings Significance Determination Process (4/30/2026)
- ML26092A377 - IMC 0609 Appendix K, Maintenance Risk Assessment and Risk Management Significance Determination Process (4/30/2026)
- ML26040A232 - IMC 0609 Appendix L, Extensive Damage Mitigation Guidelines Significance Determination Process (4/30/2026)
- ML26104A368 - IMC 0609 Appendix M, Significance Determination Process Using Qualitative Criteria (4/30/2026)