Home > NRC Library > ADAMS Public Documents
Submittal of Revision 25 to the Fermi 2 Updated Final Safety Analysis Report (UFSAR), 10 CFR 50.59 and 10 CFR 72.48 Evaluation Summary Reports, Commitment Management Report, Revisions to the Technical Requirements Manual and the Technical....
Accession Number: ML24319A073
Date Released: Tuesday, June 24, 2025
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML24318C477 - Submittal of Revision 25 to the Fermi 2 Updated Final Safety Analysis Report (UFSAR), 10 CFR 50.59 and 10 CFR 72.48 Evaluation Summary Reports, Commitment Management Report, Revisions to the Technical Requirements Manual and the Technical.... (11/8/2024)
- ML24319A098 - Fermi 2 - Revision 25 to the Updated Final Safety Analysis Report, Appendix A, Division 1 Applicable Regulatory Guides (11/8/2024)
- ML24319A085 - Fermi 2 - Revision 25 to the Updated Final Safety Analysis Report, Appendix B, Aging Management Programs And Activities (11/8/2024)
- ML24319A099 - Fermi 2 - Revision 25 to the Updated Final Safety Analysis Report, Chapter 1, Introduction And General Description Of Plant (11/8/2024)
- ML24319A093 - Fermi 2 - Revision 25 to the Updated Final Safety Analysis Report, Chapter 2, Site Characteristics (11/8/2024)
- ML24319A092 - Fermi 2 - Revision 25 to the Updated Final Safety Analysis Report, Chapter 3, Design Of Structures, Components, Equipment, And Systems (11/8/2024)
- ML24319A084 - Fermi 2 - Revision 25 to the Updated Final Safety Analysis Report, Chapter 4, Reactor (11/8/2024)
- ML24319A091 - Fermi 2 - Revision 25 to the Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System And Connected Systems (11/8/2024)
- ML24319A083 - Fermi 2 - Revision 25 to the Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features (11/8/2024)
- ML24319A090 - Fermi 2 - Revision 25 to the Updated Final Safety Analysis Report, Chapter 7, Instrumentation And controls (11/8/2024)
- ML24319A079 - Fermi 2 - Revision 25 to the Updated Final Safety Analysis Report, Chapter 8, Electric Power (11/8/2024)
- ML24319A089 - Fermi 2 - Revision 25 to the Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems (11/8/2024)
- ML24319A088 - Fermi 2 - Revision 25 to the Updated Final Safety Analysis Report, Chapter 10, Steam And Power Conversion System (11/8/2024)
- ML24319A097 - Fermi 2 - Revision 25 to the Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste management (11/8/2024)
- ML24319A080 - Fermi 2 - Revision 25 to the Updated Final Safety Analysis Report, Chapter 12, Radiation Protection (11/8/2024)
- ML24319A096 - Fermi 2 - Revision 25 to the Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations (11/8/2024)
- ML24319A081 - Fermi 2 - Revision 25 to the Updated Final Safety Analysis Report, Chapter 14, Initial Tests and Operation (11/8/2024)
- ML24319A087 - Fermi 2 - Revision 25 to the Updated Final Safety Analysis Report, Chapter 15, Accident Analysis (11/8/2024)
- ML24319A100 - Fermi 2 - Revision 25 to the Updated Final Safety Analysis Report, Chapter 17, Quality Assurance (11/8/2024)
- ML24319A086 - Fermi 2 - Revision 25 to the Updated Final Safety Analysis Report, List of Effective Pages (11/8/2024)
- ML24319A082 - Fermi 2 - Revision 25 to the Updated Final Safety Analysis Report, Main Page (11/8/2024)
- ML24319A095 - Fermi 2 - Revision 25 to the Updated Final Safety Analysis Report, Figures (For Public Use) (11/8/2024)