Home > NRC Library > ADAMS Public Documents
Summary of June 27, 2024, Partially Closed Hybrid Pre-Submittal Meeting with Studsvik Scandpower Inc. Regarding Supplement to SSP 14-P01/028-TR-P-A, "Generic Application of Studsvik Scandpower Core Management System to Pressured Water Reactors"
Accession Number: ML24179A333
Date Released: Friday, July 26, 2024
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML24177A271 - 27Jun2024 Studsvik Pre-Submittal Meeting Open Session Slides ([EstimatedPageCount] page(s), 6/27/2024)
- ML24178A120 - June 27, 2024 Pre-submittal Meeting on Supplement to Studsvik CMS5 Topical Report (Presentation Affidavit) (2 page(s), 6/27/2024)
- ML24178A122 - June 27, 2024 Pre-submittal Meeting on Supplement to Studsvik CMS5 Topical Report (Non-Proprietary Slides) (5 page(s), 6/27/2024)
- ML24178A123 - June 27, 2024 Pre-submittal Meeting on Supplement to Studsvik CMS5 Topical Report (Redacted Slides) (28 page(s), 6/27/2024)
- ML24179A003 - 06/27/2024 Partially Closed Pre-Submittal Meeting for a Supplement to Studsvik Scandpower Inc SSP-14-P01/028-TR-P-A, "Generic Application of the Studsvik Scandpower Core Management System to Pressured Water Reactors" Topical Report (2 page(s), 6/27/2024)
- ML24179A324 - 06/27/202 Summary of Partially Closed Hybrid Pre-Submittal Meeting with Studsvik Scandpower Inc. Regarding Supplement to SSP 14-P01/028-TR-P-A, "Generic Application of Studsvik Scandpower Core Management System to Pressured Water Reactors" ([EstimatedPageCount] page(s), 7/18/2024)