Home > NRC Library > ADAMS Public Documents
Turkey Point, Units 3 and 4 - Periodic Update to the Updated Final Safety Analysis Report
Accession Number: ML24135A107
Date Released: Wednesday, June 26, 2024
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML24135A094 - Turkey Point, Units 3 and 4 - Periodic Update to the Updated Final Safety Analysis Report (5 page(s), 5/9/2024)
- ML24135A082 - Turkey Point, Units 3 and 4 - Periodic Update to the Updated Final Safety Analysis Report, List of Effective Pages (5/9/2024)
- ML24135A090 - Turkey Point, Units 3 and 4 - Periodic Update to the Updated Final Safety Analysis Report, Chapter 1, Introduction and Summary (5/9/2024)
- ML24135A104 - Turkey Point, Units 3 and 4 - Periodic Update to the Updated Final Safety Analysis Report, Chapter 2. Site and Environment (5/9/2024)
- ML24135A103 - Turkey Point, Units 3 and 4 - Periodic Update to the Updated Final Safety Analysis Report, Chapter 3, Reactor (5/9/2024)
- ML24135A106 - Turkey Point, Units 3 and 4 - Periodic Update to the Updated Final Safety Analysis Report, Chapter 4, Reactor Coolant System (5/9/2024)
- ML24135A096 - Turkey Point, Units 3 and 4 - Periodic Update to the Updated Final Safety Analysis Report, Chapter 5, Structures (5/9/2024)
- ML24135A100 - Turkey Point, Units 3 and 4 - Periodic Update to the Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features (5/9/2024)
- ML24135A086 - Turkey Point, Units 3 and 4 - Periodic Update to the Updated Final Safety Analysis Report, Chapter 7, Instrument and Control (5/9/2024)
- ML24135A098 - Turkey Point, Units 3 and 4 - Periodic Update to the Updated Final Safety Analysis Report, Chapter 8, Electrical Systems (5/9/2024)
- ML24135A105 - Turkey Point, Units 3 and 4 - Periodic Update to the Updated Final Safety Analysis Report, Chapter 9, Auxiliary and Emergency Systems (5/9/2024)
- ML24135A089 - Turkey Point, Units 3 and 4 - Periodic Update to the Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System (5/9/2024)
- ML24135A101 - Turkey Point, Units 3 and 4 - Periodic Update to the Updated Final Safety Analysis Report, Chapter 11, Waste Disposal and Radiation Protection System (5/9/2024)
- ML24135A099 - Turkey Point, Units 3 and 4 - Periodic Update to the Updated Final Safety Analysis Report, Chapter 12, Conduct of Operations (5/9/2024)
- ML24135A097 - Turkey Point, Units 3 and 4 - Periodic Update to the Updated Final Safety Analysis Report, Chapter 13, Initial Tests and Operations (5/9/2024)
- ML24135A085 - Turkey Point, Units 3 and 4 - Periodic Update to the Updated Final Safety Analysis Report, Chapter 14, Safety Analysis (5/9/2024)
- ML24135A091 - Turkey Point, Units 3 and 4 - Periodic Update to the Updated Final Safety Analysis Report, Chapter 14, Appendices A through G (5/9/2024)
- ML24135A093 - Turkey Point, Units 3 and 4 - Periodic Update to the Updated Final Safety Analysis Report, Chapter 15, Technical Specifications (5/9/2024)
- ML24135A087 - Turkey Point, Units 3 and 4 - Periodic Update to the Updated Final Safety Analysis Report, Chapter 16, Aging Management Programs and Time-Limited Aging Analyses Activities (5/9/2024)
- ML24135A095 - Turkey Point, Units 3 and 4 - Periodic Update to the Updated Final Safety Analysis Report, Chapter 17, Aging Management Programs and Time-Limited Aging Analysis Activities (5/9/2024)
- ML24135A092 - Turkey Point, Units 3 and 4 - Periodic Update to the Updated Final Safety Analysis Report, Appendix A, Functional Evaluation of the Components of the Systems Which Are Shared by the Two Units (5/9/2024)
- ML24135A084 - Turkey Point, Units 3 and 4 - Periodic Update to the Updated Final Safety Analysis Report, Appendix B, Questions and Responses Related to Initial NRC Review of Operating License Application (5/9/2024)
- ML24135A102 - Turkey Point, Units 3 and 4 - Periodic Update to the Updated Final Safety Analysis Report, Cover Sheet (5/9/2024)
- ML24135A083 - Turkey Point, Units 3 and 4 - Periodic Update to the Updated Final Safety Analysis Report, Technical Requirements Manual (TRM), Revision 0 (5/9/2024)
- ML24135A114 - Turkey Point, Units 3 and 4 - Periodic Update to the Updated Final Safety Analysis Report, Technical Specifications Bases, Revision 0 (5/9/2024)