Home > NRC Library > ADAMS Public Documents
Hope Creek Generating Station, Salem Generating Station, Units 1 & 2, and Peach Bottom Atomic Power Station, Units 2 & 3 - Exemption from the Requirements of 10 CFR Part 50, Sections 50.82(a)(8)(1)(A) and 50.75(h)(1)(iv) (EPID L-2024-LLE-0018)
Accession Number: ML24324A335
Date Released: Tuesday, December 31, 2024
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML24324A331 - Hope Creek Generating Station, Salem Generating Station, Units 1 & 2, and Peach Bottom Atomic Power Station, Units 2 & 3 - Exemption from the Requirements of 10 CFR Part 50, Sections 50.82(a)(8)(1)(A) and 50.75(h)(1)(iv) (EPID L-2024-LLE-0018) (Ltr) (12/23/2024)
- ML24324A332 - Hope Creek Generating Station, Salem Generating Station, Units 1 & 2, and Peach Bottom Atomic Power Station, Units 2 & 3 - Exemption from the Requirements of 10 CFR Part 50, Sections 50.82(a)(8)(1)(A) and 50.75(h)(1)(iv) (EPID L-2024-LLE-0018)(Exemption) (12/20/2024)
- ML24358A075 - Hope Creek Generating Station, Salem Generating Station, Units 1 & 2, and Peach Bottom Atomic Power Station, Units 2 & 3 - Exemption from the Requirements of 10 CFR Part 50, Sections 50.82(a)(8)(1)(A) and 50.75(h)(1)(iv) (EPID L-2024-LLE-0018)(FRN) (22 page(s), 12/23/2024)