Home > NRC Library > ADAMS Public Documents
Holtec Decommissioning International, Response to Oyster Creek Nuclear Generating Station, License Termination Plan Request for Supplemental Information
Accession Number: ML25119A267
Date Released: Monday, June 16, 2025
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML25119A268 - Holtec Decommissioning International, Response to Oyster Creek Nuclear Generating Station, License Termination Plan Request for Supplemental Information (4/29/2025)
- ML25119A269 - Enclosure 2, Oyster Creek Nuclear Generating Station, License Termination Plan Request Revision 1, April 2025 (4/29/2025)
- ML25119A270 - Enclosure 3, Oyster Creek Historical Site Assessment, Revision 2, November 2021 (4/29/2025)
- ML25119A271 - Enclosure 4, TBD 20-6002-1362 Revision 1 "Radionuclide Selection for DCGL Development Oyster Creek Station Site Characterization Project", January 17, 2022 (4/29/2025)
- ML25119A272 - Enclosure 5, Oyster Creek Generating Station Radiological Characterization Report, Revision 1, April 24, 2023 (4/29/2025)
- ML25119A273 - Enclosure 6, Oyster Creek Nuclear Generating Station Below Grade Structures Radiological Characterization Report Revision 1, March 2024 (4/29/2025)
- ML25119A275 - Enclosure 7, Technical Support Document 25-015 Revision 0, "Building Surface DCGL Values - Oyster Creek" [Supersedes ENG-OCS-002 Revision 1, RESRAD-Build Input Parameter Sensitivity Analysis - OCS, March 6, 2024] (4/29/2025)
- ML25119A278 - Enclosure 8, ENG-OCS-004, Revision 0, RESRAD Building Surface DCGL Values Oyster Creek, April 12, 2022 (4/29/2025)
- ML25119A279 - Enclosure 9, ENG-OCS-006, Revision: 1, Area Factors for Use with Oyster Creek DCGL Values for Buildings/Structures, April 14, 2022 (4/29/2025)
- ML25119A280 - Enclosure 10, ENG-OCS-007, Revision 0, RESRAD-Onsite Probabilistic Analysis - Industrial Use Scenario Oyster Creek Station, July 25, 2023 (4/29/2025)
- ML25119A281 - Enclosure 11, ENG-OCS-008, Revision: 0, Derived Concentration Guideline Levels Values for Soil - Industrial Use Scenario Oyster Creek, July 26, 2023 (4/29/2025)
- ML25119A282 - Enclosure 12, ENG-OCS-009, Revision: 0, Area Factors for Soil - Industrial Use Scenario, August 4, 2022 (4/29/2025)
- ML25119A292 - Enclosure 13, ENG-OCS-012, Revision: 0, Basement Fill Model Probabilistic Analysis for Instantaneous Release Scenario Assuming Industrial Use Exposure Pathways Oyster Creek, November 1, 2023 (4/29/2025)
- ML25119A293 - Enclosure 14, ENG-OCS-013, Revision: 1, Basement Fill Model: Calculation of DCGLW/F Values Assuming Industrial Use Scenario Exposure Pathways Oyster Creek Station, March 6, 2024 (4/29/2025)
- ML25119A294 - Enclosure 15, ENG-OCS-014, Revision: 0, Basement Fill Model: Probabilistic Analysis for Embedded Pipes Scenario Oyster Creek Station, January 2024 (4/29/2025)
- ML25119A295 - Enclosure 16, ENG-OCS-015, Revision: 1, Basement Fill Model: Calculation of Embedded Pipe DCGL Values Oyster Creek Station, March 6, 2024 (4/29/2025)
- ML25119A296 - Enclosure 17, ENG-OCS-016, Revision: 0, Calculation of Buried Pipe DCGL Values Oyster Creek Station, February 20, 2024 (4/29/2025)
- ML25119A297 - Enclosure 18, TSD 25-032, Revision 0, "Radionuclides of Concern in Support of the Oyster Creek License Termination Plan", April 4, 2025 [Supersedes Technical Basis Document No. 24-01-12-2888 Revision 1, "Dose Contribution from Insignificant Radionuclides (4/29/2025)
- ML25119A298 - Enclosure 19, Technical Basis Document 24-108, Revision 1, "Instrument Efficiency Determination for Use in Minimum Detectable Concentration Calculations in Support of the Final Status Surveys at OCNGS" March 31, 2025 [Supersedes Revision 0] (4/29/2025)
- ML25119A299 - Enclosure 20, Oyster Creek 100 Year Land Use Outlook - Categorization and Justification, GHD, February 9, 2024 (4/29/2025)
- ML25119A301 - Enclosure 22, TSD 24-055, Revision 0, "Basement Fill Model: Probabilistic Analysis for Instantaneous Release Scenario Assuming Industrial Use Exposure Pathways" (4/29/2025)
- ML25119A302 - Enclosure 23, TSD 24-063, Revision 0, "Basement Fill Model: Calculation of DCGLW/F Values Assuming Industrial Use Scenario Exposure Pathways" (4/29/2025)
- ML25119A303 - Enclosure 24, TSD 25-060, Revision 1, "In Situ Object Counting System (ISOCS) as Applied to Final Status Survey at Oyster Creek Nuclear Generating Station", April 2, 2025 [Supersedes Revision 0] (4/29/2025)
- ML25119A306 - Enclosure 25, TSD 24-062, Revision 1, "OCNGS Structure Nuclide Fractions and Gross Activity DCGLs (DCGLGA)", April 2, 2025 [Supersedes Revision 0] (4/29/2025)
- ML25119A307 - Enclosure 26, TSD 24-081, Revision 0, "Oyster Creek Groundwater Dose Calculation Methodology to Support the License Termination Plan", January 23, 2025 (4/29/2025)
- ML25119A308 - Enclosure 27, TSD 24-103, Revision 0, "Distribution Coefficient (Kid) of Radionuclides in Soil Samples from the Oyster Creek Generating Station", March 27,2025 (4/29/2025)
- ML25119A309 - Enclosure 28, TSD 24-111, Revision 0, "Surface/Sub Surface Characterization Survey Plan for the Oyster Creek Nuclear Generating Station", December 21, 2024 (4/29/2025)
- ML25119A310 - Enclosure 29, TSD 24-085, Revision 0, "Probabilistic Dose Comparisons: Building Occupancy Scenario vs. Room Renovation Scenario", September 17, 2024 (4/29/2025)