Home > NRC Library > ADAMS Public Documents
Susquehanna, Units 1 and 2 - Submittal of Revision 72 to Updated Final Safety Analysis Report and Revision 26 to Fire Protection Review Report
Accession Number: ML25290A004
Date Released: Wednesday, February 4, 2026
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML25290A005 - Susquehanna, Units 1 and 2 - Submittal of Revision 72 to Updated Final Safety Analysis Report and Revision 26 to Fire Protection Review Report (10/13/2025)
- ML25290A014 - Susquehanna, Units 1 and 2 - Fire Protection Review Report, Rev. 26 (10/13/2025)
- ML25290A015 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, List of Effective Pages (10/13/2025)
- ML25290A016 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Table of Contents (10/13/2025)
- ML25290A013 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 1, Section 1.1, Introduction (10/13/2025)
- ML25290A009 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 1, Section 1.2, General Plant Description (10/13/2025)
- ML25290A012 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 1, Section 1.3, Comparison Tables (10/13/2025)
- ML25290A010 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 1, Section 1.4, Identification of Agents and Contractors (10/13/2025)
- ML25290A008 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 1, Section 1.5, Requirements for Furher Technical Information (10/13/2025)
- ML25290A006 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 1, Section 1.6, Material Incorporated by Reference (10/13/2025)
- ML25290A011 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 1, Section 1.7, Electrical, Instrumentation, and Control Drawings (10/13/2025)
- ML25290A007 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 1, Section 1.8, Symbols and Terms used in Engineering and Text (10/13/2025)
- ML25290A020 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 2, Section 2.1, Geography and Demography (10/13/2025)
- ML25290A019 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 2, Section 2.2, Nearby Industrial, Transportation, and Military Facilities (10/13/2025)
- ML25290A018 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 2, Section 2.3, Meteorology (10/13/2025)
- ML25290A017 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 2, Section 2.4, Hydrologic Engineering (10/13/2025)
- ML25290A021 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 2, Section 2.5, Geology, Seismology, and Geotechnical Engineering (10/13/2025)
- ML25290A035 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 3, Section 3.1, Conformance with NRC General Design Criteria (10/13/2025)
- ML25290A031 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 3, Section 3.2, Classification of Structures, Components, and Systems (10/13/2025)
- ML25290A023 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 3, Section 3.3, Wind and Tornado Loadings (10/13/2025)
- ML25290A024 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 3, Section 3.4, Water Level (Flood) Design (10/13/2025)
- ML25290A029 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 3, Section 3.5, Missile Protection (10/13/2025)
- ML25290A032 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 3, Section 3.6, Protection Against Dynamic Effects Associated with the Postulated Rupture of Piping (10/13/2025)
- ML25290A030 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 3, Section 3.7, Seismic Design (10/13/2025)
- ML25290A025 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 3, Section 3.8, Design of Category I Structures (10/13/2025)
- ML25290A027 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 3, Section 3.9, Mechanical Systems and Components (10/13/2025)
- ML25290A022 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 3, Section 3.10, Seismic Qualification* of Seismic Category I Instrumentation and Electrical Equipment (10/13/2025)
- ML25290A033 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 3, Section 3.11, Environmental Design of Mechanical and Electrical Equipment (10/13/2025)
- ML25290A028 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 3, Section 3.12, Separation Criteria for Safety Related Mechanical and Electrical Power Equipment (10/13/2025)
- ML25290A034 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 3, Section 3.13, Compliance with NRC Regulatory Guides (10/13/2025)
- ML25290A026 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 3, Section 3.14, License Renewal Programs, TLAA, and Commitments (10/13/2025)
- ML25290A038 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 4, Section 4.1, Summary Description (10/13/2025)
- ML25290A041 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 4, Section 4.2, Fuel System Design (10/13/2025)
- ML25290A040 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 4, Section 4.3, Nuclear Design (10/13/2025)
- ML25290A036 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 4, Section 4.4, Thermal and Hydraulic Design (10/13/2025)
- ML25290A037 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 4, Section 4.5, Reactor Materials (10/13/2025)
- ML25290A039 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 4, Section 4.6, Functional Design of Reactivity Control Systems (10/13/2025)
- ML25290A043 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 5, Section 5.1, Summary Description (10/13/2025)
- ML25290A044 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 5, Section 5.2, Integrity of Reactor Coolant Pressure Boundary (10/13/2025)
- ML25290A042 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 5, Section 5.3, Reactor Vessel (10/13/2025)
- ML25290A045 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 5, Section 5.4, Component and Subsystem Design (10/13/2025)
- ML25290A050 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 6, Engineered Safety Features (10/13/2025)
- ML25290A049 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 6, Section 6.1, Engineered Safety Feature Materials (10/13/2025)
- ML25290A055 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 6, Section 6.2, Containment Systems (10/13/2025)
- ML25290A047 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 6, Section 6.3, Emergency Core Cooling Systems (10/13/2025)
- ML25290A052 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 6, Section 6.4, Habitability Systems (10/13/2025)
- ML25290A051 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 6, Section 6.5, Fission Product Removal and Control Systems (10/13/2025)
