Home > NRC Library > ADAMS Public Documents
Monticello - Submittal of Rev. 42 to the Updated Final Safety Analysis Report
Accession Number: ML25105A246
Date Released: Monday, December 22, 2025
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML25101A216 - Monticello - Submittal of Rev. 42 to the Updated Final Safety Analysis Report (4/10/2025)
- ML25105A247 - Monticello - Rev. 42 to the Updated Final Safety Analysis Report, List of Effective Pages (4/10/2025)
- ML25105A248 - Monticello - Rev. 42 to the Updated Final Safety Analysis Report, Table of Contents (4/10/2025)
- ML25105A249 - Monticello - Rev. 42 to the Updated Final Safety Analysis Report, Chapter 1, Introduction and Summary (4/10/2025)
- ML25105A250 - Monticello - Rev. 42 to the Updated Final Safety Analysis Report, Chapter 2, Site and Environs (4/10/2025)
- ML25105A251 - Monticello - Rev. 42 to the Updated Final Safety Analysis Report, Chapter 3, Reactor (4/10/2025)
- ML25105A252 - Monticello - Rev. 42 to the Updated Final Safety Analysis Report, Chapter 4, Reactor Coolant System (4/10/2025)
- ML25105A253 - Monticello - Rev. 42 to the Updated Final Safety Analysis Report, Chapter 5, Containment System (4/10/2025)
- ML25105A254 - Monticello - Rev. 42 to the Updated Final Safety Analysis Report, Chapter 6, Plant Engineered Safeguards (4/10/2025)
- ML25105A255 - Monticello - Rev. 42 to the Updated Final Safety Analysis Report, Chapter 7, Plant Instrumentation and Control Systems (4/10/2025)
- ML25105A256 - Monticello - Rev. 42 to the Updated Final Safety Analysis Report, Chapter 8, Plant Electrical Systems (4/10/2025)
- ML25105A257 - Monticello - Rev. 42 to the Updated Final Safety Analysis Report, Chapter 9, Plant Radioactive Waste Control Systems (4/10/2025)
- ML25105A258 - Monticello - Rev. 42 to the Updated Final Safety Analysis Report, Chapter 10, Plant Auxiliary Systems (4/10/2025)
- ML25105A259 - Monticello - Rev. 42 to the Updated Final Safety Analysis Report, Chapter 11, Plant Power Conversion Systems (4/10/2025)
- ML25105A260 - Monticello - Rev. 42 to the Updated Final Safety Analysis Report, Chapter 12, Plant Structures and Shielding (4/10/2025)
- ML25105A261 - Monticello - Rev. 42 to the Updated Final Safety Analysis Report, Chapter 13, Plant Operations (4/10/2025)
- ML25105A262 - Monticello - Rev. 42 to the Updated Final Safety Analysis Report, Chapter 14, Plant Safety Analysis (4/10/2025)
- ML25105A263 - Monticello - Rev. 42 to the Updated Final Safety Analysis Report, Figures (4/10/2025)
- ML25105A264 - Monticello - Rev. 42 to the Updated Final Safety Analysis Report, Chapter 15, Table of Contents, Drawings (4/10/2025)
- ML25105A265 - Monticello - Rev. 42 to the Updated Final Safety Analysis Report, Appendix A, Seismic Design Criteria (4/10/2025)
- ML25105A266 - Monticello - Rev. 42 to the Updated Final Safety Analysis Report, Appendix C, Quality Assurance Program (4/10/2025)
- ML25105A267 - Monticello - Rev. 42 to the Updated Final Safety Analysis Report, Appendix D, Pre-Operational and Startup Tests (4/10/2025)
- ML25105A268 - Monticello - Rev. 42 to the Updated Final Safety Analysis Report, Appendix E, Plant Comparative Evaluation with the Proposed AEC 70 Design Criteria (4/10/2025)
- ML25105A269 - Monticello - Rev. 42 to the Updated Final Safety Analysis Report, Appendix F, Containment Vessel Design Summary Design (4/10/2025)
- ML25105A270 - Monticello - Rev. 42 to the Updated Final Safety Analysis Report, Appendix G, Probable Maximum Flood (4/10/2025)
