Home > NRC Library > ADAMS Public Documents
NuScale Power, LLC, Submittal of the NuScale Standard Design Approval Application, Revision 2
Accession Number: ML25099A236
Date Released: Friday, April 18, 2025
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML25099A237 - NuScale Power, LLC, Submittal of the NuScale Standard Design Approval Application, Revision 2 (4/9/2025)
- ML25099A238 - NuScale Power, LLC - Part 1, "General and Financial Information," Revision 2 (4/9/2025)
- ML25099A239 - NuScale Power, LLC - Part 2, Chapter 1, "Introduction and General Description of the Plant," Revision 2 (4/9/2025)
- ML25099A241 - NuScale Power, LLC - Part 2, Chapter 2, "Site Characteristics and Site Parameters," Revision 2 (4/9/2025)
- ML25099A247 - NuScale Power, LLC - Part 2, Chapter 3, "Design of Structures, Systems, Components and Equipment," Revision 2 (4/9/2025)
- ML25099A249 - NuScale Power, LLC - Part 2, Chapter 4, "Reactor," Revision 2 (4/9/2025)
- ML25099A250 - NuScale Power, LLC - Part 2, Chapter 5, "Reactor Coolant System and Connecting Systems," Revision 2 (4/9/2025)
- ML25099A251 - NuScale Power, LLC - Part 2, Chapter 6, "Engineered Safety Features," Revision 2 (4/9/2025)
- ML25099A257 - NuScale Power, LLC - Part 2, Chapter 7, "Instrumentation and Controls," Revision 2 (4/9/2025)
- ML25099A258 - NuScale Power, LLC - Part 2, Chapter 8, "Electric Power," Revision 2 (4/9/2025)
- ML25099A259 - NuScale Power, LLC - Part 2, Chapter 9, "Auxiliary Systems," Revision 2 (4/9/2025)
- ML25099A261 - NuScale Power, LLC - Part 2, Chapter 10, Steam and Power Conversion System," Revision 2 (4/9/2025)
- ML25099A262 - NuScale Power, LLC - Part 2, Chapter 11, "Radioactive Waste Management," Revision 2 (4/9/2025)
- ML25099A263 - NuScale Power, LLC - Part 2, Chapter 12, "Radiation Protection," Revision 2 (4/9/2025)
- ML25099A270 - NuScale Power, LLC - Part 2, Chapter 13, "Conduct of Operations," Revision 2 (4/9/2025)
- ML25099A271 - NuScale Power, LLC - Part 2, Chapter 14, "Initial Test Program and Inspections, Tests, Analyses, and Acceptance Criteria," Revision 2 (4/9/2025)
- ML25099A272 - NuScale Power, LLC - Part 2, Chapter 15, "Transient and Accident Analyses", Revision 2 (4/9/2025)
- ML25099A273 - NuScale Power, LLC - Part 2, Chapter 16, "Technical Specification", Revision 2 (4/9/2025)
- ML25099A274 - NuScale Power, LLC - Part 2, Chapter 17, "Quality Assurance and Reliability", Revision 2 (4/9/2025)
- ML25099A275 - NuScale Power, LLC - Part 2, Chapter 18, "Human Factors Engineering", Revision 2 (4/9/2025)
- ML25099A277 - NuScale Power, LLC - Part 2, Chapter 19, "Probabilistic Risk Assessment and Severe Accident Evaluation", Revision 2 (4/9/2025)
- ML25099A279 - NuScale Power, LLC - Part 4, "US460 Generic Technical Specifications", Revision 2, Volume 1 - Specifications (4/9/2025)
- ML25099A280 - NuScale Power, LLC - Part 4, "US460 Generic Technical Specifications", Revision 2, Volume 2 - Bases (4/9/2025)
- ML25099A281 - NuScale Power, LLC - Part 7, "Exemptions", Revision 2 (4/9/2025)
- ML25099A282 - NuScale Power, LLC - Part 8, "License Conditions; Inspections, Tests, Analyses & Acceptance Criteria (ITAAC)", Revision 2 (4/9/2025)
- ML25099A283 - NuScale Power, LLC - Part 9, "Withheld Information," Revision 2 (4/9/2025)
- ML25099A284 - NuScale Power, LLC - Part 10, "Quality Assurance Program Description", Revision 2 (4/9/2025)