Home > NRC Library > ADAMS Public Documents
Tribal Ltrs re Consult on Archaeol. Testing of Site 48LN740 at Proposed Kemmerer Power Sta Unit 1 Site
Accession Number: ML25073A117
Date Released: Tuesday, March 25, 2025
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML25073A120 - Letter to D. Cooper III, Re: Consult on Archaeological Testing Plan of Sites 48LN740 And 48LN8940 at Proposed Kemmerer Power Station (3/24/2025)
- ML25083A166 - Ltr to Amos Murphy, Chairman Re Consult. on Arch. Testing of Site 48LN740 at Proposed Kemmerer Power Station (3/24/2025)
- ML25083A167 - Letter to Boyd Gourneau, Chairman Re: Consultation on Archeological Testing of Sites 48LN740 And 48LN8940 at Proposed Kemmerer Power Station (3/24/2025)
- ML25083A173 - Letter to Daniel Moon, Chairman Re: Consultation on Archeological Testing of Sites 48LN740 And 48LN8940 at Proposed Kemmerer Power Station (3/24/2025)
- ML25083A174 - Ltr to Dennis Alex, Chairman Re Consult. on Arch. Testing of Site 48LN740 at Proposed Kemmerer Power Station (3/24/2025)
- ML25083A175 - Ltr to Frank Star Comes Out, President Re Consult. on Arch. Testing of Site 48LN740 at Proposed Kemmerer Power Station (3/24/2025)
- ML25083A176 - Ltr to Forrest Tahdooahnippah, Chairman Re Consult. on Arch. Testing of Site 48LN740 at Proposed Kemmerer Power Station (3/24/2025)
- ML25083A177 - Ltr to Frank White Clay, Chairman, Re Consult. on Arch. Testing of Site 48LN740 at Proposed Kemmerer Power Station (3/24/2025)
- ML25083A180 - Ltr to Gene Small, President Re Consult. on Arch. Testing of Site 48LN740 at Proposed Kemmerer Power Station (3/24/2025)
- ML25083A181 - Ltr to Harlan Baker, Chairman Re Consult. on Arch. Testing of Site 48LN740 at Proposed Kemmerer Power Station (3/25/2025)
- ML25083A182 - Ltr to J. Garrett Renville, Chairman Re Consult. on Arch. Testing of Site 48LN740 at Proposed Kemmerer Power Station (3/24/2025)
- ML25083A183 - Ltr to Janet Alkire, Chairwoman Re Consult. on Arch. Testing of Site 48LN740 at Proposed Kemmerer Power Station (3/24/2025)
- ML25083A184 - Ltr to Jason Sheridan, Chairman Re Consult. on Arch. Testing of Site 48LN740 at Proposed Kemmerer Power Station (3/24/2025)
- ML25083A185 - Ltr to Jeffrey Stiffarm, President Re Consult. on Arch. Testing of Site 48LN740 at Proposed Kemmerer Power Station (3/24/2025)
- ML25083A187 - Ltr to Julius Murray, Chairman Re Consult. on Arch. Testing of Site 48LN740 at Proposed Kemmerer Power Station (3/24/2025)
- ML25083A188 - Ltr to Justin Gray Hawk, Sr, President Re Consult. on Arch. Testing of Site 48LN740 at Proposed Kemmerer Power Station (3/24/2025)
- ML25083A189 - Ltr to Kathleen Wooden Knife, President Re Consult. on Arch. Testing of Site 48LN740 at Proposed Kemmerer Power Station (3/24/2025)
- ML25083A190 - Ltr to Lee Juan Tyler, President Re Consult. on Arch. Testing of Site 48LN740 at Proposed Kemmerer Power Station (3/24/2025)
- ML25083A191 - Ltr to Lloyd Goggles, Chairman Re Consult. on Arch. Testing of Site 48LN740 at Proposed Kemmerer Power Station (3/24/2025)
- ML25083A192 - Ltr to Lonna Jackson-Street, Chairperson Re Consult. on Arch. Testing of Site 48LN740 at Proposed Kemmerer Power Station (3/24/2025)
- ML25083A197 - Ltr to Mark Fox, Chairman Re Consult. on Arch. Testing of Site 48LN740 at Proposed Kemmerer Power Station (3/24/2025)
- ML25083A198 - Ltr to Peter Lengkeek, Chairman Re Consult. on Arch. Testing of Site 48LN740 at Proposed Kemmerer Power Station (3/24/2025)
- ML25083A199 - Ltr to Reggie Wassana, Governor Re Consult. on Arch. Testing of Site 48LN740 at Proposed Kemmerer Power Station (3/24/2025)
- ML25083A200 - Ltr to Robert Flying Hawk, Chairman Re Consult. on Arch. Testing of Site 48LN740 at Proposed Kemmerer Power Station (3/24/2025)
- ML25083A202 - Ltr to Rodney Gervais, Jr. Re Consult. on Arch. Testing of Site 48LN740 at Proposed Kemmerer Power Station (3/24/2025)
- ML25083A203 - Ltr to Ryman LeBeau, Chairman Re Consult. on Arch. Testing of Site 48LN740 at Proposed Kemmerer Power Station (3/24/2025)
- ML25083A204 - Ltr to Shannon Wheeler, Chairman Re Consult. on Arch. Testing of Site 48LN740 at Proposed Kemmerer Power Station (3/24/2025)
- ML25083A207 - Ltr to Victoria Kitcheyan, Chairwoman Re Consult. on Arch. Testing of Site 48LN740 at Proposed Kemmerer Power Station (3/24/2025)
- ML25083A208 - Letter to Wayland Large, Chairman Re: Consultation on Archeological Testing of Sites 48LN740 And 48LN8940 at Proposed Kemmerer Power Station (3/24/2025)