Inspection Manual Change Notice 25-014
Accession Number: ML24200A230
Date Released: Wednesday, May 28, 2025
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML25147A267 - Inspection Manual Change Notice 25-014 (5/28/2025)
- ML25147A268 - Table of Contents for Inspection Manual Change Notice 25-014 (5/28/2025)
- ML24200A232 - IP 88200 Safety Significant Items (and Services) During Construction of Fuel Cycle Facilities (5/28/2025)
- ML24200A240 - IP 88200.A, Inspection of Foundations and Buildings at Fuel Cycle Facilities (5/28/2025)
- ML24205A237 - IP 88200.B, Inspection of Structural Concrete at Fuel Cycle Facilities (5/28/2025)
- ML24206A259 - IP 88200.C, Inspection of Structural Steel and Supports at Fuel Cycle Facilities (5/28/2025)
- ML24215A335 - IP 88200.D, Inspection of Piping at Fuel Cycle Facilities (5/28/2025)
- ML24215A336 - IP 88200.E, Inspection of Piping Supports and Restraints at Fuel Cycle Facilities (5/28/2025)
- ML24215A337 - IP 88200.F, Inspection of Mechanical Components at Fuel Cycle Facilities (5/28/2025)
- ML24215A338 - IP 88200.G, Inspection of Electrical Cable at Fuel Cycle Facilities (5/28/2025)
- ML24226A366 - IP 88200.H, Inspection of Electrical Components and Systems at Fuel Cycle Facilities (5/28/2025)
- ML24227B019 - IP 88200.I, Inspection of Ventilation and Confinement Systems at Fuel Cycle Facilities (5/28/2025)
- ML24232A168 - IP 88200.J, Inspection of Instrumentation and Control Systems at Fuel Cycle Facilities (5/28/2025)
- ML24232A169 - IP 88200.K, Inspection of Safety-Significant Welding at Fuel Cycle Facilities (5/28/2025)
- ML24232A170 - IP 88200.L, Inspection of Fire Protection Systems Under Construction at Fuel Cycle Facilities (5/28/2025)
- ML24241A219 - IP 88200.M, Inspection of Digital instrumentation and Control (DI&C) System/Software Design at Fuel Cycle Facilities (5/28/2025)