Home > NRC Library > ADAMS Public Documents
Pre-Federal Register Announcement of Public Availability for Interim Staff Guidance - DANU-ISG-2022-01 through 2022-09, "Review of Risk-Informed, Technology-Inclusive Advanced Reactor Applications"
Accession Number: ML24073A229
Date Released: Monday, March 25, 2024
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML23277A139 - Interim Staff Guidance - DANU-ISG-2022-01, Advanced Reactor Content of Application Project, "Review of Risk-Informed, Technology-Inclusive Advanced Reactor Applications - Roadmap" (132 page(s), 3/31/2024)
- ML23277A140 - Interim Staff Guidance - DANU-ISG-2022-02, Advanced Reactor Content of Application Project Chapter 2, "Site Information" (34 page(s), 3/31/2024)
- ML23277A141 - Interim Staff Guidance - DANU-ISG-2022-03, Advanced Reactor Content of Application Project Chapter 9, "Control of Routine Plant Radioactive Effluents, Plant Contamination and Solid Waste" (17 page(s), 3/31/2024)
- ML23277A142 - Interim Staff Guidance - DANU-ISG-2022-04, Advanced Reactor Content of Application Project Chapter 10, "Control of Occupational Dose" (10 page(s), 3/31/2024)
- ML23277A143 - Interim Staff Guidance - DANU-ISG-2022-05, Advanced Reactor Content of Application Project Chapter 11, "Organization and Human-System Considerations" (23 page(s), 3/31/2024)
- ML23277A144 - Interim Staff Guidance - DANU-ISG-2022-06, Advanced Reactor Content of Application Project Chapter 12, "Post-manufacturing and Construction Inspection, Testing, and Analysis Program" (21 page(s), 3/31/2024)
- ML23277A145 - Interim Staff Guidance - DANU-ISG-2022-07, Advanced Reactor Content of Application Project, "Risk-Informed Inservice Inspection/Inservice Testing" (24 page(s), 3/31/2024)
- ML23277A146 - Interim Staff Guidance - DANU-ISG-2022-08, Advanced Reactor Content of Application Project, "Risk-Informed Technical Specifications" (22 page(s), 3/31/2024)
- ML23277A147 - Interim Staff Guidance - DANU-ISG-2022-09, Advanced Reactor Content of Application Project, "Risk-informed, Performance-based Fire Protection Program (for Operations)" (15 page(s), 3/31/2024)
- ML23277A148 - Analysis of Public Comments on Draft DANU-ISG-2022-01, Advanced Reactor Content of Application Project, "Review of Risk-Informed, Technology-Inclusive Advanced Reactor Applications - Roadmap" (37 page(s), 3/25/2024)
- ML23277A149 - Analysis of Public Comments on Draft DANU-ISG-2022-02, Advanced Reactor Content of Application Project Chapter 2, "Site Information" (8 page(s), 3/25/2024)
- ML23277A150 - Analysis of Public Comments on Draft DANU-ISG-2022-03, Advanced Reactor Content of Application Project Chapter 9, "Control of Routine Plant Radioactive Effluents, Plant Contamination and Solid Waste" (8 page(s), 3/25/2024)
- ML23277A151 - Analysis of Public Comments on Draft DANU-ISG-2022-04, Advanced Reactor Content of Application Project Chapter 10, "Control of Occupational Dose" (2 page(s), 3/25/2024)
- ML23277A152 - Analysis of Public Comments on Draft DANU-ISG-2022-05, Advanced Reactor Content of Application Project Chapter 11, "Organization and Human-System Considerations" (9 page(s), 3/25/2024)
- ML23277A153 - Analysis of Public Comments on Draft DANU-ISG-2022-06, Advanced Reactor Content of Application Project Chapter 12, "Post-construction Inspection, Testing, and Analysis Program" (9 page(s), 3/25/2024)
- ML23277A154 - Analysis of Public Comments on Draft DANU-ISG-2022-07, Advanced Reactor Content of Application Project, "Risk-Informed Inservice Inspection/Inservice Testing" (20 page(s), 3/25/2024)
- ML23277A155 - Analysis of Public Comments on Draft DANU-ISG-2022-08, Advanced Reactor Content of Application Project, "Risk-Informed Technical Specifications" (6 page(s), 3/31/2024)
- ML23277A156 - Analysis of Public Comments on Draft DANU-ISG-2022-09, Advanced Reactor Content of Application Project, "Risk-informed, Performance-based Fire Protection Program (for Operations)" (16 page(s), 3/25/2024)
- ML23297A158 - Redline Strikeout for Interim Staff Guidance - DANU-ISG-2022-01, Advanced Reactor Content of Application Project, "Review of Risk-Informed, Technology-Inclusive Advanced Reactor Applications - Roadmap" (132 page(s), 3/31/2024)
- ML23297A159 - Redline Strikeout for Interim Staff Guidance - DANU-ISG-2022-02, Advanced Reactor Content of Application Project Chapter 2, "Site Information" (34 page(s), 3/31/2024)
- ML23297A160 - Redline Strikeout for Interim Staff Guidance - DANU-ISG-2022-03, Advanced Reactor Content of Application Project Chapter 9, "Control of Routine Plant Radioactive Effluents, Plant Contamination and Solid Waste" (17 page(s), 3/31/2024)
- ML23297A161 - Redline Strikeout for Interim Staff Guidance - DANU-ISG-2022-04, Advanced Reactor Content of Application Project Chapter 10, "Control of Occupational Dose" (10 page(s), 3/31/2024)
- ML23297A162 - Redline Strikeout for Interim Staff Guidance - DANU-ISG-2022-05, Advanced Reactor Content of Application Project Chapter 11, "Organization and Human-System Considerations" (23 page(s), 3/31/2024)
- ML23297A163 - Redline Strikeout for Interim Staff Guidance - DANU-ISG-2022-06, Advanced Reactor Content of Application Project Chapter 12, "Post-manufacturing and Construction Inspection, Testing, and Analysis Program" (21 page(s), 3/25/2024)
- ML23297A164 - Redline Strikeout for Interim Staff Guidance - DANU-ISG-2022-07, Advanced Reactor Content of Application Project, "Risk-Informed Inservice Inspection/Inservice Testing" (24 page(s), 3/31/2024)
- ML23297A165 - Redline Strikeout for Interim Staff Guidance - DANU-ISG-2022-08, Advanced Reactor Content of Application Project, "Risk-Informed Technical Specifications" (22 page(s), 3/31/2024)
- ML23297A166 - Redline Strikeout for Interim Staff Guidance - DANU-ISG-2022-09, Advanced Reactor Content of Application Project, "Risk-informed, Performance-based Fire Protection Program (for Operations)" (15 page(s), 3/31/2024)
- ML24024A025 - Response to the Advisory Committee on Reactor Safeguards Letter, “Review of Advanced Reactor Content of Application Project/Technology-Inclusive Content of Application Project Guidance" (3/18/2024)