Home > NRC Library > ADAMS Public Documents
Crystal River, Unit 3, Revision to License Termination Plan
Accession Number: ML25345A212
Date Released: Monday, December 15, 2025
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML25345A213 - Crystal River, Unit 3, Revision to License Termination Plan (12/11/2025)
- ML25345A215 - Crystal River, Unit 3, Revision to License Termination Plan (12/11/2025)
- ML25345A216 - Crystal River, Unit 3, Technical Support Document, Guideline for Embedded and Buried Pipe Detector Calibration and Usage, Revision 4 (12/11/2025)
- ML25345A217 - Crystal River, Unit 3, 72CHAR-01 Impacted Open Land Survey Areas, Rev. 4 (12/11/2025)