Home > NRC Library > ADAMS Public Documents
Fermi, Unit 2, Inservice Testing (IST) Program for the Fourth 10-Year Inspection Interval Update
Accession Number: ML24240A352
Date Released: Wednesday, September 4, 2024
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML24240A353 - Fermi, Unit 2, Inservice Testing (IST) Program for the Fourth 10-Year Inspection Interval Update (8/27/2024)
- ML24240A354 - Fermi, Unit 2, Inservice Testing Program Fourth Ten-Year Interval - IST Program Description, Revision 4 (1/25/2021)
- ML24240A355 - Fermi, Unit 2, Inservice Testing Program for Pumps and Valves, Part 2: IST Pump Testing Program, Revision 3 (2/17/2020)
- ML24240A356 - Fermi, Unit 2, Inservice Testing Program for Pumps and Valves, Part 3: IST Pump Scope Table, Revision 4 (1/25/2021)
- ML24240A357 - Fermi, Unit 2, Inservice Testing Program for Pumps and Valves, Part 4: IST Valve Testing Program, Revision 3 (2/17/2020)
- ML24240A358 - Fermi, Unit 2, Inservice Testing Program for Pumps and Valves, Part 5: IST Valve Scope Table, Revision 5 (7/11/2024)
- ML24240A359 - Fermi, Unit 2, Inservice Testing Program for Pumps and Valves, Part 6: IST Check Valve Condition Monitoring Plans, Revision 3 (1/14/2022)
- ML24240A360 - Fermi, Unit 2, Inservice Testing Program for Pumps and Valves, Part 7: IST Program Relief Requests, Revision 3 (1/25/2021)
- ML24240A361 - Fermi, Unit 2, Inservice Testing Program for Pumps and Valves, Part 8: IST Program Cold Shutdown Justifications, Revision 4 (2/3/2021)
- ML24240A362 - Fermi, Unit 2, Inservice Testing Program for Pumps and Valves, Part 9: IST Program Refueling Outage Justifications, Revision 4 (2/3/2021)
- ML24240A363 - Fermi, Unit 2, Inservice Testing Program for Pumps and Valves, Part 10: IST Program Technical Position, Revision 2 (1/14/2022)
- ML24240A365 - Fermi, Unit 2, Inservice Testing Program for Pumps and Valves, Part 11: 1st Program Valve Basis, Revision 2 (6/27/2024)
- ML24240A364 - Fermi, Unit 2, Inservice Testing Program for Pumps and Valves, Part 12: IST Program Pump Basis, Revision 1 (1/25/2021)