Home > NRC Library > ADAMS Public Documents
L3PRA Project Volume 5 FRN and Public Comments and Responses
Accession Number: ML26103A167
Date Released: Wednesday, July 1, 2026
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML25203A112 - FRN: General Notice Level 3 Probabilistic Risk Assessment Project Documentation (Volume 5) (8/28/2025)
- ML25157A084 - U.S. NRC Level 3 Probabilistic Risk Assessment Project, Volume 5: Overview of Reactor, Low-Power and Shutdown, Level 1, 2, and 3 PRAs for Internal Events (Draft for Public Review) (6/6/2025)
- ML25157A085 - U.S. NRC Level 3 Probabilistic Risk Assessment Project, Volume 5a: Reactor, At-Shutdown, Level 1 PRA for Internal Events (Draft for Public Review) (6/6/2025)
- ML25157A086 - U.S. NRC Level 3 Probabilistic Risk Assessment Project, Volume 5b: Reactor, At-Shutdown, Level 2 PRA for Internal Events (Draft for Public Review) (6/6/2025)
- ML25157A087 - U.S. NRC Level 3 Probabilistic Risk Assessment Project, Volume 5c: Reactor, At-Shutdown, Level 3 PRA for Internal Events (Draft for Public Review) (6/6/2025)
- ML25318A134 - Comment (1) of Mark Shaver on Level 3 Probabilistic Risk Assessment Project Documentation (Volume 5) (10/29/2025)
- ML25318A135 - Comment (2) of Nuclear Energy Institute on Level 3 Probabilistic Risk Assessment Project Documentation (Volume 5) (10/31/2025)
- ML26180A290 - Response to Public Comments on Vol.5_rev3. (6/7/2026)