- ML25290A048 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 6, Section 6.6, In-Service Inspection of Class 2 and 3 Components (10/13/2025)
- ML25290A056 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 6, Section 6.7, Main Steam Isolation Valve Leakage Isolated Condenser Treatment Method (10/13/2025)
- ML25290A054 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 6, Appendix 6A, Sub-compartment Differential Pressure Considerations (10/13/2025)
- ML25290A053 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 6, Appendix 6B, Compartment Differential Pressure Analysis Description (10/13/2025)
- ML25290A057 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 7, Section 7.1, Introduction (10/13/2025)
- ML25290A059 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 7, Section 7.2, Reactor Trip System - (Reactor Protection System) - Instrumentation and Controls (10/13/2025)
- ML25290A061 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 7, Section 7.3, Engineered Safety Feature Systems (10/13/2025)
- ML25290A058 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 7, Section 7.4, Systems Required for Safe Shutdown (10/13/2025)
- ML25290A060 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 7, Section 7.5, Safety Related Display Instrumentation (SRDI) (10/13/2025)
- ML25290A063 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 7, Section 7.6, All Other Instrumentation Systems Required for Safety (10/13/2025)
- ML25290A062 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 7, Section 7.7, Control Systems Not Required for Safety (10/13/2025)
- ML25290A064 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 8, Section 8.1, Introduction (10/13/2025)
- ML25290A066 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 8, Section 8.2, Offsite Power System (10/13/2025)
- ML25290A065 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 8, Section 8.3, On-Site Power Systems (10/13/2025)
- ML25290A068 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 9, Section 9.1, Fuel Storage and Handling (10/13/2025)
- ML25290A070 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 9, Section 9.2, Water Systems (10/13/2025)
- ML25290A072 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 9, Section 9.3, Process Auxiliaries (10/13/2025)
- ML25290A067 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 9, Section 9.4, Air Conditioning, Heating, Cooling and Ventilation Systems (10/13/2025)
- ML25290A071 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 9, Section 9.5, Other Auxiliary Systems (10/13/2025)
- ML25290A073 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 9, Appendix 9A, Analysis for Non Seismic Spent Fuel Pool Cooling Systems (10/13/2025)
- ML25290A069 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 9, Appendix 9B, Compliance with NRC Branch Technical Position ASB 9-1 Susquehanna Steam Electric Station Unit 1 Reactor Building Crane (10/13/2025)
- ML25290A076 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 10, Section 10.1, Summary Description (10/13/2025)
- ML25290A075 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 10, Section 10.2, Turbine Generator (10/13/2025)
- ML25290A077 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 10, Section 10.3, Main Steam Supply System (10/13/2025)
- ML25290A074 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 10, Section 10.4, Other Features of the Steam and Power Conversion System (10/13/2025)
- ML25290A078 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 11, Section 11.1, Source Terms (10/13/2025)
- ML25290A083 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 11, Section 11.2, Liquid Waste Management Systems (10/13/2025)
- ML25290A080 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 11, Section 11.3, Gaseous Waste Management Systems (10/13/2025)
- ML25290A081 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 11, Section 11.4, Solid Waste Management System (10/13/2025)
- ML25290A079 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 11, Section 11.5, Process and Effluent Radiolgocial Monitoring and Sampling Systems (10/13/2025)
- ML25290A082 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 11, Section 11.6, Low Level Radwaste holding Facility (LLRWHF) (10/13/2025)
- ML25290A084 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 11, Section 11.7, Independent "Dry Fuel Storage" (10/13/2025)
- ML25290A089 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 12, Section 12.1, Ensuring that Occupational Radiation Exposures are as Low as Reasonably Achievable (ALARA) (10/13/2025)
- ML25290A087 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 12, Section 12.2, Radiation Sources (10/13/2025)
- ML25290A085 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 12, Section 12.3, Radiation Protection Design Features (10/13/2025)
- ML25290A086 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 12, Section 12.4, Dose Assessment (10/13/2025)
- ML25290A088 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 12, Section 12.5, Radiation Protection Program (10/13/2025)
- ML25290A094 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 13, Section 13.1, Organizational Structure (10/13/2025)
- ML25290A091 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 13, Section 13.2, Training Program (10/13/2025)
- ML25290A090 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 13, Section 13.3, Emergency Planning (10/13/2025)
- ML25290A092 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 13, Section 13.4, Review and Audit (10/13/2025)
- ML25290A093 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 13, Section 13.5, Plant Procedures (10/13/2025)
- ML25290A095 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 13, Section 13.6, Industrial Security (10/13/2025)
- ML25290A097 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 14, Section 14.1, Specific Information to be Included in Preliminary Safety Analysis Reports (10/13/2025)
- ML25290A096 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 14, Section 14.2, Specific Information to be Included in Final Safety Analysis Report (10/13/2025)
- ML25290A098 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 14, Section 14.3, Power Uprate Test Program (10/13/2025)
- ML25290A109 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 15, Accident Analyses (10/13/2025)
- ML25290A102 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 15, Section 15.1, Decrease in Reactor Coolant Temperature (10/13/2025)