- ML25105A271 - Monticello - Rev. 42 to the Updated Final Safety Analysis Report, Appendix H, Reactor Pressure Vessel Design Summary Report (4/10/2025)
- ML25105A272 - Monticello - Rev. 42 to the Updated Final Safety Analysis Report, Appendix I, Evaluation of High Energy Line Breaks Outside Containment (4/10/2025)
- ML25105A273 - Monticello - Rev. 42 to the Updated Final Safety Analysis Report, Appendix J, Fire Protection Program (4/10/2025)
- ML25105A274 - Monticello - Rev. 42 to the Updated Final Safety Analysis Report, Appendix K, Renewed Operating License-USAR Supplement (4/10/2025)
- ML25107A220 - Monticello - Rev. 42 to the Updated Final Safety Analysis Report, List of Effective Pages (4/10/2025)
- ML25107A221 - Monticello - Rev. 42 to the Updated Final Safety Analysis Report, Table of Contents (4/10/2025)
- ML25107A222 - Monticello - Rev. 42 to the Updated Final Safety Analysis Report, Chapter 1, Introduction and Summary (4/10/2025)
- ML25107A223 - Monticello - Rev. 42 to the Updated Final Safety Analysis Report, Chapter 2, Site and Environs (4/10/2025)
- ML25107A224 - Monticello - Rev. 42 to the Updated Final Safety Analysis Report, Chapter 3, Reactor (4/10/2025)
- ML25107A227 - Monticello - Rev. 42 to the Updated Final Safety Analysis Report, Chapter 6, Plant Engineered Safeguards (4/10/2025)
- ML25107A228 - Monticello - Rev. 42 to the Updated Final Safety Analysis Report, Chapter 7, Plant Instrumentation and Control Systems (4/10/2025)
- ML25107A229 - Monticello - Rev. 42 to the Updated Final Safety Analysis Report, Chapter 8, Plant Electrical Systems (4/10/2025)
- ML25107A230 - Monticello - Rev. 42 to the Updated Final Safety Analysis Report, Chapter 9, Plant Radioactive Waste Control Systems (4/10/2025)
- ML25107A231 - Monticello - Rev. 42 to the Updated Final Safety Analysis Report, Chapter 10, Plant Auxiliary Systems (4/10/2025)
- ML25107A232 - Monticello - Rev. 42 to the Updated Final Safety Analysis Report, Chapter 11, Plant Power Conversion Systems (4/10/2025)
- ML25107A233 - Monticello - Rev. 42 to the Updated Final Safety Analysis Report, Chapter 12, Plant Structures and Shielding (4/10/2025)
- ML25107A234 - Monticello - Rev. 42 to the Updated Final Safety Analysis Report, Chapter 13, Plant Operations (4/10/2025)
- ML25107A238 - Monticello - Rev. 42 to the Updated Final Safety Analysis Report, Chapter 15, Table of Contents, Drawings (4/10/2025)
- ML25107A240 - Monticello - Rev. 42 to the Updated Final Safety Analysis Report, Appendix C, Quality Assurance Program (4/10/2025)
- ML25107A241 - Monticello - Rev. 42 to the Updated Final Safety Analysis Report, Appendix D, Pre-Operational and Startup Tests (4/10/2025)
- ML25107A242 - Monticello - Rev. 42 to the Updated Final Safety Analysis Report, Appendix E, Plant Comparative Evaluation with the Proposed AEC 70 Design Criteria (4/10/2025)
- ML25107A243 - Monticello - Rev. 42 to the Updated Final Safety Analysis Report, Appendix F, Containment Vessel Design Summary Design (4/10/2025)
- ML25107A244 - Monticello - Rev. 42 to the Updated Final Safety Analysis Report, Appendix G, Probable Maximum Flood (4/10/2025)
- ML25107A245 - Monticello - Rev. 42 to the Updated Final Safety Analysis Report, Appendix H, Reactor Pressure Vessel Design Summary Report (4/10/2025)
- ML25107A246 - Monticello - Rev. 42 to the Updated Final Safety Analysis Report, Appendix I, Evaluation of High Energy Line Breaks Ouside Containment (4/10/2025)
- ML25107A248 - Monticello - Rev. 42 to the Updated Final Safety Analysis Report, Appendix K, Renewed Operating License-USAR Supplement (4/10/2025)