- ML25290A103 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 15, Section 15.2, Increase in Reactor Pressure (10/13/2025)
- ML25290A111 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 15, Section 15.3, Decrease in Reactor Coolant System Flow Rate (10/13/2025)
- ML25290A105 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 15, Section 15.4, Reactivity And Power Distributions Anomalies (10/13/2025)
- ML25290A104 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 15, Section 15.5, Increase in Reactor Coolant Inventory (10/13/2025)
- ML25290A101 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 15, Section 15.6, Decrease in Reactor Coolant Inventory (10/13/2025)
- ML25290A100 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 15, Section 15.7, Radioactive Release From Subsystems and Components (10/13/2025)
- ML25290A099 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 15, Section 15.8, Anticipated Transients Without Scram (10/13/2025)
- ML25290A110 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 15, Section 15.9, Station Blackout (SBO) (10/13/2025)
- ML25290A106 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 15, Appendix 15a, Nuclear Safety Operational Analysis (NSOA) - (A System-Level/Qualitative Type Plant FMEA) (10/13/2025)
- ML25290A113 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 15, Appendix 15b, Accident Dose Model Descriptions (10/13/2025)
- ML25290A107 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 15, Appendix 15c, Susquehanna Steal Electric Station Unit 1 Final Safety Analysis Report - Cycle Specific Data (10/13/2025)
- ML25290A112 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 15, Appendix 15D, Susquehanna Steam Electric Station Unit 2 Final Safety Analysis Report - Cycle Specific Data (10/13/2025)
- ML25290A108 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 15, Appendix 15e, Initial Core for SSES, Units 1 and 2, Non-Limiting Events (10/13/2025)
- ML25290A116 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 16, Section 16.1, Preliminary Technical Specifications (10/13/2025)
- ML25290A115 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 16, Section 16.2, Proposed Final Technical Specifications (10/13/2025)
- ML25290A114 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 16, Section 16.3, Technical Requirements Manuals (10/13/2025)
- ML25290A118 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 17, Section 17.1, "This Section N/A to FSAR" (10/13/2025)
- ML25290A117 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 17, Section 17.2, Quality Assurance During the Operation Phase (10/13/2025)
- ML25290A121 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 18, Section 18.0, Responses To TMI Related Requirements (10/13/2025)
- ML25290A119 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 18, Section 18.1, Response To Requirements In NUREG-0737 (10/13/2025)
- ML25290A120 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 18, Section 18.2, Response to Requirements in NUREG 0694 (10/13/2025)
- ML25290A122 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, FSAR Drawings Folder, Figures referenced in the FSAR Are Withheld Under 10 CFR 2.390 (10/13/2025)
- ML25290A145 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Questions 005 (10/13/2025)
- ML25290A149 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Questions 010 (10/13/2025)
- ML25290A136 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Questions 021 (10/13/2025)
- ML25290A155 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Questions 032 (10/13/2025)
- ML25290A147 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Questions 040 (10/13/2025)
- ML25290A126 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Questions 110 (10/13/2025)
- ML25290A133 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Questions 112 (10/13/2025)
- ML25290A157 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Questions 121 (10/13/2025)
- ML25290A131 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Questions 123 (10/13/2025)
- ML25290A135 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Questions 130 (10/13/2025)
- ML25290A134 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Questions 211 (10/13/2025)
- ML25290A125 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Questions 221 (10/13/2025)
- ML25290A143 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Questions 222 (10/13/2025)
- ML25290A138 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Questions 230 (10/13/2025)
- ML25290A150 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Questions 231 (10/13/2025)
- ML25290A127 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Questions 232 (10/13/2025)
- ML25290A152 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Questions 260 (10/13/2025)
- ML25290A130 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Questions 281 (10/13/2025)
- ML25290A128 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Questions 312 (10/13/2025)
- ML25290A141 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Questions 313 (10/13/2025)
- ML25290A153 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Questions 321 (10/13/2025)
- ML25290A154 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Questions 331 (10/13/2025)
- ML25290A129 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Questions 361 (10/13/2025)
- ML25290A144 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Questions 362 (10/13/2025)
- ML25290A132 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Questions 371 (10/13/2025)
- ML25290A137 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Questions 372 (10/13/2025)
- ML25290A142 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Questions 400 (10/13/2025)
- ML25290A148 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Questions 410 (10/13/2025)
- ML25290A140 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Questions 421 (10/13/2025)
- ML25290A139 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Questions 422 (10/13/2025)
- ML25290A146 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Questions 423 (10/13/2025)
- ML25290A156 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Questions 440 (10/13/2025)
- ML25290A151 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Questions 441 (10/13/2025)
- ML25290A124 - Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Questions 442 (10/13/2025)